This series consists of photographs primarily relating to projects on the Ohio River and the Kentucky River. These photographs document the building and maintenance of locks, dams, and bridges, as well as, extraordinary circumstances such as boating accidents and floods.
Box # |
Lock # |
Folder # |
Site |
Project/Subject |
Date |
Description |
1 |
1 |
1 |
Kentucky River |
Lock and Dam No. 1 |
8/10/1883 |
"View W. from East side of breach excavation, shows breach, crib work, dam, lock houses, etc." (KY.R. L-1/3); H11-K1-4 |
1 |
1 |
2 |
Kentucky River |
Lock and Bank |
|
View from left bank, corner gates open (KY.R. L-1/8); H11-K1-16 |
1 |
1 |
3 |
Kentucky River |
Lock and Dam No. 1 |
8/10/1883 |
"View S.E. from right bank a little above lock, shows upper gates and operating machinery, also dam, breach crib, etc." (KY.R. L-1/2); H11-K1-3 |
1 |
1 |
4 |
Kentucky River |
Lock and Dam No. 1 |
8/10/1883 |
"View north shows breach, crib work, etc." (KY.R. L-1/1); H11-K1-2 |
1 |
1 |
5 |
Kentucky River |
Lock and Dam No. 1 |
8/10/1883 |
"View S of E from right bank below lock, shows lower gates, (open), etc." (KY.R. L-1/4); H11-K1-5; men at work |
1 |
1 |
6 |
Kentucky River |
Lock and Dam No. 1 |
8/10/1883 |
"View N.E. from hurricane deck of Str "U.S." shows lower end of old dam, breach cribs, etc." (KY.R. L-1/5); H11-K1-6 |
1 |
1 |
7 |
Kentucky River |
Lock and Dam No. 1 |
8/10/1883 |
"View south, shows breach, cribs, etc." (KY.R. L-1/7); H11-K1-7; steam boat "United States" shown |
1 |
1 |
8 |
Kentucky River |
Lock and Bank |
|
North view of lock (KY.R. L-1/6); H11-K1-17 [finding aid: and H11-K1-2) |
1 |
1 |
9 |
Kentucky River |
Lock and Bank |
|
View of lock; H11-K1-1; scenic panoramic shot of completed project |
1 |
1 |
10 |
Kentucky River |
Dam |
|
"Hole made in dam to drain the pool" (KY.R. L-1/11); H11-K1-15; very small shot of dam with flow of water, poor quality |
1 |
1 |
10 |
Kentucky River |
Dam |
|
"Concreting on top of foundation cribs is in progress" (KY.R. L-1/13); H11-K1-11; very small shot of men at work, relatively poor quality |
1 |
1 |
10 |
Kentucky River |
Dam |
|
"Before work began: shows ragged condition of downstream steps" (KY.R. L-1/10); H11-K1-9; very small shot of dam in progess with two men at work and a house on a hill |
1 |
1 |
10 |
Kentucky River |
Dam |
|
"The dam is partially removed and concreting has begun at the abutment" (KY. R. L-1/12); H11-K1-10; very small shot of men at work on construction site |
1 |
1 |
11 |
Kentucky River |
Dam No. 1 |
|
"Shows facing on top of finished concrete, near abutment" (KY.R. L-1/15); H11-K1-13; very small shot from side of men at work on dam |
1 |
2 |
12 |
Kentucky River |
Lock |
11/22/1932 |
"Landward Lower Gate"; H11-K2-6; 36/2-B; shows men at work |
1 |
2 |
12 |
Kentucky River |
Lock |
11/22/1932 |
""Lower End of Lockpit"; H11-K2-9; 36/2-B; shows men at work |
1 |
2 |
13 |
Kentucky River |
Lock |
11/22/1932 |
"Head Logs being installed with gates in place"; H11-K2-7; 36/2-B |
1 |
2 |
13 |
Kentucky River |
Lock |
11/22/1932 |
"Upper Gates. Head Logs being installed with gates in place"; H11-K2-8; 36/2-B |
1 |
2 |
14 |
Kentucky River |
Lock |
|
winter showing Muhlenburg barge through lock no. (KY.R. L-2/80.1); blurry photo of men at work in winter |
1 |
2 |
14 |
Kentucky River |
Lock |
|
winter showing Muhlenburg barge through lock no. (KY.R. L-2/80.1); blurry photo of men at work in winter |
1 |
2 |
15 |
Kentucky River |
Lock |
|
winter showing Muhlenburg barge through lock no. (KY.R. L-2/80.1); blurry photo of men at work in winter |
1 |
2 |
15 |
Kentucky River |
Lock |
|
winter showing Muhlenburg barge through lock no. (KY.R. L-2/80.1); H11-K2-13; blurry photo of men at work in winter |
1 |
2 |
16 |
Kentucky River |
Lock |
|
pipe in lock no. 2 |
1 |
2 |
16 |
Kentucky River |
Lock |
|
pipe in lock no. 2 |
1 |
2 |
17 |
Kentucky River |
Lock |
|
pipe in lock no. 2 |
1 |
2 |
17 |
Kentucky River |
Lock |
|
pipe in lock no. 2; H11-K2-14 |
1 |
2 |
18 |
Kentucky River |
Lock and Dam No. 2 |
8/7/1951 |
"Showing new lower gates in open position in foreground. File No. 25730"; H11-K2-10; Shot from within dam, showing men at work and people in the boat "Mallie, Cincinnati" |
1 |
2 |
18 |
Kentucky River |
Lock and Dam No. 2 |
8/7/1951 |
"Upstream side of new upper gates. File No. 25725"; H11-K2-11 |
1 |
2 |
19 |
Kentucky River |
Lock and Dam No. 2 |
8/7/1951 |
"Upstream side of new lower gates land leaf port open. File No. 25728"; H11-K2-12; shot of lock with gates open revealing men at work |
1 |
2 |
19 |
Kentucky River |
Lock and Dam No. 2 |
|
Scenic shot of lock from the water (KY.R. L-2/31); H11-K2-3 |
1 |
2 |
20 |
Kentucky River |
Lock and Dam No. 2 |
|
"View west from right bank below dam" (KY.R. L-2/5); H11-K2-5 |
1 |
2 |
21 |
Kentucky River |
Dam No. 2 |
|
Scenic shot of dam from the water (KY.R. L-2/3.1); H11-K2-3 |
1 |
2 |
22 |
Kentucky River |
Lock & Dam No 2 |
8/9/1883 |
"View West From Right Bank Below Dam" (KY.R. L-2/2); H11-K2-2; nice scenic shot of dam |
1 |
1 |
11 |
Kentucky River |
Lock No. 1 |
|
general view (KY.R. L-1/16); H11-K1-14; very small shot of lock from one side |
1 |
1 |
11 |
Kentucky River |
Dam No. 1 |
|
"Concreting on top of foundation cribs is in progress. Shows how the bond is made from abutment to lock. 8' masc height at crest of dam" (KY.R. L-1/14); H11-K1-12; very small shot of men at work on dirt mound |
1 |
2 |
23 |
Kentucky River |
Lock & Dam No. 2 |
8/9/1883 |
"View west from right bank above dam" (KY.R. L-2/1); H11-K2-4; nice scenic shot of dam from side |
1 |
3 |
24 |
Kentucky River |
Lock No. 3 |
|
general view of lock; H11-K3-15; very small photo |
1 |
3 |
24 |
Kentucky River |
Lock No. 3 |
|
general view of lock; very small photo |
1 |
3 |
24 |
Kentucky River |
Gate Wrench |
7/2/1958 |
"Gate Wrench installed 2 July 1958 showing typical installation"; H10-KM-4; very small photo showing man with wrench |
1 |
3 |
25 |
Kentucky River |
Lock No. 3 |
7/2/1958 |
"View showing gate and wall damaged by M/V chapron"; H11-K3-15; general view of lock |
1 |
3 |
25 |
Kentucky River |
Lock No. 3 |
7/2/1958 |
"Gate Wrench installed 2 July 1958 showing typical installation"; H10-KM-4; shows man with wrench |
1 |
3 |
26 |
Kentucky River |
Lock No. 3 |
|
shot of lock from side, during construction process (KY.R. L-3/13); H11-K3-27 |
1 |
3 |
26 |
Kentucky River |
Lock No. 3 |
11/10/1899 |
"Upper breast setting; 253-287.5 from Lock wall" (KY.R. L-3/9); H11-K3-17 |
1 |
3 |
27 |
Kentucky River |
Lock No. 3 |
9/10/1918 |
"Lock 3 Abutment Crib" (KY.R. L-3/22.3); H11-K3-18; "file as [3/4]/12"; small photo of bank from water |
1 |
3 |
27 |
Kentucky River |
Lock No. 3 |
9/10/1918 |
"Lock 3 Abutment Crib" (KY.R. L-3/22.2); H11-K3-19; "file as [3/4]/12"; small photo of bank from water |
1 |
3 |
27 |
Kentucky River |
Lock No. 3 |
9/10/1918 |
"Lock 3 Abutment Crib" (KY.R. L-3/22); H11-K3-22; "file as [3/4]/12"; small photo of bank from water |
1 |
3 |
27 |
Kentucky River |
Lock No. 3 |
9/10/1918 |
"Lock 3 Abutment Crib" (KY.R. L-3/22.1); H11-K3-20; "file as [3/4]/12"; small photo of lock from bank |
1 |
3 |
27 |
Kentucky River |
Lock No. 3 |
9/10/1918 |
"Lock 3 Abutment Crib, straight down the wall from top of Abutment" (KY.R. L-3/22.4); H11-K3-21; "file as [3/4]/12"; small photo of bank from abutment |
1 |
3 |
28 |
Kentucky River |
Lock |
|
Medium size scenic shot of lock from bank (KY.R. L-3/21); H11-K3-23 |
1 |
3 |
28 |
Kentucky River |
Lock No. 3 |
11/10/1899 |
"Lower end upper river crib" (KY.R. L-3/10); H11-K3-24; medium size shot showing men at work |
1 |
3 |
29 |
Kentucky River |
Lock No. 3 |
|
"1901"; shot of inside of lock from water (KY.R. L-3/16); H11-K3-25 |
1 |
3 |
29 |
Kentucky River |
Lock No. 3 |
|
"1901"; shot of lock during construction (KY.R. L-3/17.1); H11-K3-26 |
1 |
3 |
30 |
Kentucky River |
Lock 3 |
|
"Upper River Crib - Nov 1901, showing cap timbers on piles at lower end; tops of piles about 3.0 below U.M. Sill level" (KY.R. L-3/18); H11-K3-28; shows lock during construction and men at work |
1 |
3 |
30 |
Kentucky River |
Lock 3 |
|
shows lock during construction, with men at work on bank and small raft, with a house in the background overlooking construction site (KY.R. L-3/11.3); H11-K3-9 |
1 |
3 |
31 |
Kentucky River |
Lock No. 3 |
11/10/1899 |
"View of upper breast sheeting at junction with river wall of lock…" (KY.R. L-3/8); H11-K3-16 |
1 |
3 |
31 |
Kentucky River |
Lock 3 |
|
"1901"; shot of lock during construction, many men at work, boat in background (KY.R. 3/11.1); H11-K3-7 |
1 |
3 |
32 |
Kentucky River |
Lock 3 |
|
"1901"; shot of lock during construction, with men and women surveying the site from atop dam (KY.R. L-3/11.2); H11-K3-8; on back: "John M.G. Watt, Frankfurt Ky" |
1 |
3 |
32 |
Kentucky River |
Lock 3 |
|
"1901"; shot of many workmen on site during construction (KY.R. L-3/11); H11-K3-6 |
1 |
3 |
33 |
Kentucky River |
Lock No. 3 |
11/16/1899 |
"View from Triangular crib; showing upper land crib and portion of…" (KY.R. L-3/9); H11-K3-5; shot of dam during construction with a couple men near site and a house on the hill |
1 |
3 |
33 |
Kentucky River |
Lock No. 3 |
11/14/1899 |
"Upper breast sheeting; 253-287.5 from lock wall (2 on rod at water surface)" (KY.R. L-3/6): H11-K3-4; shows men at work and a dog |
1 |
3 |
34 |
Kentucky River |
Lock 3 |
|
"1901"; shot of women and man on completed site overlooking river, shows maintenance raft in background (KY.R. :-3/19); H11-K3-14 |
1 |
3 |
34 |
Kentucky River |
Lock 3 |
|
"1901"; scenic of shot of dam with water running over it (KY.R. L-3/15); H11-K3-13 |
1 |
3 |
35 |
Kentucky River |
Lock 3 |
|
"1901"; shot of site during construction, with mechanical raft and men at work (KY.R. L-3/14); H11-K3-12 |
1 |
3 |
35 |
Kentucky River |
Lock 3 |
|
"1901"; shot of men at work on almost completed site with house on hill in background (KY.R. L-3/11.4); H11-K3-10 |
1 |
3 |
36 |
Kentucky River |
Lock 3 |
|
"1901"; shot of men at work on lock (KY.R. L-3/12); H11-K3-11 |
1 |
3 |
37 |
Kentucky River |
Lock |
|
large scenic shot of almost completed site from bank (KY.R. L-3/1); H11-K3-1 |
1 |
3 |
38 |
Kentucky River |
Lock |
|
large scenic shot of completed site (KY.R. L-2/3); H11-K3-2 |
1 |
3 |
39 |
Kentucky River |
Lock and Dam No. 3 |
|
"View west, from right bank below dam showing lock, lock-keepers house, etc." (KY.R. L-3/4); H11-K3-3 |
1A |
4 |
1 |
Kentucky River |
Lock No. 4 |
3/2/1923 |
Scenic shot of site during construction, includes some machinery and a house (KY.R. L-4/13.1); H11-K4-20 |
1A |
4 |
2 |
Kentucky River |
Lock No. 4 |
|
Shot of men at work on construction site (KY.R. L-4/12); H11-K4-23 |
1A |
4 |
3 |
Kentucky River |
Dam No. 4 |
9/7/1885 |
"Repairing Dam, condition of work Sept 7, 1885, Photo by M.W. Venable" (KY.R. L-4/6); H11-K4-24; large shot of men at work on dam, with large mill or plant in background |
1A |
4 |
4 |
Kentucky River |
Dam No. 4 |
9/7/1885 |
"Repairing Dam, condition of work Sept 7, 1885, Photo by M.W. Venable" (KY.R. L-4/9); H11-K4-22; small shot of construction site and bank from one side, shows men at work |
1A |
4 |
4 |
Kentucky River |
Dam No. 4 |
9/7/1885 |
"Repairing dam and mill flume, Sept 7, 1885, Photo by M.W. Venable" (KY.R. L-4/10); H11-K4-21; shot of men at work on construction site |
1A |
4 |
5 |
Kentucky River |
Lock No. 4 |
3/3/1923 |
"Marine Ways, Note: Side Haul, Grade 20%, 5 Cradles, Capacity 300 Tons" (KY.R. L-4/4); H11-K4-4; shot of men in front of lock with gates slightly open |
1A |
4 |
6 |
Kentucky River |
Dam No. 4 |
9/7/1885 |
"Repairing Dam, condition of work Sept 7, 1885, Photo by M.W. Venable" (KY.R. L-4/5); H11-K4-5; shot of men surveying construction site |
1A |
4 |
6 |
Kentucky River |
Ashur Boom |
3/23/1895 |
"Ashur Boom, Big Eddy, Kentucky River" (KY.R. P-4/2); H11-K4-1; scenic shot of river and site with some men on site |
1A |
4 |
7 |
Kentucky River |
Lock |
|
Nice large shot of construction site including lock and dam, men at work, a raft, and a factory in background (KY.R. L-4/2); H11-K4-2 |
1A |
4 |
8 |
Kentucky River |
Lock and Dam No. 4 |
8/8/1883 |
"View East from river wall of lock showing dam and hemp factory" (KY.R. L-4/2); H11-K4-2; nice large shot of construction site including lock and dam, men at work, a raft and a large factory in background |
1A |
4 |
9 |
Kentucky River |
Lock and Dam No. 4 |
|
August 1883 (date cute off); "View S.W. from hill-top below the hemp factory, shows west end of dam, lock, etc., with Frankfort and L&N [Louisville/Nashv] R.R. bridge in distance" (KY.R. L-4/3); H11-K4-3; nice scenic shot including houses, river and site |
1A |
4 |
10 |
Kentucky River |
Lock No. 4 |
|
round photo of lock, shows some men standing on site (KY.R. L-4/11); H11-K4-10 |
1A |
4 |
11 |
Kentucky River |
Lock |
|
shot of construction site from bank, includes men at work, and houses in background (KY.R. L-4/13.2); H11-K4-13 |
1A |
4 |
11 |
Kentucky River |
Lock |
|
shot of construction site from water, includes site and house; H11-K4-12 |
1A |
4 |
12 |
Kentucky River |
Lock |
|
shot of construction site with men at work and house in background (KY.R. L-4/13); H11-K4-11 |
1A |
4 |
12 |
Kentucky River |
Dam No. 4 |
8/8/1883 |
"View south from river wall of lock, showing repairs to dam" (KY.R. L-4/9); H11-K4-6; shows men at work and a raft |
1A |
4 |
13 |
Kentucky River |
Dam No. 4 |
8/8/1883 |
"View west from right bank just below hemp" (KY.R. L-4/8); H11-K4-7; shows men at work |
1A |
4 |
14 |
Kentucky River |
Lock and Dam |
|
scenic shot showing lock doors closed, with houses in view (KY.R. L-4/3); H11-K3-8 |
1A |
4 |
15 |
Kentucky River |
Lock and Dam 4 |
9/12/1956 |
"View looking at face of deteriorated and leaning downstream guard wall; File No. 29483"; H11-K4-14; close up shot of wall |
1A |
4 |
15 |
Kentucky River |
Lock and Dam |
|
scenic shot showing lock during construction, includes river and houses (KY.R. L 4/8); H11-K4-9 |
1A |
4 |
16 |
Kentucky River |
Lock and Dam 4 |
9/12/1956 |
"Downstream guard wall showing deteriorated condition of wall which is settling and leaning; File 29483"; H11-K4-14 |
1A |
4 |
16 |
Kentucky River |
Lock and Dam 4 |
9/12/1956 |
"View looking at face of deteriorated leaning downstream guard walll; File No. 29483"; H11-K4-14 |
1A |
4 |
17 |
Kentucky River |
Lock and Dam No. 4 |
9/12/1956 |
"View looking upstream, showing leaning upper guide wall; File No. 29498"; H11-K4-16 |
1A |
4 |
17 |
Kentucky River |
Lock and Dam No. 4 |
9/12/1956 |
"View showing deteriorated condition of upper guard wall; File No. 29482"; H11-K4-15 |
1A |
4 |
18 |
Kentucky River |
Lock and Dam No. 4 |
9/12/1956 |
"View looking upstream, showing decayed timbers and deteriorated condition of gate; File No. 29485"; H11-K4-17 |
1A |
4 |
18 |
Kentucky River |
Lock and Dam No. 4 |
|
close up shot of lock with gates closed; H11-K4-18 |
1A |
4 |
18 |
Kentucky River |
Lock and Dam No. 4 |
|
close up shot of lock with gates closed |
1A |
4 |
18 |
Kentucky River |
Lock and Dam No. 4 |
|
close up shot of lock with gates closed |
1A |
4 |
18 |
Kentucky River |
Lock and Dam No. 4 |
|
close up shot of a piece of the lock that is failing; H11-K4-19 |
1A |
4 |
18 |
Kentucky River |
Lock and Dam No. 4 |
|
close up shot of a piece of the lock that is failing |
1A |
4 |
18 |
Kentucky River |
Lock and Dam No. 4 |
|
close up shot of a piece of the lock that is failing |
1A |
4 |
18 |
Kentucky River |
Lock and Dam No. 4 |
|
close up shot of a piece of the lock that is failing |
1A |
5 |
19 |
Kentucky River |
Lock and Dam No. 5 |
10/6/1885 |
large shot of men at work on construction site with houses and a boat in the background (L-5/12); H11-K5-8 |
1A |
5 |
20 |
Kentucky River |
Lock No. 5 |
9/10/1885 |
on back: "View of Lock No. 5 showing upper Gate and Dam"; large shot of construction site taken from one side (L-5/8); H11-K5-35; on back |
1A |
5 |
21 |
Kentucky River |
Lock and Dam No. 5 |
10/4/1885 |
large shot of construction site taken from one side (L-5/15); H11-K5-9 |
1A |
5 |
22 |
Kentucky River |
Lock No. 5 |
|
"1"=800"; aerial photo of lock and dam and surrounding area; H11-K5-16 |
1A |
5 |
22 |
Kentucky River |
Lock No. 5 |
|
aerial photo of lock and dam and surrounding area; H11-K5-15 |
1A |
5 |
23 |
Kentucky River |
Dam No. 5 |
12/17/1885 |
large scenic shot including a bridge and some houses (L-5/21); H11-K5-17 |
1A |
5 |
24 |
Kentucky River |
Lock and Dam No. 5 |
12/15/1885 |
"View from lower end of abutment" (L-5/20); H11-K5-30; large scenic shot from one side |
1A |
5 |
25 |
Kentucky River |
Lock No. 5 |
|
View of lock from one side, includes some houses in background (L-5/19); H11-K5-31 |
1A |
5 |
26 |
Kentucky River |
Lock No. 5 |
11/2/1885 |
on back: "View of Lock No. 5" (L-5/17); H11-K5-32; large close up shot of lock with some houses and men in background |
1A |
5 |
27 |
Kentucky River |
Lock and Dam No. 5 |
10/6/1885 |
on back: "View from abutment"; view of construction site from one side of river, includes men at work and some houses in background (L-5/16); H11-K5-33 |
1A |
5 |
28 |
Kentucky River |
Dam No. 5 |
9/1/1885 |
on back: "View of Dam at No. 5" (L-5/5); H11-K5-36; shot of construction site with men at work |
1A |
5 |
29 |
Kentucky River |
Lock and Gate No. 5 |
9/1/1885 |
on back: "View of Lock and Gate at No. 5" (L-5/6); H11-K5-4; shot of construction site with men at work and people on the bank in background |
1A |
5 |
30 |
Kentucky River |
Dam and Low Gates |
10/1/1885 |
on back: "View of Dam…and Low gates" (L-5/9); H11-K5-34; large shot of construction site from bank; shows two buildings near or on river |
1A |
5 |
31 |
Kentucky River |
Lock No. 5 |
6/15/1885 |
on back: "View of Lock No. 5 as seen" (L-5/1); H11-K5-37; large shot of construction site |
1A |
5 |
32 |
Kentucky River |
Lock No. 5 |
6/15/1885 |
on back: "View of Lock No. 5 as seen" (L-5/2); H11-K5-1; large shot of construction site, includes a house on the hill, and two steamships on river |
1A |
5 |
33 |
Kentucky River |
Lock and Dam No. 5 |
7/3/1885 |
"Instantaneous View; Contractor's dredge as work; Snagboat "Kwasind" in motion; Photo by M.W. Venable" (L-5/3); H11-K5-2; shows men on bank, man in canoe, and two steamships (one called "Monongahela No. 2") |
1A |
5 |
34 |
Kentucky River |
Lock and Dam No. 5 |
8/12/1885 |
"Looking down stream" (L-5/4); H11-K5-3; large shot of construction site, includes multiple steam ships and houses, and men at work |
1A |
5 |
35 |
Kentucky River |
Lock and Dam No. 5 |
9/14/1885 |
"View from right bank" (L-5/7); H11-K5-5; large shot of construction site, included ship and houses in background, and men at work |
1A |
5 |
36 |
Kentucky River |
Dam No. 5 |
10/24/1885 |
on back: "View of Dam No. 5" (L-5/10); H11-K5-6; large shot of construction site which shows the steamship "Grace Morris" and men at work |
1A |
5 |
37 |
Kentucky River |
Dam No. 5 |
11/2/1885 |
on back: "View of Dam No. 5" (L-5/18); H11-K5-11; large shot of construction site which shows the steamship "Dora No. 2" and men at work |
1A |
5 |
38 |
Kentucky River |
Lock No. 5 |
10/1/1885 |
on back: "View of Lower gates Lock No. 5" (L-5/11); H11-K5-7; large shot of two men between open gates of lock |
1A |
5 |
39 |
Kentucky River |
Lock 5 |
|
"May 1899; Upper part of lower land crib (built by State of Ky) to be replaced by new crib; new crib finished in July 1899"; H11-K5-23; small shot of bank from river, shows house on hill |
1A |
5 |
39 |
Kentucky River |
Lock 5 |
|
"Map 1899; Lower part of lower land crib (built by State of Ky) to be replaced by new crib; new crib finished in July 1899"; H11-K5-24; small shot of bank from river |
1A |
5 |
40 |
Kentucky River |
Lock No. 5 |
7/19/1951 |
"Installing tee piling anchorage for sheet steel piling diaphragm; File No. 25677"; H11-K5-14; shows men at work |
1A |
5 |
41 |
Kentucky River |
Lock No. 5 |
10/24/1932 |
on back: "Lower Mitre Wall. Prior to concreting" (L-5/24); H11-K5-18; 36/[5-D]; shows men at work |
1A |
5 |
41 |
Kentucky River |
Lock No. 5 |
4/17/1952 |
"Spare gate for lock No. 5, showing damaged lower land leaf; File No. 26720"; H11-K5-29; shows structure and house in background |
1A |
5 |
42 |
Kentucky River |
Lock No. 5 |
4/17/1952 |
"Spare gate for lock No. 5, showing damaged lower land leaf; File No. 26722"; H11-K5-28; shows structure and house in background |
1A |
5 |
42 |
Kentucky River |
Lock No. 5 |
4/17/1952 |
"Spare gate for lock No. 5, showing damaged lower land leaf; File No. 26718"; H11-K5-27; shows car and truck in background |
1A |
5 |
42 |
Kentucky River |
Lock No. 5 |
4/17/1952 |
"Spare gate for lock No. 5, showing damaged lower land leaf; File No. 26721"; H11-K5-26 |
1A |
5 |
42 |
Kentucky River |
Lock No. 5 |
4/17/1952 |
"Spare gate for lock No. 5, showing damaged lower land leaf; File No. 26719"; H11-K5-25 |
1A |
5 |
42 |
Kentucky River |
Lock No. 5 |
|
"Oct 1932" shot of lock and pit, worker in background; H11-K5-22; 36/[5-D] |
1A |
5 |
42 |
Kentucky River |
Lock No. 5 |
10/24/1932 |
"Lock Pit - Lower Coffer Dam" (L 5/26); H11-K5-20; 36/[5-D]; shows machinery and men at work |
1A |
5 |
42 |
Kentucky River |
Lock No. 5 |
10/24/1932 |
"Upper Gate and Head Bay Dam" (L 5/25); H11-K5-19; 36/[5-D]; shows machinery and steam with some blurry men in leftside of background |
1A |
5 |
42 |
Kentucky River |
Lock No. 5 |
|
"Oct 1932" men working on lock (L 5/29); H11-K5-21; 36/[5-D] |
1A |
6 |
43 |
Kentucky River |
Lock and Dam |
9/26/1891 |
"Salvisa, KY"; Shot of construction site from water, shows men at work and a building on the hill (L-6/33); H11-K6-51 |
1A |
6 |
43 |
Kentucky River |
Lock and Dam |
|
Shot of construction site from bank, shows men at work and a raft (L-6/37); H11-K6-52 |
1A |
6 |
43 |
Kentucky River |
Lock and Dam |
8/14/1891 |
"Salvisa, KY; "Abutment 'Pool Water'" (L-6/16); H11-K6-53; close up shot of wall and raft |
1A |
6 |
44 |
Kentucky River |
Lock and Abutment |
6/25/1891 |
"Salvisa, KY (on back); Abutment…" (L-6/6); H11-K6-54; shows men standing on abutment, and lists measurements for construction process |
1A |
6 |
45 |
Kentucky River |
Lock |
6/26/1891 |
"Salvisa, KY" (L-6/8); H11-K6-55; shot of men on bank with house or structure at top of hill |
1A |
6 |
46 |
Kentucky River |
Lock |
|
Lock, showing culvert and men at work (L-6/14); H11-K6-56 |
1A |
6 |
47 |
Kentucky River |
Lock |
8/14/1891 |
"Salaisa, KY"; Lock, "Cross Culvert, 'Head Wall'" (L-6/13); H11-K6-57; shows men on construction site |
1A |
6 |
48 |
Kentucky River |
Lock No. 6 |
8/14/1891 |
"General View Lock No. 6" (L-6/18); H11-K6-58; shows site from one side, during construction phase |
1A |
6 |
49 |
Kentucky River |
Lock |
10/16/1891 |
"Salvisa, KY"; General view of lock from one side, shows men at work and rafts (L-6/37); H11-K6-59 |
2 |
6 |
1 |
Kentucky River |
Lock |
9/26/1891 |
"Salvisa, KY"; General view of work area around lock, shows men at work (L-6/34); H11-K6-60 |
2 |
6 |
1 |
Kentucky River |
Lock |
8/14/1891 |
"Salvisa, KY"; General view of work area around lock, shows men at work (L-6/15); H11-K6-61 |
2 |
6 |
2 |
Kentucky River |
Coffer Dam |
6/26/1891 |
"Salvisa, KY (on back); Coffer Dam after rise in the river June 23" (L-6/7); H11-K6-77; shows men standing in front of river on site |
2 |
6 |
3 |
Kentucky River |
Lock |
|
"Excavation for Abutment" (L-6/4); H11-K6-78; shows site during digging excavation, and men at work in background |
2 |
6 |
4 |
Kentucky River |
Lock and Dam |
12/4/1891 |
"Frankfort, KY" (L-6/44); H11-K6-65; shot of completed project from one side, shows man standing on wall |
2 |
6 |
4 |
Kentucky River |
Lock and Dam |
|
shot of completed project from one side, shows man standing on wall (L-6/50); H11-K6-79 |
2 |
6 |
4 |
Kentucky River |
Lock and Dam |
|
shot of completed project from one side, shows man standing on wall (L-6/44); H11-K6-23 |
2 |
6 |
5 |
Kentucky River |
Lock and Dam |
9/14/1891 |
"Salvisa, KY" (L-6/36); H11-K6-80; shot of construction process inclding men, machinery and some rafts/boats |
2 |
6 |
6 |
Kentucky River |
Dam |
10/16/1891 |
"Salvisa, KY" (L-6/38); H11-K6-81; shot of construction site from water, shows men at work and a raft |
2 |
6 |
7 |
Kentucky River |
Lock No. 6 |
7/25/1891 |
"Foundation [of] Lock no. 6, Looking up river" (L-6/10.2); H11-K6-43; shows a lot of workers |
2 |
6 |
8 |
Kentucky River |
Lock |
10/30/1891 |
Lock gates, with a man on the left (L-6/39); H11-K6-44 |
2 |
6 |
8 |
Kentucky River |
Lock |
|
Lock gates, with a man on the left (L-6/39); H11-K6-18 |
2 |
6 |
9 |
Kentucky River |
Lock |
9/26/1891 |
"Salvisa, KY" (L-6/35); H11-K6-45; shows men at work with cart and rails |
2 |
6 |
10 |
Kentucky River |
Lock |
8/29/1891 |
"Salvisa, KY; Breast & Outside Wall" (L-6/24); H11-K6-46; shows men on construction site |
2 |
6 |
11 |
Kentucky River |
Dam |
9/14/1891 |
"Salvisa, KY; Dam, Crib, Lower Step" (L-6/28); H11-K6-47; shows site with men on raft, boat, houses and machinery in background |
2 |
6 |
12 |
Kentucky River |
Dam |
12/4/1891 |
"Frankfort, KY" (L-6/43); H11-K6-48; Dam, looking up stream |
2 |
6 |
13 |
Kentucky River |
Dam |
|
General view of dam during construction process, shows men at work (L-6/32); H11-K6-49 |
2 |
6 |
13 |
Kentucky River |
Dam |
10/30/1891 |
"Salvisa, KY" (L-6/40); H11-K6-50; General view of dam during construction process, shows men at work |
2 |
6 |
14 |
Kentucky River |
Lock No. 6 |
5/7/1894 |
"Upper lock house" (L-6/51); H11-K6-42; shows men in front of lock house |
2 |
6 |
15 |
Kentucky River |
Lock |
|
Shot of completed lock taken inside from water, shows people standing on walls (L-6/48); H11-K6-41 |
2 |
6 |
16 |
Kentucky River |
Lock |
|
Shot of completed lock, taken looking downstream, shows people standing on walls (L-6/47); H11-K6-39 |
2 |
6 |
16 |
Kentucky River |
Lock |
|
Shot of completed lock, taken looking downstream, shows people standing on walls (L-6/47); H11-K6-25 |
2 |
6 |
17 |
Kentucky River |
Lock |
|
Shot of men on walls of completed lock (L-6/46); H11-K6-40 |
2 |
6 |
18 |
Kentucky River |
Dam and Lock |
12/4/1891 |
"Frankfort, KY" (L-6/42); H11-K6-83; general view of dam and lock from one side, shows a house |
2 |
6 |
18 |
Kentucky River |
Dam |
12/4/1891 |
"Frankfort, KY" (L-6/41); H11-K6-84; shows dredging equipment looking up stream, with men at work |
2 |
6 |
18 |
Kentucky River |
Dam |
|
Shows dredging equipment looking up stream, with men at work (L-6/41); H11-K6-20 |
2 |
6 |
19 |
Kentucky River |
Lock No. 6 |
7/25/1891 |
"Foundations Lock No. 6 Looking down river; Salvisa, KY" (L-6/10); H11-K6-85; shows construction site, men at work, and houses on hill |
2 |
6 |
20 |
Kentucky River |
Lock No. 6 |
7/25/1891 |
"Foundations Lock No. 6 Looking down river; Salvisa, KY" (L-6/10.1); H11-K6-86; shows construction site, men at work, and a raft |
2 |
6 |
20 |
Kentucky River |
Lock |
7/25/1891 |
"Salvisa, KY (on back)"; Shows site during early construction with men at work and a raft in background (L-6/10.4); H11-K673 |
2 |
6 |
21 |
Kentucky River |
Lock No. 6 |
7/25/1891 |
"Foundation Lock No. 6 Lower end of outside wall; Salvisa, KY" (L-6/10.3); H11-K6-88; shows men at work |
2 |
6 |
22 |
Kentucky River |
Lock |
8/14/1891 |
"Outside Wall - Looking down River; Salvisa, KY" (L-6/11); H11-K6-89; shows men at work |
2 |
6 |
23 |
Kentucky River |
Lock |
9/26/1891 |
"Salvisa, KY"; general photo showing workers near abutment, with some rafts (L-6/29); H11-K6-90 |
2 |
6 |
24 |
Kentucky River |
Dam |
|
General view of construction side from bank, including a raft or structure (L-6/53); H11-K6-91 |
2 |
6 |
25 |
Kentucky River |
Lock |
9/26/1891 |
View of dam, with a couple workers, a donkey, and a raft in background (L-6/30); H11-K6-82 |
2 |
6 |
26 |
Kentucky River |
Lock |
|
Shows granite used for locks (L-6/5); H11-K6-67 |
2 |
6 |
26 |
Kentucky River |
Lock |
|
Shows granite used for locks (L-6/5); H11-K6-3 |
2 |
6 |
27 |
Kentucky River |
Dam |
|
General photos of dam and rockfill, shows men on site and houses (L-6/49); H11-K6-68 |
2 |
6 |
28 |
Kentucky River |
Lock |
8/29/1891 |
"Salvisa, KY" (L-6/19); H11-K6-69; Outside wall of lock, shows men at work |
2 |
6 |
29 |
Kentucky River |
Lock |
8/29/1891 |
"Salvisa, KY" (L-6/22); H11-K6-70; General photo of work on lock, showing men on site, cart and rails, and boats in background |
2 |
6 |
30 |
Kentucky River |
Lock |
10/4/1891 |
"Salvisa, KY" (L-6/45); H11-K6-71; Shows lock, looking down stream, with men on wall and houses in background |
2 |
6 |
30 |
Kentucky River |
Lock |
|
Shows lock, looking down stream, with men on wall and houses in background (L-6/45); H11-K6-24 |
2 |
6 |
31 |
Kentucky River |
Lock |
6/16/1891 |
"Salvisa, KY" (L-6/2); H11-K6-72; shows granite used for lock, with men, a horse, and a house in background |
2 |
6 |
31 |
Kentucky River |
Lock |
|
Shows granite used for lock, with men, a horse, and a house in background (L-6/2); H11-K6-1 |
2 |
6 |
32 |
Kentucky River |
Lock |
9/26/1891 |
"Salvisa, KY" (L-6/31); H11-K6-74; outside wall of lock |
2 |
6 |
33 |
Kentucky River |
Lock |
9/14/1891 |
"Salvisa, KY" (L-6/26); H11-K6-75; shows outside wall of lock with men standing on site and women lounging in front on ground |
2 |
6 |
33 |
Kentucky River |
Lock |
9/14/1891 |
"Land Wall, Looking down river; Salvisa, KY" (L-6/27); H11-K6-76; shows men and women on site, and cart and rails |
2 |
6 |
34 |
Kentucky River |
Lock No. 6 |
4/6/1921 |
"Looking down-stream from above abutment" (L-6/57); H11-K6-35; shows site across river, with houses and a steamship in background |
2 |
6 |
35 |
Kentucky River |
Lock No. 6 |
|
Aerial view of lock and surrounding area (L-6/59); H11-K6-36 |
2 |
6 |
36 |
Kentucky River |
Lock |
|
View up river of lock, shows houses in background (L-6/52); H11-K6-66 |
2 |
6 |
37 |
Kentucky River |
Lock |
|
General view of lock area (L-6/4); H11-K6-2; shows men across river and a shack in background |
2 |
6 |
38 |
Kentucky River |
Lock |
7/2/1891 |
"Frankfort, KY" (L-6/9); H11-K6-87; general view down stream along bank, shows men at work, houses, a shack, and a steamboat in background |
2 |
6 |
38 |
Kentucky River |
Lock |
7/2/1891 |
"Frankfort, KY" (L-6/9); H11-K6-5; general view down stream along bank, shows men at work, houses, a shack, and a steamboat in background |
3 |
6 |
1 |
Kentucky River |
Lock and Dam |
|
Lock and dam construction showing abutment (L-6/32); H11-K6-15; shows construction site from one side, with men at work and some rafts |
3 |
6 |
2 |
Kentucky River |
Dam |
|
General view of dam from river, shows men at work (L-6/38); H11-K6-17 |
3 |
6 |
3 |
Kentucky River |
Dam |
10/30/1891 |
General shot of dam under construction taken from one side, shows men at work and a raft (L-6/40); H11-K6-19 |
3 |
6 |
4 |
Kentucky River |
Dam |
|
View of dam looking upstream (L-6/43); H11-K6-21 |
3 |
6 |
4 |
Kentucky River |
Dam |
|
View of dam looking upstream (L-6/43); H11-K6-21 |
3 |
6 |
5 |
Kentucky River |
Lock No. 6 |
|
View of completed lock and dam looking upstream, with men on wall and houses in background (L-6/54); H11-K6-26 |
3 |
6 |
6 |
Kentucky River |
Lock No. 6 |
|
View of completed lock and dam, with men on wall and houses in background (L-6/55); H11-K6-37 |
3 |
6 |
7 |
Kentucky River |
Lock No. 6 |
|
"Steamer General O.M. Poe" (L-6/56); H11-K6-38; large close up shot of steamship |
3 |
6 |
8 |
Kentucky River |
Coffer Dam |
5/15/1891 |
"Coffer Dam; Construction Commenced May 15th - Completed June 15th, 1891" (L-6/3); H11-K6-62; shows site during construction with men at work, and houses and ships in background |
3 |
6 |
9 |
Kentucky River |
Lock No. 6 |
8/29/1891 |
"General View; Salvisa, KY" (L-6/23); H11-K6-11; general view of construction area, shows men at work, and cart and rail system |
3 |
6 |
9 |
Kentucky River |
Lock No. 6 |
8/29/1891 |
"Salvisa, KY" (L-6/23); H11-K6-63; general view of construction area, shows men at work, and cart and rail system |
3 |
6 |
10 |
Kentucky River |
Lock |
8/29/1891 |
"Salvisa, KY" (L-6/21); H11-K6-64; general view of work on lock, shows men at work, and cart and rail system |
3 |
6 |
11 |
Kentucky River |
Lock |
6/26/1891 |
"Salvisa, KY" (L-6/6); H11-K6-4; view of abutment with workers standing on wall |
3 |
6 |
12 |
Kentucky River |
Lock |
7/25/1891 |
"Salvisa, KY" (L-6/10.3); H11-K6-6; view of abutment during construction, shows men at work |
3 |
6 |
13 |
Kentucky River |
Lock |
8/14/1891 |
"Emptying Culvert 'Outside Wall'; Salvisa, KY" (L-6/12); H11-K6-7; shows men at work on wall |
3 |
6 |
14 |
Kentucky River |
Lock |
8/14/1891 |
"Salvisa, KY" (L-6/17); H11-K6-8; shows granite used for lock and abutment, with two couples sitting on granite, and workers, ship, and shack in background |
3 |
6 |
15 |
Kentucky River |
Lock |
8/26/1891 |
"Salvisa, KY" (L-6/20); H11-K6-9; shows workers on wall of lock |
3 |
6 |
16 |
Kentucky River |
Lock No. 6 |
8/29/1891 |
"Land Wall - Looking up stream; Salvisa, KY" (L-6/21); H11-K6-10; shows men on construction site, and cart and rail system |
3 |
6 |
17 |
Kentucky River |
Lock |
9/14/1891 |
"Salvisa, KY" (L-6/25); H11-K6-12; shows men and women on construction side, with cart and rail system visible |
3 |
6 |
18 |
Kentucky River |
Lock |
9/14/1891 |
"Salvisa, KY" (L-6/28); H11-K613; view from abutment across to lock showing dredging machinery, men at work, a ship and raft, and houses in background |
3 |
6 |
19 |
Kentucky River |
Dam |
9/26/1892 |
"Salvisa, KY" (L-6/33); H11-K6-16; general view of dam showing abutment, with men at work and shack in background |
3 |
6 |
20 |
Kentucky River |
Lock |
9/14/1891 |
"Salvisa, KY" (L-6/29); H11-K6-14; view of outside wall with men standing on it |
3 |
7 |
21 |
Kentucky River |
Lock No. 7 |
11/1/1897 |
"Dam looking down-stream" (No. 79, on back); H11-K7-73; large shot of site, showing construction of lock, dam, and abutment, and men at work with barge in background |
3 |
7 |
22 |
Kentucky River |
Lock No. 7 |
11/1/1897 |
"Dam looking South from Slope Fill" (L-7/86); No. 78 (on back); H11-K7-72; shows men at work and barge in background |
3 |
7 |
22 |
Kentucky River |
Lock No. 7 |
11/1/1897 |
"Dam looking South from Slope Fill"; No. 78 (on back); H11-K7-72; shows men at work and barge in background |
3 |
7 |
23 |
Kentucky River |
Lock No. 7 |
8/1/1896 |
"Coffer Dam Looking South"; No. 29 (on back); H11-K7-117; shows men at work, machinery and barge in background |
3 |
7 |
24 |
Kentucky River |
Lock No. 7 |
10/8/1896 |
"Lock-Pit showing Upper Breast Wall" (L-7/80); No. 60 (on back); H11-K7-59; shows construction site including cart and rail system |
3 |
7 |
24 |
Kentucky River |
Lock No. 7 |
10/8/1896 |
"Lock-Pit showing Upper Breast Wall" (L-7/81); No. 60 (on back); H11-K7-59; shows construction site including cart and rail system |
3 |
7 |
24 |
Kentucky River |
Lock No. 7 |
10/8/1896 |
"Upper Mitre Sill and Abutment"; No. 60 (on back); H11-K7-59; shows construction site including cart and rail system |
3 |
7 |
25 |
Kentucky River |
Lock No. 7 |
6/26/1897 |
"Land Wall looking down stream"; No. 61 (on back); H11-K7-60; shows workers on wall |
3 |
7 |
26 |
Kentucky River |
Lock No. 7 |
6/26/1897 |
"General view of Lock Walls, looking down stream"; No. 62 (on back); H11-K7-61; shows construction site from bank, with men at work, cart and rail system shown, and houses in background |
3 |
7 |
27 |
Kentucky River |
Lock No. 7 |
6/26/1897 |
"General view of Lock Walls, looking down stream" (L-7/20); No. 62 (on back); H11-K7-61; shows construction site from bank, with men at work, cart and rail system shown, and houses in background |
3 |
7 |
28 |
Kentucky River |
Lock No. 7 |
7/10/1897 |
"River Wall looking down stream" (L-7/28); No. 63 (on back); H11-K7-62; shows construction site from on side, showing workers, and houses in background |
3 |
7 |
28 |
Kentucky River |
Lock No. 7 |
7/10/1897 |
"River Wall looking down stream"; No. 63 (on back); H11-K7-62; shows construction site from on side, showing workers, and houses in background |
3 |
7 |
29 |
Kentucky River |
Lock No. 7 |
7/10/1897 |
"River Wall looking up-stream" (L-7/27); No. 64 (on back); H11-K7-63; shows construction site from bank with men at work and barge in background |
3 |
7 |
29 |
Kentucky River |
Lock No. 7 |
7/10/1897 |
"River Wall looking up-stream"; No. 64 (on back); H11-K7-63; shows construction site from bank with men at work and barge in background |
3 |
7 |
30 |
Kentucky River |
Lock No. 7 |
8/13/1897 |
"Lock Walls, Looking down-stream" (L-7/48); No. 64 (on back); H11-K7-64; shows construction site from one side with men at work and houses in background |
3 |
7 |
30 |
Kentucky River |
Lock No. 7 |
8/13/1897 |
"Lock Walls, Looking down-stream"; No. 64 (on back); H11-K7-64; shows construction site from one side with men at work and houses in background |
3 |
7 |
31 |
Kentucky River |
Lock No. 7 |
10/2/1897 |
"Lower end of Lock Wall & Dam looking up-stream" (L-7/75); No. 75 (on back); H11-K7-97; shows construction site with men at work and barge in background |
4 |
7 |
1 |
Kentucky River |
Lock No. 7 |
9/21/1896 |
"Upper end of Land Wall" (L-7/67); No. 46 (on back); H11-K7-96; shows construction side from one side, with men at work and houses in background |
4 |
7 |
1 |
Kentucky River |
Lock No. 7 |
9/21/1896 |
"Upper End Land Wall"; No. 46 (on back); H11-K6-96; shows construction side from one side, with men at work and houses in background |
4 |
7 |
2 |
Kentucky River |
Lock No. 7 |
8/30/1897 |
"Lower Wing Wall" (L-7/50); No. 69 (on back); H11-K7-66; shows construction site from one side, with men at work |
4 |
7 |
2 |
Kentucky River |
Lock No. 7 |
8/30/1897 |
"Lower Wing Wall"; No. 69 (on back); H11-K7-66; shows construction site from one side, with men at work |
4 |
7 |
3 |
Kentucky River |
Lock No. 7 |
9/17/1897 |
"Lock pit looking down stream" (L-7/63); No. 71 (on back); H11-K7-67; shows construction site with men at work and houses in background |
4 |
7 |
3 |
Kentucky River |
Lock No. 7 |
9/17/1897 |
"Lock pit looking down stream"; No. 71 (on back); H11-K7-67; shows construction site with men at work and houses in background |
4 |
7 |
4 |
Kentucky River |
Lock No. 7 |
9/17/1897 |
"Lock pit looking up-stream" (L-7/64); No. 72 (on back); H11-K7-68; shot of pit from inside, shows men at work |
4 |
7 |
4 |
Kentucky River |
Lock No. 7 |
9/17/1897 |
"Lock pit looking up-stream"; No. 72 (on back); H11-K7-68; shot of pit from inside, shows men at work |
4 |
7 |
5 |
Kentucky River |
Lock No. 7 |
10/8/1896 |
"Lock put showing Upper Breast Wall" (L-7/82); No. 58 (on back); H11-K7-57; shot of lock during construction, shows man sitting |
4 |
7 |
5 |
Kentucky River |
Lock No. 7 |
10/8/1896 |
"Pit Showing Upper Breast Wall"; No. 58 (on back); H11-K7-57; shot of lock during construction, shows man sitting |
4 |
7 |
6 |
Kentucky River |
Lock No. 7 |
10/8/1896 |
"Lock pit, looking up-stream" (L-7/83); No. 59 (on back); H11-K7-58; shot of construction site with houses in background |
4 |
7 |
6 |
Kentucky River |
Lock No. 7 |
10/8/1896 |
"Pit Looking Down Stream"; No. 59 (on back); H11-K7-58; shot of construction site with houses in background |
4 |
7 |
7 |
Kentucky River |
Lock No. 7 |
8/13/1897 |
"Filling behind Land Wall" (L-7/49); No. 68 (on back); H11-K7-65; shot of dirt near construction site with men standing around |
4 |
7 |
7 |
Kentucky River |
Lock No. 7 |
8/13/1897 |
"Filling behind Land Wall"; No. 68 (on back); H11-K7-65; shot of dirt near construction site with men standing around |
4 |
7 |
8 |
Kentucky River |
Lock No. 7 |
9/21/1896 |
"Upper end of River Wall" (L-7/72); No. 43 (on back); H11-K7-42; shot of construction site showing machinery, men at work, and cart and rail system |
4 |
7 |
8 |
Kentucky River |
Lock No. 7 |
9/21/1896 |
"Lowe End Landwall"; No. 43 (on back); H11-K7-42; shot of construction site showing machinery, men at work, and cart and rail system |
4 |
7 |
9 |
Kentucky River |
Lock No. 7 |
9/10/1896 |
"Lower end of River Wall" (L-7/57); No. 44 (on back); H11-K7-43; shot of construction site showing men at work, cart and rail system, and houses in background |
4 |
7 |
9 |
Kentucky River |
Lock No. 7 |
9/10/1896 |
"Lower end of River Wall" (L-7/61); No. 44 (on back); H11-K7-43; shot of construction site showing men at work, cart and rail system, and houses in background |
4 |
7 |
9 |
Kentucky River |
Lock No. 7 |
9/10/1896 |
"Lower End River Wall"; No. 44 (on back); H11-K7-43; shot of construction site showing men at work, cart and rail system, and houses in background |
4 |
7 |
10 |
Kentucky River |
Lock No. 7 |
9/17/1897 |
"Emptying culvert, River Wall" (L-7/62); No. 73 (on back); H11-K7-69 |
4 |
7 |
10 |
Kentucky River |
Lock No. 7 |
9/17/1897 |
"Emptying culvert, River Wall"; No. 73 (on back); H11-K7-69 |
4 |
7 |
11 |
Kentucky River |
Lock No. 7 |
10/2/1897 |
"Upper tri-angular piers & Dam" (L-7/78); No. 74 (on back); H11-K7-70; shows lock and dam during construction from one side, including men at work, and a house in background |
4 |
7 |
11 |
Kentucky River |
Lock No. 7 |
10/2/1897 |
"Upper tri-angular piers & Dam"; No. 74 (on back); H11-K7-70; shows lock and dam during construction from one side, including men at work, and a house in background |
4 |
7 |
12 |
Kentucky River |
Lock No. 7 |
8/22/1896 |
"Foundation of Land and Lower Wing Walls" (L-7/43); No. 38 (on back); H11-K7-38; shows foundation during construction with workers on site |
4 |
7 |
12 |
Kentucky River |
Lock No. 7 |
8/22/1896 |
"Foundation of Land and Lower Wing Walls" (L-7/46); No. 38 (on back); H11-K7-38; shows foundation during construction with workers on site |
4 |
7 |
12 |
Kentucky River |
Lock No. 7 |
8/22/1896 |
"Foundation of Lower Wing And Land Walls"; No. 38 (on back); H11-K7-38; shows foundation during construction with workers on site |
4 |
7 |
13 |
Kentucky River |
Lock No. 7 |
9/1/1896 |
"River Wall looking up-stream" (L-7/57); H11-K7-39; shows site during construction, with workers on site |
4 |
7 |
14 |
Kentucky River |
Lock No. 7 |
9/1/1896 |
"Upper End of Land Wall"; No. 42 (on back); H11-K7-41; shows men on construction site with house in background |
4 |
7 |
15 |
Kentucky River |
Lock No. 7 |
9/20/1898 |
"Dump Scows"; No. 51 (on back); H11-K7-50; shows man in front of wooden foundation with US army dredge in background |
4 |
7 |
16 |
Kentucky River |
Lock No. 7 |
8/22/1896 |
"Lower end of river wall; showing foundation and footing course" (L-7/44); No. 37 (on back); H11-K7-37; shows men working on foundation |
4 |
7 |
16 |
Kentucky River |
Lock No. 7 |
8/22/1896 |
"Lower End of River Wall Showing Foundation and Footing Course"; No. 37 (on back); H11-K7-37; shows men working on foundation |
4 |
7 |
16 |
Kentucky River |
Lock No. 7 |
9/1/1896 |
"River Wall Looking Up Stream"; No. 40 (on back); H11-K7-37; shows site during construction, with workers on site |
4 |
7 |
17 |
Kentucky River |
Lock No. 7 |
9/1/1896 |
"Land Wall"; No. 41 (on back); H11-K7-40; shot of workers on construction site, with house in background |
4 |
7 |
18 |
Kentucky River |
Lock No. 7 |
8/11/1896 |
"Foundation Upper Mitre Sill"; No. 32 (on back); H11-K7-32; shows workers on construction site |
4 |
7 |
19 |
Kentucky River |
Lock No. 7 |
10/2/1897 |
"Lower end of Lock Wall & Dam, looking up-stream"; No. 75 (on back); H11-K7-71; shot of men on construction site with barge in background |
5 |
7 |
1 |
Kentucky River |
Lock No. 7 |
9/21/1896 |
"Lower end of River Wall" (L-7/68); No. 48 (on back); H11-K7-47; shot of workers on construction site |
5 |
7 |
1 |
Kentucky River |
Lock No. 7 |
9/21/1896 |
"Lower end of River Wall" (L-7/69); No. 48 (on back); H11-K7-47; shot of workers on construction site |
5 |
7 |
1 |
Kentucky River |
Lock No. 7 |
9/10/1896 |
"Lower End River Wall"; No. 48 (on back); H11-K7-47; shot of workers on construction site |
5 |
7 |
2 |
Kentucky River |
Lock No. 7 |
10/8/1896 |
"Face of River Wall" (L-7/81); No. 57 (on back); H11-K7-56; shot of site with workers on wall in background |
5 |
7 |
2 |
Kentucky River |
Lock No. 7 |
10/8/1896 |
"Face of River Wall"; No. 57 (on back); H11-K7-56; shot of site with workers on wall in background |
5 |
7 |
3 |
Kentucky River |
Lock No. 7 |
9/10/1896 |
"Lock pit looking up-stream" (L-7/59); No. 47 (on back); H11-K7-46; shot of construction site from one side, showing men at work, machinery, and rail and cart system |
5 |
7 |
3 |
Kentucky River |
Lock No. 7 |
9/10/1896 |
Shot of construction site from one side, showing men at work, machinery, and rail and cart system; No. 47 (on back); H11-K7-46 |
5 |
7 |
4 |
Kentucky River |
Lock No. 7 |
9/21/1896 |
"Upper end of River Wall" (L-7/71); No. 45 (on back); H11-K7-44; shot of construction site showing men at work, and cart and rail system |
5 |
7 |
4 |
Kentucky River |
Lock No. 7 |
9/21/1896 |
"Upper End River Wall"; No. 45 (on back); H11-K7-44; shot of construction site showing men at work, and cart and rail system |
5 |
7 |
5 |
Kentucky River |
Lock No. 7 |
9/21/1896 |
"Upper end of Land Wall" (L-7/70); No. 46 (on back); H11-K7-45; shot of construction site showing men at work, cart and rail system, and houses in background |
5 |
7 |
6 |
Kentucky River |
Lock No. 7 |
10/1/1896 |
"River Wall looking down stream" (L-7/74); No. 54 (on back); H11-K7-53; shot of construction site from one side, showing men at work and houses in background |
5 |
7 |
6 |
Kentucky River |
Lock No. 7 |
10/1/1896 |
"Upper End River Wall"; No. 54 (on back); H11-K7-53; shot of construction site from one side, showing men at work and houses in background |
5 |
7 |
7 |
Kentucky River |
Lock No. 7 |
9/10/1896 |
"Upper end of Land Wall" (L-7/60); No. 50 (on back); H11-K7-49; shot of construction site from one side, showing men at work, cart and rail system, and houses in background |
5 |
7 |
7 |
Kentucky River |
Lock No. 7 |
9/10/1896 |
"Upper End Land Wall"; No. 50 (on back); H11-K7-49; shot of construction site from one side, showing men at work, cart and rail system, and houses in background |
5 |
7 |
8 |
Kentucky River |
Lock No. 7 |
9/10/1896 |
"Upper end of River Wall" (L-7/58); No. 49 (on back); H11-K7-48; shot of workers on construction site, including cart and rail system in background |
5 |
7 |
8 |
Kentucky River |
Lock No. 7 |
9/10/1896 |
"Upper End River Wall"; No. 49 (on back); H11-K7-48; shot of workers on construction site, including cart and rail system in background |
5 |
7 |
9 |
Kentucky River |
Lock No. 7 |
10/1/1896 |
"Lock looking down stream" (L-7/73); No. 55 (on back); H11-K7-54; shot of construction site from one side, showing men at work, cart and rail system, and houses in background |
5 |
7 |
9 |
Kentucky River |
Lock No. 7 |
10/1/1896 |
Shot of construction site from one side, showing men at work, cart and rail system, and houses in background; No. 55 (on back); H11-K7-54 |
5 |
7 |
10 |
Kentucky River |
Lock No. 7 |
10/8/1896 |
"Face of River Wall" (L-7/79); No. 56 (on back); H11-K7-55; shot of construction site from one side, showing two men in background (left), and cart and rail system in background (right) |
5 |
7 |
10 |
Kentucky River |
Lock No. 7 |
10/8/1896 |
Shot of construction site from one side, showing two men in background (left), and cart and rail system in background (right); No. 56 (on back); H11-K7-55 |
5 |
7 |
11 |
Kentucky River |
Lock No. 7 |
9/20/1896 |
"Constructing Dump Scows. Mark Spence to the front" (L-7/65); No. 51 (on back); H11-K7-50; shot of man (Mark Spence) in front of wooden frame of dump scow, with US Army Dredge No. 1 in background |
5 |
7 |
12 |
Kentucky River |
Lock No. 7 |
9/20/1896 |
"Lower End Land Wall"; No. 52 (on back); H11-K7-51; shot of construction site from one side, with men at work, and cart and rail system in background |
5 |
7 |
13 |
Kentucky River |
Lock No. 7 |
9/20/1896 |
"Lock pit looking Up-stream" (L-7/66); No. 52 (on back); H11-K7-66; shot of construction site from one side, with men at work, and cart and rail system in background |
5 |
7 |
14 |
Kentucky River |
Lock No. 7 |
6/30/1896 |
"Cofferdam Looking North Four Derricks Being Raised At One Time"; No. 18 (on back); H11-K7-15; shot of workers on construction site, with barge barely visible on the left |
5 |
7 |
15 |
Kentucky River |
Lock |
|
Shot of construction site from a distance, showing men at work, cart and rail system, and houses (L-7/14); No. 34 (on back); H11-K7-34 |
5 |
7 |
16 |
Kentucky River |
Lock No. 7 |
8/11/1896 |
"Foundation Looking North"; No. 33 (on back); H11-K7-33; shot of construction site from one side, showing men at work, cart and rail system, and steamship in background |
5 |
7 |
17 |
Kentucky River |
Lock No. 7 |
8/11/1896 |
"Foundations of Lock Walls. Looking up-stream" (7/A); H11-K7-31; small shot of men on construction site, showing cart and rail system, and barge in background |
5 |
7 |
18 |
Kentucky River |
Lock No. 7 |
8/1/1896 |
"View of Coffer Looking North"; No. 30 (on back); H11-K7-30; shot of construction site from one side, showing men at work, cart and rail system, and houses in background |
5 |
7 |
19 |
Kentucky River |
Lock No. 7 |
6/22/1896 |
"Lower Stone Yard" (L-7/15); No. 16; H11-K7-14; shot of men around supplies, with houses in background |
5 |
7 |
19 |
Kentucky River |
Lock No. 7 |
6/22/1896 |
"Lower Stone Yard" (L-7/18); No. 16; H11-K7-14; shot of men around supplies, with houses in background |
5 |
7 |
19 |
Kentucky River |
Lock No. 7 |
6/22/1896 |
"Lower Stone Yard"; No. 16; H11-K7-14; shot of men around supplies, with houses in background |
5 |
7 |
20 |
Kentucky River |
Lock No. 7 |
8/22/1896 |
"Upper end of Foundation" (L-7/45); No. 36 (on back); H11-K7-36; shot of construction site from one side, showing men at work, cart and rail system, and steamship in background |
5 |
7 |
20 |
Kentucky River |
Lock No. 7 |
8/22/1896 |
"Upper End of Foundation"; No. 36 (on back); H11-K7-36; shot of construction site from one side, showing men at work, cart and rail system, and steamship in background |
5 |
7 |
21 |
Kentucky River |
Lock No. 7 |
8/22/1896 |
"Excavation for Upper Wing Wall" (L-7/47); No. 35 (on back); H11-K7-35; shot of workers in excavation site with house in background |
5 |
7 |
21 |
Kentucky River |
Lock No. 7 |
8/22/1896 |
"Excavation for Upper Wing Wall"; No. 35 (on back); H11-K7-35; shot of workers in excavation site with house in background |
5 |
7 |
22 |
Kentucky River |
Lock No. 7 |
10/1/1896 |
"River Wall looking up-stream" (L-7/73); No. 53 (on back); H11-K7-52; shot of workers on construction site wall |
5 |
7 |
22 |
Kentucky River |
Lock No. 7 |
10/1/1896 |
"Lower End River Wall"; No. 53 (on back); H11-K7-52; shot of workers on construction site wall |
6 |
7 |
1 |
Kentucky River |
Lock No. 7 |
5/23/1896 |
"Coffer-dam looking down-stream" (L-7/4); No. 3; H11-K7-3; shot of site from bank, showing men at work, barge, house, and steamship in background |
6 |
7 |
1 |
Kentucky River |
Lock No. 7 |
5/23/1896 |
"Site of Lock Looking North"; No. 3 (on back); H11-K7-3; shot of site from bank, showing men at work, and barge, house, and steamship in background |
6 |
7 |
2 |
Kentucky River |
Lock No. 7 |
5/23/1896 |
"General view of stone yard" (L-7/2); No. 4; H11-K7-4; shows men on site and houses in background |
6 |
7 |
2 |
Kentucky River |
Lock No. 7 |
5/23/1896 |
"Stoneyard Lower"; No.4 (on back); H11-K7-4; shows men on site and houses in background |
6 |
7 |
3 |
Kentucky River |
Lock No. 7 |
6/4/1896 |
"Stone Yard. Beattyville Backing Stone" (L-7/8); No. 6; H11-K7-6; shot of stone yard showing rails and men in background |
6 |
7 |
3 |
Kentucky River |
Lock No. 7 |
6/4/1896 |
"Stone Yard. Beattyville Backing Stone"; No. 6; H11-K7-6; shot of stone yard showing rails and men in background |
6 |
7 |
4 |
Kentucky River |
Lock No. 7 |
5/23/1896 |
"View of Abutment" (L-7/3); No. 2; H11-K7-2; shows men on machinery, barge, and shack in background |
6 |
7 |
4 |
Kentucky River |
Lock No. 7 |
5/23/1896 |
"Abutment And Head of Cofferdam"; No. 2 (on back); H11-K7-2; shows men on machinery, barge, and shack in background |
6 |
7 |
5 |
Kentucky River |
Lock No. 7 |
5/23/1896 |
"Coffer-dam looking up-stream" (L-7/1); No. 1; H11-K7-1; shot of people on coffer-dam, with barges and a house visible |
6 |
7 |
5 |
Kentucky River |
Lock No. 7 |
5/23/1896 |
"Coffer-dam looking up-stream"; No. 1; H11-K7-1; shot of people on coffer-dam, with barges and a house visible |
6 |
7 |
6 |
Kentucky River |
Lock No. 7 |
7/1/1896 |
"Coffer-dam looking South" (L-7/26); H11-K7-17; shows site during construction with men at work and barge in background |
6 |
7 |
6 |
Kentucky River |
Lock No. 7 |
7/1/1896 |
"Cofferdam Looking South"; No. 21 (on back); H11-K7-17; shows site during construction with men at work and barge in background |
6 |
7 |
7 |
Kentucky River |
Lock No. 7 |
8/1/1896 |
"Showing coffer-dam and abutment" (L-7/36); H11-K7-27; shows site from bank with barge in view |
6 |
7 |
7 |
Kentucky River |
Lock No. 7 |
8/1/1896 |
"Showing Coffer And Abutment"; No. 28 (on back); H11-K7-27; shows site from bank with barge in view |
6 |
7 |
8 |
Kentucky River |
Lock No. 7 |
8/1/1896 |
"Quarrying for Rip-rap" (L-7/34); H11-K7-26; shows men with wheelbarrows excavating |
6 |
7 |
8 |
Kentucky River |
Lock No. 7 |
8/1/1896 |
"Quarrying for Rip-rap"; No. 27 (on back); H11-K7-26; shows men with wheelbarrows excavating |
6 |
7 |
9 |
Kentucky River |
Lock No. 7 |
6/30/1896 |
"Abutment completed" (L-7/23); H11-K7-16; close up shot of abutment wall |
6 |
7 |
9 |
Kentucky River |
Lock No. 7 |
7/1/1896 |
"Abutment Completed"; No. 19 (on back); H11-K7-16; close up shot of abutment wall |
6 |
7 |
10 |
Kentucky River |
Lock No. 7 |
6/4/1896 |
"Dredging for foundation of Lock-walls"; No. 5; H11-K7-5; shows dredge and rafts on river with men on site |
6 |
7 |
11 |
Kentucky River |
Lock No. 7 |
6/30/1896 |
"Coffer-dam looking North. Four derricks being raised at one time"; H11-K7-7; shows working on site, with dredge, houses, and steamship in background |
6 |
7 |
12 |
Kentucky River |
Lock No. 7 |
6/22/1896 |
"Abutment nearly completed" (L-7/17); No. 15; H11-K7-13; shows workers standing on abutment wall |
6 |
7 |
13 |
Kentucky River |
Lock No. 7 |
7/28/1897 |
"Lock Walls looking down stream" (L-7/33); No. 66 (on back); H11-K7-94; shows construction site from one side with men standing on walls, and houses in background |
6 |
7 |
14 |
Kentucky River |
Lock No. 7 |
7/18/1896 |
"Coffer-dam looking North" (L-7/31); H11-K7-25; shot taken from river bank, showing dredge, ship, and houses in background |
6 |
7 |
15 |
Kentucky River |
Lock No. 7 |
7/1/1896 |
"Coffer-dam looking South"; H11-K7-28; shot of construction site from one side, showing men at work and dredge in background |
6 |
7 |
16 |
Kentucky River |
Lock No. 7 |
8/1/1896 |
"Coffer-dam looking South" (L-7/38); H11-K7-29; shot of construction site from one side, showing men at work and dredge in background |
6 |
7 |
17 |
Kentucky River |
Lock No. 7 |
6/26/1897 |
"Land Wall looking down stream" (L-7/19); No. 61 (on back); H11-K7-91; shot of men on land wall |
6 |
7 |
18 |
Kentucky River |
Lock No. 7 |
6/30/1896 |
"Coffer-dam looking North. Four derricks being raised at one time" (L-7/21); H11-K7-92; show of construction site with workers and machinery in view, can see ship in left corner, and steamship in background |
6 |
7 |
19 |
Kentucky River |
Lock No. 7 |
7/16/1896 |
"Coffer-dam looking North" (L-7/29); H11-K7-93; shot of site with men, houses, dredge, and steamship in background |
6 |
7 |
20 |
Kentucky River |
Lock No. 7 |
6/4/1896 |
"Coffer-dam from Abutment side" (L-7/6); No. 8; H11-K7-89; shot of site across river, showing houses on hill, man on bank, and steamship "General O.M. Poe" |
6 |
7 |
21 |
Kentucky River |
Lock No. 7 |
6/4/1896 |
"Excavation for Abutment foundation" (L-7/7); H11-K7-90; shot of workers in excavation hole |
6 |
7 |
22 |
Kentucky River |
Lock No. 7 |
6/4/1896 |
"Dredging for foundation of Lock-walls" (L-7/5); No. 5; H11-K7-88; shot of dredge and rafts with workers on site |
6 |
7 |
23 |
Kentucky River |
Lock |
|
Shot of supply wood on site, with barge, ship, and workers in view (L-7/77); No. 80 (on back); H11-K7-74 |
6 |
7 |
24 |
Kentucky River |
Lock No. 7 |
11/1/1897 |
"Dam looking down-stream" (L-7/87); H11-K7-73; shot of site with workers on raft and barge in view |
6 |
7 |
25 |
Kentucky River |
Lock No. 7 |
8/11/1896 |
"Foundation Looking South"; No. 31 (on back); H11-K7-116; shot of construction site with men at work and barge in background |
6 |
7 |
26 |
Kentucky River |
Lock No. 7 |
|
Shot of supply wood on site, with barge, ship, and workers in view; No. 80 (on back); H11-K7-99 |
6 |
7 |
27 |
Kentucky River |
Lock No. 7 |
8/11/1896 |
"General View Showing Method Of Delivering Stone To The Masons"; No. 34; H11-K7-115; view from a distance showing men on site, barge, and houses on hill |
6 |
7 |
28 |
Kentucky River |
Lock No. 7 |
7/1/1896 |
"North end of coffer-dam showing Pumps"; H11-K7-18; shows workers on site, houses in background, and steamship "General O.M. Poe" |
6 |
7 |
29 |
Kentucky River |
Lock No. 7 |
8/1/1896 |
"Coffer-dam looking North" (L-7/37); H11-K7-95; shows construction site from one side showing men at work and houses in background |
7 |
7 |
1 |
Kentucky River |
Lock No. 7 |
6/13/1896 |
"Lower end of coffer-dam showing steam pumps" (L-7/12); No. 9; H11-K7-8; shot of site from bank, showing men at work, US Army barge, and house in background |
7 |
7 |
2 |
Kentucky River |
Lock No. 7 |
6/13/1896 |
"Lower End of Coffer Dam Showing Pumps"; No. 9; H11-K7-8; shot of site from bank, showing men at work, US Army barge, and house in background |
7 |
7 |
3 |
Kentucky River |
Lock No. 7 |
6/13/1896 |
"Excavating in coffer-dam for Lock-walls"; No. 10; H11-K7-9; shot of excavation site from one site, showing men at work, and barge and houses in background |
7 |
7 |
4 |
Kentucky River |
Lock No. 7 |
6/13/1896 |
"Excavating in coffer-dam for Lock-walls" (L-7/11); No. 10; H11-K7-9; shot of excavation site from one site, showing men at work, and barge and houses in background |
7 |
7 |
5 |
Kentucky River |
Lock No. 7 |
7/1/1896 |
"Lower Stone Yard, looking South"; H11-K7-19; shot of men and horses at stone yard |
7 |
7 |
6 |
Kentucky River |
Lock No. 7 |
7/1/1896 |
"Lower Stone Yard, looking South" (L-7/25); H11-K7-20; shot of men and horses at stone yard |
7 |
7 |
6 |
Kentucky River |
Lock No. 7 |
7/1/1896 |
"Lower Stone Yard, Looking South"; No. 22 (on back); H11-K7-20; shot of men and horses at stone yard |
7 |
7 |
7 |
Kentucky River |
Lock No. 7 |
7/16/1896 |
"Cofferdam Looking North" (No. 25); H11-K7-21; shot of site with men, barge and steamship "O.M. Poe" in background |
7 |
7 |
8 |
Kentucky River |
Lock No. 7 |
7/1/1896 |
"North end of coffer-dam, showing Pumps" (L-7/24); H11-K7-22; shot of site with houses and steamship "O.M. Poe" in background |
7 |
7 |
9 |
Kentucky River |
Lock No. 7 |
8/11/1896 |
"View from Abutment side, showing incline" (L-7/42); H11-K7-115; shot from distance showing site, workers, houses, and barge |
7 |
7 |
10 |
Kentucky River |
Lock No. 7 |
8/11/1896 |
"Foundations of Lock Walls. Looking up-stream" (L-7/39); H11-K7-116; shot of workers on site, with barge visible in background |
7 |
7 |
11 |
Kentucky River |
Lock No. 7 |
8/1/1896 |
"Coffer-dam looking South" (L-7/35); H11-K7-117; shot of site showing workers and barge |
7 |
7 |
12 |
Kentucky River |
Lock No. 7 |
6/30/1896 |
"Coffer-dam looking North. Four derricks being raised at one time" (L-7/22); H11-K7-118; shot of site showing workers, US Army barge, and houses in background |
7 |
7 |
12 |
Kentucky River |
Lock No. 7 |
6/30/1896 |
"Coffer-dam looking North. Four derricks being raised at one time"; shot of site showing workers, US Army barge, and houses in background |
7 |
7 |
13 |
Kentucky River |
Lock No. 7 |
6/2/1896 |
"Dam From Abutment Side"; No. 8 (on back); H11-K7-119; shot of site from bank showing houses on hill, workers, and steamship "General O.M. Poe" |
7 |
7 |
14 |
Kentucky River |
Lock No. 7 |
6/22/1896 |
"Lock pit excavation. Looking North" (L-7/13); No. 14; H11-K7-105; shot of workers in excavation pit with barge and houses in background |
7 |
7 |
15 |
Kentucky River |
Lock No. 7 |
6/22/1896 |
"Lock pit excavation. Looking North" (L-7/16.1); No. 14; H11-K7-105; shot of workers in excavation pit with barge and houses in background |
7 |
7 |
16 |
Kentucky River |
Dam |
|
Faded shot of completed dam with house visible (L-7/91); H11-K7-107 |
7 |
7 |
17 |
Kentucky River |
Dam |
|
Faded shot of steamship "General O. M. Poe" with men visible (L-7/90); H11-K7-108 |
7 |
7 |
18 |
Kentucky River |
Lock No. 7 |
9/1/1896 |
"Lower end of Land Wall, showing emptying culvert" (L-7/54); H11-K7-110; shot of site from one side, showing men at work |
7 |
7 |
19 |
Kentucky River |
Lock No. 7 |
9/1/1896 |
"Land Wall" (L-7/53); H11-K7-111; shot of workers on site with house in background |
7 |
7 |
19 |
Kentucky River |
Lock No. 7 |
9/1/1896 |
"Land Wall" (L-7/55); shot of workers on site with house in background |
7 |
7 |
20 |
Kentucky River |
Lock No. 7 |
9/1/1896 |
"Upper end of Land Wall" (L-7/56); shot of workers on site with house in background |
7 |
7 |
20 |
Kentucky River |
Lock No. 7 |
9/1/1896 |
"Upper end of Land Wall" (L-7/52); H11-K7-112; shot of workers on site with house in background |
7 |
7 |
21 |
Kentucky River |
Lock No. 7 |
8/11/1896 |
"Upper end of lock walls. Showing excavation and part of foundation" (L-7/40); H11-K7-113; shows workers in excavation pit |
7 |
7 |
22 |
Kentucky River |
Lock No. 7 |
8/11/1896 |
"Foundation of Lock Walls. Looking down stream" (L-7/41); H11-K7-114; shot of workers on site with house, barge, and steamship in background |
7 |
7 |
23 |
Kentucky River |
Lock No. 7 |
7/1/1896 |
"North End of Cofferdam Showing Pumps"; H11-K7-22; shot of site with houses and steamship "General O.M. Poe" visible in background |
7 |
7 |
24 |
Kentucky River |
Lock No. 7 |
7/18/1896 |
"Coffer-dam looking South" (L-7/30); H11-K7-23; shot of men in small boat with barges visible |
7 |
7 |
24 |
Kentucky River |
Lock No. 7 |
7/18/1896 |
"Coffer-dam looking South"; No. 24 (on back); H11-K7-23; shot of men in small boat with barges visible |
7 |
7 |
25 |
Kentucky River |
Lock No. 7 |
7/16/1896 |
"Coffer-dam looking North"; H11-K7-24; shot of site with workers, barge, house, and steamship visible |
7 |
7 |
26 |
Kentucky River |
Lock No. 7 |
8/30/1897 |
"Lower Lock entrance" (L-7/51); No. 70 (on back); H11-K7-101; shot of workers in lock entrance |
7 |
7 |
26 |
Kentucky River |
Lock No. 7 |
8/30/1897 |
"Lower Lock entrance"; No. 70 (on back); shot of workers in lock entrance |
7 |
7 |
27 |
Kentucky River |
Lock No. 7 |
10/16/1897 |
"Dam looking South from Lock Walls" (L-7/85); H11-K7-102; shows workers on almost completed dam |
7 |
7 |
27 |
Kentucky River |
Lock No. 7 |
10/16/1897 |
"Dam looking South from Lock Walls"; shows workers on almost completed dam |
7 |
7 |
28 |
Kentucky River |
Lock No. 7 |
10/16/1897 |
"Dam Looking North from Abutment" (L-7/84); No. 76 (on back); H11-K7-103; shot of workers on dam with houses in background |
7 |
7 |
28 |
Kentucky River |
Lock No. 7 |
10/16/1897 |
"Dam Looking North from Abutment"; No. 76 (on back); shot of workers on dam with houses in background |
7 |
7 |
29 |
Kentucky River |
Lock No. 7 |
7/28/1898 |
"River Wall looking up-stream" (L-7/32); No. 65 (on back); H11-K7-104; shows men standing on wall |
8 |
7 |
1 |
Kentucky River |
Lock No. 7 |
7/28/1898 |
"River Wall looking up-stream"; H11-K7-127; shows men standing on wall |
8 |
7 |
2 |
Kentucky River |
Lock No. 7 |
7/2/1858 |
"View showing top of guard wall at lower end of river wall at lock entrance"; H11-K7-84; small shot of man on lock wall |
8 |
7 |
2 |
Kentucky River |
Lock and Dam No. 7 |
7/2/1858 |
"General view showing lower guard wall"; H11-K7-86; men visible in shot |
8 |
7 |
2 |
Kentucky River |
Lock and Dam No. 7 |
7/2/1858 |
"View looking upstream showing leaning guard wall"; H11-K7-85; shot of wall taken from water |
8 |
7 |
3 |
Kentucky River |
Lock and Dam |
|
General view of almost completed lock and dam, shows house and workers in background (L-7/76); H11-K7-98 |
8 |
7 |
3 |
Kentucky River |
Lock and Dam |
|
General view of almost completed lock and dam, shows house and workers in background (L-7/88); No. 81 (on back); H11-K7-100 |
8 |
7 |
4 |
Kentucky River |
Lock and Dam No. 7 |
6/17/1947 |
"General view looking across Dam, showing holes drilled by Kentucky Utilities in downstream face of Dam"; H11-K7-123; other stipulations listed on picture's description |
8 |
7 |
4 |
Kentucky River |
Lock and Dam No. 7 |
12/14/1950 |
"Looking downstream showing lock, dam, power house and transformer platform"; H11-K7-124 |
8 |
7 |
5 |
Kentucky River |
Lock No. 7 |
|
View of lock and lock houses (L-7/93); H11-K7-? |
8 |
7 |
6 |
Kentucky River |
Lock No. 7 |
|
View of lock and dam looking upstream (L-7/92); H11-K7-120 |
8 |
7 |
7 |
Kentucky River |
Lock No. 7 |
7/18/1896 |
"Cofferdam Looking North"; No. 26 (on back); H11-K7-25; shows barge and house in background |
8 |
7 |
8 |
Kentucky River |
Lock No. 7 |
6/2/1896 |
"Excavation For Abutment"; No. 7 (on back); shows workers in excavation pit |
8 |
7 |
9 |
Kentucky River |
Lock and Dam |
|
Aerial view of lock and dam, showing houses; H11-K7-122 |
8 |
7 |
10 |
Kentucky River |
Lock No. 7 |
7/28/1897 |
"Lock Walls looking down stream"; No. 66 (on back); shows completed lock walls from one side, with workers standing on walls and houses in background |
8 |
7 |
11 |
Kentucky River |
Lock No. 7 |
6/13/1896 |
"Lower Stone yard, looking east" (L-7/10); No. 11; H11-K7-10; shows workers on site |
8 |
7 |
11 |
Kentucky River |
Lock No. 7 |
6/13/1896 |
"Lower Stone yard, looking east"; No. 11; H11-K7-10; shows workers on site |
8 |
7 |
12 |
Kentucky River |
Lock No. 7 |
6/13/1896 |
"Upper Stone Yard" (L-7/9); No. 12; H11-K7-11; shows men and house near stone supplies |
8 |
7 |
12 |
Kentucky River |
Lock No. 7 |
6/13/1896 |
"Upper Stone Yard"; No. 12; H11-K7-11; shows men and house near stone supplies |
8 |
7 |
13 |
Kentucky River |
Lock No. 7 |
6/22/1896 |
"Lock pit excavation. Looking South" (L-7/16); No. 13; H11-K7-12; shows workers in excavation site with barge in background |
8 |
7 |
13 |
Kentucky River |
Lock No. 7 |
6/22/1896 |
"Lock Pit Excavation Looking South"; No. 13; H11-K7-12; shows workers in excavation site with barge in background |
8 |
8 |
14 |
Kentucky River |
Lock and Dam No. 8 |
9/12/1956 |
"View looking downstream, showing unstable condition of lower guard wall, plumb line shows extent of leaning"; H11-K8-35; shot of wall taken from water |
8 |
8 |
14 |
Kentucky River |
Lock No. 8 |
8/12/1956 |
"View looking upstream showing rotted timbers, lower lock gate"; H11-K8-37 |
8 |
8 |
14 |
Kentucky River |
Lock No. 8 |
8/12/1956 |
"View looking upstream showing rotted timbers, lower lock gate" |
8 |
8 |
14 |
Kentucky River |
Lock No. 8 |
8/12/1956 |
"View looking upstream showing rotted timbers, lower lock gate" |
8 |
8 |
14 |
Kentucky River |
Lock No. 8 |
7/18/1950 |
"View showing pleasure boats in Lock No. 8"; H11-K8-27; shows a number of boats and people |
8 |
8 |
14 |
Kentucky River |
Lock No. 8 |
8/12/1956 |
"View showing sinking piers, upper guard piers"; H11-K8-36 |
8 |
8 |
14 |
Kentucky River |
Lock No. 8 |
8/12/1956 |
"View showing sinking piers, upper guard piers" |
8 |
8 |
14 |
Kentucky River |
Lock No. 8 |
8/12/1956 |
"View showing sinking piers, upper guard piers" |
8 |
8 |
14 |
Kentucky River |
Lock No. 8 |
8/12/1956 |
"View looking at upstream face of lower gate showing rotted timbers"; H11-K8-32 |
8 |
8 |
14 |
Kentucky River |
Lock No. 8 |
8/12/1956 |
"View looking at upstream face of lower gate showing rotted timbers" |
8 |
8 |
14 |
Kentucky River |
Lock No. 8 |
8/12/1956 |
"View looking at upstream face of lower gate showing rotted timbers" |
8 |
8 |
14 |
Kentucky River |
Lock No. 8 |
8/12/1956 |
"View showing leakage, land leaf lower gate"; H11-K8-33 |
8 |
8 |
14 |
Kentucky River |
Lock No. 8 |
8/12/1956 |
"View showing leakage, land leaf lower gate" |
8 |
8 |
14 |
Kentucky River |
Lock No. 8 |
8/12/1956 |
"View showing leakage, land leaf lower gate" |
8 |
8 |
14 |
Kentucky River |
Lock No. 8 |
8/12/1956 |
"Land leaf lower gate showing leakage"; H11-K8-34 |
8 |
8 |
14 |
Kentucky River |
Lock No. 8 |
8/12/1956 |
"Land leaf lower gate showing leakage" |
8 |
8 |
14 |
Kentucky River |
Lock No. 8 |
8/12/1956 |
"Land leaf lower gate showing leakage" |
8 |
8 |
14 |
Kentucky River |
Lock No. 8 |
7/2/1958 |
"View showing leak through lower miter sill foundation and deteriorated condition of wood gate"; H11-K8-11 |
8 |
8 |
14 |
Kentucky River |
Lock and Dam No. 8 |
7/2/1958 |
"View looking upstream showing leaning guard wall"; H11-K8-9 |
8 |
8 |
14 |
Kentucky River |
Lock No. 8 |
8/12/1956 |
"View looking upstream, showing extent of leaning of lower guard wall; Rope is hanging perpendicular"; H11-K8-10; is also a view of lock doors |
8 |
8 |
14 |
Kentucky River |
Lock No. 8 |
8/12/1956 |
"View looking upstream, showing extent of leaning of lower guard wall; Rope is hanging perpendicular"; H11-K8-10; is also a view of lock doors |
8 |
8 |
14 |
Kentucky River |
Lock No. 8 |
8/12/1956 |
"View looking upstream, showing extent of leaning of lower guard wall; Rope is hanging perpendicular"; H11-K8-10; is also a view of lock doors |
8 |
8 |
14 |
Kentucky River |
Lock No. 8 |
8/12/1956 |
"View showing lower guard wall"; H11-K8-12 |
8 |
8 |
14 |
Kentucky River |
Lock No. 8 |
8/12/1956 |
"View showing lower guard wall"; H11-K8-12 |
8 |
8 |
14 |
Kentucky River |
Lock No. 8 |
8/12/1956 |
"View showing lower guard wall"; H11-K8-12 |
8 |
8 |
14 |
Kentucky River |
Lock |
7/22/1899 |
"Pivot Stone of Lower Gate, River Wall, with part of Lower Mitre Wall; Looking across Lock" (L-8/17); H11-K8-15 |
8 |
8 |
14 |
Kentucky River |
Lock |
7/22/1899 |
"Pivot Stone of Lower Gate, Land Wall; Looking Upstream" (L-8/16); H11-K8-22 |
8 |
8 |
15 |
Kentucky River |
Lock No. 8 |
8/12/1956 |
"View showing upstream lower gate"; H11-K8-14; two men are in shot |
8 |
8 |
15 |
Kentucky River |
Lock No. 8 |
8/12/1956 |
"View showing upstream lower gate"; H11-K8-14; two men are in shot |
8 |
8 |
15 |
Kentucky River |
Lock No. 8 |
8/12/1956 |
"View showing upstream lower gate"; H11-K8-14; two men are in shot |
8 |
8 |
15 |
Kentucky River |
Lock and Dam No. 8 |
9/12/1956 |
"View showing manual operation of lock gate. Propose to operate with portable electric drill and gear reducer to reduce labor"; H11-K8-13; three men are in shot |
8 |
8 |
15 |
Kentucky River |
Lock and Dam No. 8 |
7/2/1958 |
"View looking upstream showing leaning guard wall"; H11-K8-9 |
8 |
8 |
15 |
Kentucky River |
Lock No. 8 |
7/2/1958 |
"View showing leak through lower mitre sill foundation and deteriorated condition of wood gate"; H11-K8-11 |
8 |
8 |
16 |
Kentucky River |
Lock No. 8 |
7/12/1899 |
"Commencement of Abutment Excavation" (L-8/13); No. 8; H11-K8-20; very faint image |
8 |
8 |
16 |
Kentucky River |
Lock No. 8 |
6/22/1899 |
"Bottom Course of Lower End of River Wall" (L-8/6); No. 2; H11-K8-8; shows a worker by river wall during construction |
8 |
8 |
16 |
Kentucky River |
Lock No. 8 |
7/1/1899 |
"1st, 2nd & 3rd Courses River Wall" (L-8/7); No. 3; H11-K8-23; very faint image, shows workers on site near river wall during construction |
8 |
8 |
16 |
Kentucky River |
Lock No. 8 |
7/8/1899 |
"First 3 Courses of Lower End" (L-8/11); No. 6; H11-K8-19; very faint image showing workers on construction site |
8 |
8 |
16 |
Kentucky River |
Lock No. 8 |
7/12/1899 |
"First 3 Courses of Lower End of Land Wall" (L-8/12); No. 7; H11-K8-16; very faint image showing workers on construction site |
8 |
8 |
16 |
Kentucky River |
Lock No. 8 |
7/8/1899 |
First 3 Courses of Lower End (according to notebook finding aid) (L-8/10); No. 6A; H11-K8-18; very faint image showing men on construction site |
8 |
8 |
16 |
Kentucky River |
Lock No. 8 |
|
"Lock House" (L-8/18); H11-K8-17 |
8 |
8 |
16 |
Kentucky River |
Lock No. 8 |
7/1/1899 |
"General View, Looking Downstream" (L-8/8); No. 4; H11-K8-21; very faint image showing workers on construction site |
8 |
8 |
16 |
Kentucky River |
Lock No. 8 |
6/22/1899 |
"General View of Coffer, Looking Downstream" (L-8/5); No. 7; H11-K8-24; very faint image showing construction site |
8 |
8 |
16 |
Kentucky River |
Lock and Dam No. 8 |
12/16/1950 |
"General view of Lock and Dam; File No. 25094"; H11-K8-25; shot of lock and dam from a distance, showing surrounding area |
8 |
8 |
16 |
Kentucky River |
Lock and Dam No. 8 |
12/16/1950 |
"General view of Lock and Dam; File No. 25094"; H11-K8-25; shot of lock and dam from a distance, showing surrounding area |
8 |
8 |
16 |
Kentucky River |
Lock and Dam No. 8 |
12/16/1950 |
"General view of Lock and Dam; File No. 25094"; H11-K8-25; shot of lock and dam from a distance, showing surrounding area |
8 |
8 |
16 |
Kentucky River |
Lock and Dam No. 8 |
12/16/1950 |
"General view of Lock and Dam; File No. 25094"; H11-K8-25; shot of lock and dam from a distance, showing surrounding area |
8 |
8 |
16 |
Kentucky River |
Lock No. 8 |
6/30/1934 |
"Lockeepers House; Contract Symbol No. W203 ENG.-676; Edwin C. Gilson - Contractor - Lexington, KY"; H11-K8-31; picture of house during construction |
8 |
8 |
16 |
Kentucky River |
Lock No. 8 |
8/3/1934 |
"Lockeepers house; Contract #W203eng-676; Edwin C. Gilson; General Contractor - 620 East Third St., Lexington Ky."; H11-K8-29; shot of house while construction almost complete |
8 |
8 |
16 |
Kentucky River |
Lock No. 8 |
8/26/1934 |
"Lockkeeper's House; Contract Symbol No. W 203 eng-676; Edwin C. Gilson, 620 E. Third St., Lexington, Ky.; General Contractor"; H11-K8-30; shot of completed house |
8 |
8 |
16 |
Kentucky River |
Lock No. 8 |
7/18/1950 |
"View showing pleasure boats in Lock No. 8; File No. 25098"; H11-K8-28; shows people on boats and walls of lock |
8 |
8 |
16 |
Kentucky River |
Lock No. 8 |
7/18/1950 |
"View showing pleasure boats in Lock No. 8; File No. 25098"; shows people on boats and walls of lock |
8 |
8 |
16 |
Kentucky River |
Lock No. 8 |
7/18/1950 |
"View showing pleasure boats in Lock No. 8; File No. 25098"; shows people on boats and walls of lock |
8 |
8 |
16 |
Kentucky River |
Lock No. 8 |
7/18/1950 |
"View showing pleasure boats in Lock No. 8; File No. 25098"; shows people on boats and walls of lock |
8 |
8 |
16 |
Kentucky River |
Lock No. 8 |
7/18/1950 |
"View showing pleasure boats in Lock No. 8; File No. 25098"; shows people on boats and walls of lock |
8 |
8 |
16 |
Kentucky River |
Lock No. 8 |
7/18/1950 |
"View showing pleasure boats in Lock No. 8; File No. 25098"; shows people on boats and walls of lock |
8 |
8 |
16 |
Kentucky River |
Lock No. 8 |
7/18/1950 |
"View showing pleasure boats in Lock No. 8; File No. 25098"; shows people on boats and walls of lock |
8 |
8 |
16 |
Kentucky River |
Lock and Dam No. 8 |
12/16/1950 |
"General view of Lock and Dam; File No. 25092"; H11-K8-26; shot of lock and dam from a distance, showing surrounding area |
8 |
8 |
16 |
Kentucky River |
Lock and Dam No. 8 |
12/16/1950 |
"General view of Lock and Dam; File No. 25092"; shot of lock and dam from a distance, showing surrounding area |
8 |
8 |
16 |
Kentucky River |
Lock and Dam No. 8 |
12/16/1950 |
"General view of Lock and Dam; File No. 25092"; shot of lock and dam from a distance, showing surrounding area |
8 |
8 |
16 |
Kentucky River |
Lock and Dam No. 8 |
12/16/1950 |
"General view of Lock and Dam; File No. 25092"; shot of lock and dam from a distance, showing surrounding area |
8 |
8 |
16 |
Kentucky River |
Lock and Dam No. 8 |
12/16/1950 |
"General view of Lock and Dam; File No. 25092"; shot of lock and dam from a distance, showing surrounding area |
8 |
9 |
17 |
Kentucky River |
Lock |
|
General view of lock, showing barge and houses (L-9/1); H11-K9-8 |
8 |
9 |
17 |
Kentucky River |
Lock |
|
General view of lock close up during construction process (L-9/2); H11-K9-9 |
8 |
9 |
17 |
Kentucky River |
Lock |
|
General view of lock during construction process (L-9/3); H11-K9-10 |
8 |
9 |
17 |
Kentucky River |
Lock |
|
General view of lock during construction, showing steamship in background (L-9/10); H11-K9-11 |
8 |
9 |
17 |
Kentucky River |
Lock |
|
General view of lock during construction, showing horses, workers, and houses in background (L-9/13); H11-K9-12 |
8 |
9 |
17 |
Kentucky River |
Lock |
|
General view of lock during construction process (L-9/14); H11-K9-13 |
8 |
9 |
17 |
Kentucky River |
Lock |
|
General view of lock during construction process (L-9/15); H11-K9-14 |
8 |
9 |
18 |
Kentucky River |
Lock No. 9 |
|
View of bottom of lock with workers in it (L-9/21); H11-K9-15 |
8 |
9 |
18 |
Kentucky River |
Lock No. 9 |
7/18/1950 |
"View showing pleasure boats in Lock No. 9; File No. 25099"; H11-K9-16; shows people on boats |
8 |
9 |
18 |
Kentucky River |
Dam No. 9 |
|
View of Dam, showing houses in background (L-9/22); H11-K9-4 |
8 |
9 |
19 |
Kentucky River |
Lock |
|
View of lock wall, looking upstream (L-9/26); H11-K9-3; shows houses in background |
8 |
9 |
20 |
Kentucky River |
Lock |
|
View of bottom of lock with workers in it (L-9/20); H11-K9-2 |
8 |
9 |
21 |
Kentucky River |
Lock No. 9 |
8/11/1903 |
"First Coffer For Dam" (L-9/16); H11-K9-1; shows workers during construction |
8 |
9 |
22 |
Kentucky River |
Lock No. 9 |
|
View of outside wall (L-9/19); H11-K9-5; shows house in background |
8 |
9 |
23 |
Kentucky River |
Lock No. 9 |
|
View of lock wall (L-9/17); H11-K9-? |
8 |
9 |
24 |
Kentucky River |
Lock No. 9 |
|
General view of lock showing house in background (L-9/18); very faint image |
9 |
10 |
1 |
Kentucky River |
|
|
|
9 |
10 |
2 |
Kentucky River |
Site |
|
View looking upriver at dredging (L-10/4); H11-K10-23 |
9 |
10 |
3 |
Kentucky River |
Lock No. 10 |
|
View of lock buildings (L-10/29); H11-K10-29; small image with illegible writing on back |
9 |
10 |
3 |
Kentucky River |
Lock |
|
View of lock gates while open, with men on top (L-10/21); H11-K10-16 |
9 |
10 |
3 |
Kentucky River |
Lock No.10 |
|
"1904" (on back) (L-10/25); H11-K10-17; view of lock and dam with houses in background |
9 |
10 |
3 |
Kentucky River |
Lock No.10 |
|
"1904; Beattyville Dam" (on back) (L-10/26); H11-K10-18; view of bottom of dam with workers inside and house visible in background |
9 |
10 |
3 |
Kentucky River |
Lock and Dam |
|
View of Lock and Dam from one side, showing houses in background (L-10/30); H11-K10-19 |
9 |
10 |
3 |
Kentucky River |
Lock and Dam No. 10 |
7/2/1958 |
"General view showing leaning guide wall looking downstream"; H11-K10-20 |
9 |
10 |
3 |
Kentucky River |
Lock and Dam No. 10 |
7/2/1958 |
"View showing leaning lower guide wall"; H11-K10-21 |
9 |
10 |
4 |
Kentucky River |
Lock No. 10 |
|
"1903; Handling Rock" (L-10/11); H11-K10-40; small photo showing workers handling supplies with machinery; horse blurry but visible |
9 |
10 |
5 |
Kentucky River |
Lock No. 10 |
|
"1903; Looking Down" (L-10/12); H11-K10-10; shot looking down river at lock, shows house in background |
9 |
10 |
6 |
Kentucky River |
Lock and Dam No. 10 |
7/2/1958 |
"General view showing leaning guide wall looking downstream"; H11-K10-20 |
9 |
10 |
6 |
Kentucky River |
Lock and Dam No. 10 |
7/2/1958 |
"View showing leaning lower guide wall"; H11-K10-21 |
9 |
10 |
7 |
Kentucky River |
Lock No. 10 |
|
"May 1904" (L-10/20); H11-K10-22; view of dredging vessel |
9 |
10 |
7 |
Kentucky River |
Lock No. 10 |
|
"May 1904" (L-10/23); H11-K10-23; view of equipment |
9 |
10 |
7 |
Kentucky River |
Lock No. 10 |
|
"May 1904" (L-10/22); H11-K10-24; view of lock gates while open with workers sitting on them |
9 |
10 |
7 |
Kentucky River |
Lock No. 10 |
|
"May 1904" (L-10/17); H11-K10-25; view of lock wall with houses visible |
9 |
10 |
7 |
Kentucky River |
Lock No. 10 |
|
"1904" (L-10/24); H11-K10-27; view of lock gates while closed with workers standing on them |
9 |
10 |
7 |
Kentucky River |
Lock No. 10 |
|
"Oct 1904" (L-10/28); H11-K10-30; view down lock with workers visible at end |
9 |
10 |
7 |
Kentucky River |
Lock No. 10 |
|
"1904" (L-10/27); H11-K10-31; view of lock gates while closed with workers standing in front of them |
9 |
10 |
7 |
Kentucky River |
Lock and Dam No. 10 |
12/15/1950 |
"General view of Lock and part of Dam; File No. 25089"; H11-K10-37; house barely visible behind trees |
9 |
10 |
7 |
Kentucky River |
Lock and Dam No. 10 |
12/15/1950 |
"General view of Lock and part of Dam; File No. 25089"; house barely visible behind trees |
9 |
10 |
7 |
Kentucky River |
Lock and Dam No. 10 |
12/15/1950 |
"General view of Lock and part of Dam; File No. 25089"; house barely visible behind trees |
9 |
10 |
7 |
Kentucky River |
Lock and Dam No. 10 |
12/15/1950 |
"Looking downstream across lock chamber from upper guard wall; File No. 25090"; H11-K10-36; houses visible in background |
9 |
10 |
7 |
Kentucky River |
Lock and Dam No. 10 |
12/15/1950 |
"Pleasure boats at Boonesboro Boat Club dock near Lock and Dam No. 10. Boats of this type navigate Locks 8 through 14; File No. 25091"; H11-K10-33; shot of docked boats |
9 |
10 |
7 |
Kentucky River |
Lock No. 10 |
7/18/1950 |
"View showing portion of Coast Guard Auxiliary flotilla at Boonesboro Boat Dock near Lock No. 10; File No. 25101"; H11-K10-35; shows people and boats at dock with bridge in background |
9 |
10 |
7 |
Kentucky River |
Lock No. 10 |
7/18/1950 |
"View showing portion of Coast Guard Auxiliary flotilla at Boonesboro Boat Dock near Lock No. 10; File No. 25100"; H11-K10-34; shot of boats and bridge taken from back of boat |
9 |
10 |
8 |
Kentucky River |
Lock No. 10 |
|
"1903; Hole in bed, lock under upper cross wall developed in excavation" (L-10/10); H11-K10-8; shows workers in and near hole |
9 |
10 |
8 |
Kentucky River |
Lock No. 10 |
|
"1903; Looking up" (L-10/13); H11-K10-11; shot looking upstream at lock |
9 |
10 |
9 |
Kentucky River |
Lock |
|
View of area around lock, showing some structures (L-10/15); H11-K10-13 |
9 |
10 |
9 |
Kentucky River |
Lock |
|
View of lock construction, showing workers, machinery, mule, and cart and rail system |
9 |
10 |
10 |
Kentucky River |
Lock |
|
View of barge, including mule and worker in view (L-10/16); H11-K10-14 |
9 |
10 |
10 |
Kentucky River |
Lock |
12/5/1902 |
View of lock keepers' houses and site from river, with workers in view (L-10/3); H11-K10-28 |
9 |
10 |
11 |
Kentucky River |
Lock |
11/8/1902 |
View of lock area, showing some houses in background (L-10/1); H11-K10-26 |
9 |
10 |
12 |
Kentucky River |
Lock No. 10 |
|
"Dec 1903; General View" (L-10/9); H11-K10-6 & H11-K10-7; view of lock area showing houses in background, machinery, workers, and mules |
9 |
10 |
13 |
Kentucky River |
Lock No. 10 |
|
|
9 |
10 |
14 |
Kentucky River |
Lock No. 10 |
|
|
9 |
10 |
15 |
Kentucky River |
Lock No. 10 |
|
|
9 |
10 |
16 |
Kentucky River |
Lock No. 10 |
|
|
9 |
10 |
17 |
Kentucky River |
Lock No. 10 |
|
|
9 |
10 |
18 |
Kentucky River |
Lock |
|
View of lock from river, showing houses (L-10/18); H11-K10-15 |
9 |
11 |
19 |
Kentucky River |
Lock |
|
View of area near Lock 11 (L-11/66); H11-K11-1 |
9 |
11 |
19 |
Ohio River |
Indiana Caving Bank |
|
"New Albany, Indiana Caving Bank from K & I Bridge; Ohio River; Copy negative from a post card provided by W. E. Kreisle, ED-S; 15M-103"; shows houses and barge |
9 |
12 |
20 |
Kentucky River |
Lock No. 12 |
|
Aerial view of Irvine and Ravenna (L-12/4); H11-K12-3 |
9 |
12 |
20 |
Kentucky River |
Lock No. 12 |
|
Aerial view of "Texaco Oil Refinery, at Pryse, Pool 12, KY River" (L-12/5); H11-K12-2 |
9 |
12 |
20 |
Kentucky River |
Lock No. 12 |
|
"June 25-29, 1934; Repair of four filling valves in lock walls; D.O. File 12-3.1 - 34/35 - 3.1" L-12/7; H11-K12-1; shows man on site and cars in background |
9 |
12 |
20 |
Kentucky River |
Lock No. 12 |
|
"June 25-29, 1934; Repair of four filling valves in lock walls, D.O. File 12-3.1 - 34/35 - 3.1" L-12/9; H11-K12-4; shows canoe |
9 |
12 |
20 |
Kentucky River |
Lock No. 12 |
|
"June 25-29, 1934; Repair of four filling valves in lock walls, D.O. File 12-3.1 - 34/35 - 3.1" L-12/8; H11-K12-5; close up shot of lock walls |
9 |
12 |
20 |
Kentucky River |
Lock No. 12 |
|
"June 25-29, 1934; Repair of four filling valves in lock walls, D.O. File 12-3.1 - 34/35 - 3.1" L-12/6; H11-K12-6; shows lock walls and pit |
9 |
12 |
20 |
Kentucky River |
Lock and Dam No. 12 |
4/17/1951 |
"General view of Lock and Dam; File No. 25297"; H11-K12-7 |
9 |
13 |
21 |
Kentucky River |
Lock No. 13 |
11/1/1914 |
View on river, showing men at work (L-13/52); H11-K13-16 |
9 |
13 |
21 |
Kentucky River |
Lock No. 13 |
11/1/1914 |
View of dredging barge (L-13/51); H11 _k13-15 |
9 |
13 |
21 |
Kentucky River |
Lock No. 13 |
10/25/1914 |
View down river, showing dredging, houses and steamship in background (L-13/50); H11-K13-14 |
9 |
13 |
21 |
Kentucky River |
Lock No. 13 |
10/17/1914 |
View of dam, showing men and barge (L-13/48); H11-K13-13 |
9 |
13 |
21 |
Kentucky River |
Lock No. 13 |
10/16/1914 |
View of lock and dam, showing shack in background (L-13/47); H11-K13-12 |
9 |
13 |
21 |
Kentucky River |
Lock No. 13 |
10/16/1914 |
View of dam showing men, and houses in background (L-13/46); H11-K13-11 |
9 |
13 |
21 |
Kentucky River |
Lock No. 13 |
7/25/1914 |
View of river wall, showing men at work (L-13/25); H11-K13-0 |
9 |
13 |
21 |
Kentucky River |
Lock No. 13 |
11/1/1914 |
View of dam, showing houses in background (L-13/53); H11-K13-17 |
9 |
13 |
21 |
Kentucky River |
Lock No. 13 |
|
"Sept 1913" View of Dam, showing cart and rail system (L-13/23); H11-K13-8 |
9 |
13 |
21 |
Kentucky River |
Lock No. 13 |
|
View of lock and dam, showing shacks in background (L-13/21); H11-K13-7 |
9 |
13 |
21 |
Kentucky River |
Lock No. 13 |
10/16/1912 |
"Concrete mixing plant. Rear of abument corewall" (L-13/4); H11-K13-1; shows men on site |
9 |
13 |
21 |
Kentucky River |
Lock No. 13 |
10/16/1912 |
View of abutment wall (includes a lot of description), showing houses in background (L-13/6); H11-K13-2 |
9 |
13 |
21 |
Kentucky River |
Lock No. 13 |
10/25/1912 |
"Top of protection wall" (more description included) (L-13/18); H11-K13-3; shows machinery, men on site, and houses in background |
9 |
13 |
21 |
Kentucky River |
Lock No. 13 |
11/30/1912 |
"20' downstream from upper end of River Wall; Abutment" (more description included) (L-13/12); H11-K13-4; shot of site |
9 |
13 |
21 |
Kentucky River |
Dam No. 13 |
12/13/1912 |
"Top of protection wall. Dam abd cofferdam construction" (more description included) (L-13/20); H11-K13-6; shows houses in background |
9 |
13 |
21 |
Kentucky River |
Lock No. 13 |
10/15/1912 |
"Centre abutment work; General view of progress of work" (more description included) (L-13/1); H11-K13-44 |
9 |
13 |
21 |
Kentucky River |
Lock No. 13 |
10/16/1912 |
"Lower end protection wall; bank protection" (more description included) (L-13/2); H11-K13-45; barge is visible |
9 |
13 |
21 |
Kentucky River |
Lock No. 13 |
10/16/1912 |
"Bank protection; condition of bank as left by Garretson" (more description included) (L-13/3); H11-K13-46; shows machinery and men on site |
9 |
13 |
21 |
Kentucky River |
Lock No. 13 |
10/16/1912 |
"Abutment wall; Embankment work" (more description included) (L-13/5); H11-K13-47 |
9 |
13 |
21 |
Kentucky River |
Lock No. 13 |
10/16/1912 |
"Embankment work" (more decription included) (L-13/7); H11-K13-48 |
9 |
13 |
21 |
Kentucky River |
Lock No. 13 |
11/4/1912 |
"Dam construction; Upper end river wall" (more description included) (L-13/10); H11-K13-49; shows men on site |
9 |
13 |
21 |
Kentucky River |
Lock |
11/30/1912 |
"Bank Protection" (more description included) (L-13/11); H11-K13-50 |
9 |
13 |
21 |
Kentucky River |
Lock |
11/30/1912 |
"Dam and Cofferdam construction" (more description included) (L-13/13); H11-K13-51; shows men on site and barge |
9 |
13 |
21 |
Kentucky River |
Lock No. 13 |
11/30/1912 |
"Bank protection" (more description included) (L-13/14); H11-K13-52 |
9 |
13 |
21 |
Kentucky River |
Lock No. 13 |
12/6/1912 |
"Abutment; Inundation of coffer dam" (more description included) (L-13/15); H11-K13-53 |
9 |
13 |
21 |
Kentucky River |
Lock No. 13 |
12/13/1912 |
"Bank protection; Progress on riprap work" (L-13/16); H11-K1354 |
9 |
13 |
21 |
Kentucky River |
Lock No. 13 |
12/13/1912 |
"Resume of operations after flooding of coffer" (more description included) (L-13/17); H11-K13-55 |
9 |
13 |
21 |
Kentucky River |
Dam No. 13 |
12/13/1912 |
"Dam Construction; Centre Dam" (more description included) (L-13/19); H11-K13-56; shows men on site |
9 |
13 |
21 |
Kentucky River |
Dam No. 13 |
12/13/1912 |
"Dam Construction; Center Dam" (more description included) (L-13/18); H11-K13-5; shows men on site and houses in background |
9 |
13 |
21 |
Kentucky River |
Dam |
11/7/1914 |
View of dam construction with men on site and houses in background (L-13/54); H11-K13-39 |
9 |
13 |
21 |
Kentucky River |
Dam |
11/26/1914 |
View across dam from one side, showing houses in background (L-13/59); H11-K13-32 |
9 |
13 |
21 |
Kentucky River |
Dam |
11/30/1914 |
View across dam from one side (L-13/60); H11-K13-33; File 250 (on back) |
9 |
13 |
21 |
Kentucky River |
Dam |
10/7/1914 |
Dam construction, showing workers on site and machinery (L-13/43); H11-K13-38 |
9 |
13 |
21 |
Kentucky River |
Dam |
10/8/1914 |
Dam construction, showing workers on site, machinery, and shacks in background (L-13/44); H11-K13-31 |
9 |
13 |
21 |
Kentucky River |
Dam |
11/18/1914 |
Shot of dam with men on it, and houses in background (L-13/58); H11-K13-35 |
9 |
13 |
21 |
Kentucky River |
Dam |
12/1/1914 |
View across dam from one side (L-13/61); H11-K13-34 |
9 |
13 |
21 |
Kentucky River |
Lock |
|
"Sept 1913" (on back) (L-13/22); H11-K13-28; view of site during construction, showing shacks in background |
9 |
13 |
21 |
Kentucky River |
Dam |
10/16/1914 |
Shot of dam with breaks in it, showing water pouring through; houses visible in background (L-13/45); H11-K13-40 |
9 |
13 |
21 |
Kentucky River |
Lock and Dam |
8/28/1914 |
Shot of site from one side, showing houses in background (L-13/27); H11-K13-23 |
9 |
13 |
21 |
Kentucky River |
Lock and Dam |
10/19/1914 |
General view of lock and dam (L-13/49); H11-K13-43 |
9 |
13 |
21 |
Kentucky River |
Lock and Dam |
9/11/1914 |
Shot of site during construction showing man on site and houses in background (KY.R. L-13/34); H11-K13-18 |
9 |
13 |
21 |
Kentucky River |
Lock and Dam |
9/2/1914 |
Shot of site during construction showing houses in background (L-13/32); H11-K13-21 |
9 |
13 |
21 |
Kentucky River |
Lock and Dam |
11/10/1914 |
Shot of site during construction showing men on site and houses in background (L-13/57); H11-K13-41 |
9 |
13 |
21 |
Kentucky River |
Lock and Dam |
9/20/1914 |
Shot of site during construction showing workers on site and houses in background (L-13/38); H11-K13-29 |
9 |
13 |
21 |
Kentucky River |
Dam |
9/6/1914 |
Shot of dam during construction with a large break in it; houses visible in background (L-13/33); H11-K13-22 |
9 |
13 |
21 |
Kentucky River |
Dam No. 13 |
8/30/1914 |
Shot of dam during construction with a large break in it; houses visible in background, and men seen on barge (L-13/31); H11-K13-20 |
9 |
13 |
21 |
Kentucky River |
Dam |
9/13/1914 |
Shot of dam during construction with a large break in it; houses visible in background (L-13/35); H11-K13-19 |
9 |
13 |
21 |
Kentucky River |
Dam |
11/7/1914 |
Shot of dam during construction with men on site (L-13/56); H11-K13-42 |
9 |
13 |
21 |
Kentucky River |
Lock and Dam |
7/29/1914 |
Shot of site during construction showing workers on site and houses in background (L-13/28); H11-K13-27 |
9 |
13 |
21 |
Kentucky River |
Lock and Dam |
7/30/1914 |
Shot of site during construction showing workers on site and houses in background (L-13/29); H11-K13-25 |
9 |
13 |
21 |
Kentucky River |
Lock and Dam |
7/30/1914 |
Shot of site during construction showing houses in background (L-13/30); H11-K13-26 |
9 |
13 |
21 |
Kentucky River |
Lock and Dam |
9/19/1914 |
Shot of site during construction showing workers on site and machinery (L-13/37); H11-K13-24 |
9 |
13 |
21 |
Kentucky River |
Lock and Dam |
9/29/1914 |
Shot of site during construction showing workers on site (L-13/42); H11-K13-36 |
9 |
13 |
21 |
Kentucky River |
Lock and Dam |
9/27/1914 |
Shot of site during construction showing workers on site (L-13/41); H11-K13-30 |
9 |
13 |
21 |
Kentucky River |
Lock and Dam |
9/27/1914 |
Shot of site during construction showing workers on site (L-13/40); H11-K13-37 |
9 |
13 |
21 |
Kentucky River |
Lock and Dam |
9/24/1914 |
Shot of site during construction showing workers on site (L-13/39); H11-K13-10 |
9 |
14 |
22 |
Kentucky River |
|
2/26/1890 |
View of Kentucky River flood at Beattyville on Feb 26, 1890 (more description included) (KY.R. P-14/17); H50-FK-1; shows houses during flooding |
9 |
14 |
23 |
Kentucky River |
Lock |
5/20/1915 |
View of lock from one side, showing houses on bank and men on barge (L-14/112); H11-K14-50 |
9 |
14 |
23 |
Kentucky River |
Dam No. 14 |
11/26/1912 |
"Construction, Cyclopean masonry" (more description included) (L-14/1); H11-K14-1; shows machinery |
9 |
14 |
23 |
Kentucky River |
Dam No. 14 |
12/30/1912 |
"Bed rock ready for concrete foundation for Sec. #4 Land Wall" (more description included) (L-14/10); H11-K14-52; shows two workers |
9 |
14 |
23 |
Kentucky River |
Dam No. 14 |
12/13/1912 |
"Excavation and form for Block No. 1, Sec No. 8, Land Wall" (more description included) (L-14/7); H11-K14-4 |
9 |
14 |
23 |
Kentucky River |
Dam No. 14 |
11/26/1912 |
"Stage of construction" (more description included) (L-14/2); H11-K14-2; shows man in shot |
9 |
14 |
23 |
Kentucky River |
Dam No. 14 |
12/5/1916 |
"Dam. Flow over dam" (more description included) (L-14/101); H11-K14-49; shows barge |
9 |
14 |
23 |
Kentucky River |
Dam No. 14 |
6/11/1913 |
"Forms and Construction stage; Lower Guide" (more description included) (L-14/22); H11-K14-13; shows workers on construction site |
9 |
14 |
23 |
Kentucky River |
Dam No. 14 |
6/11/1913 |
"Site of Upper Guide wall; Stage of excavation and conditions" (more description included) (L-14/23); H11-K14-14 |
9 |
14 |
23 |
Kentucky River |
Dam No. 14 |
6/22/1913 |
"Upstream back cor, same section; Bed-rock and fresh concrete" (more description included) (L-14/25); H11-K14-15; workers in shot |
9 |
14 |
23 |
Kentucky River |
Dam No. 14 |
7/14/1913 |
"Upstream back corner of Sec. 6, Land Wall; bed-rock and concrete" (more description included) (L-14/28); H11-K14-17; workers in shot |
9 |
14 |
23 |
Kentucky River |
Dam No. 14 |
7/17/1913 |
"Construction stage of Land Wall and placing concrete in footing for Sec. #7, Land Wall" (more description included) (L-14/30); H11-K14-19; workers in shot |
9 |
14 |
23 |
Kentucky River |
Dam No. 14 |
6/17/1914 |
"Lower Miter Wall; Construction" (more description included) (L-14/36); H11-K14-22; workers in shot |
9 |
14 |
23 |
Kentucky River |
Dam No. 14 |
9/4/1914 |
"Top of lower guide wall, Lower miter wall; Construction of miter and river walls" (L-14/42); H11-K14-24; workers in shot |
9 |
14 |
23 |
Kentucky River |
Dam No. 14 |
9/4/1914 |
"Top of lower guide wall, Lower miter wall; Construction of miter and river walls" (L-14/42); H11-K14-24; workers in shot |
9 |
14 |
23 |
Kentucky River |
Dam No. 14 |
9/4/1914 |
"Land wall; Bed rock under upper miter wall" (more description included) (L-14/43); H11-K14-25 |
9 |
14 |
23 |
Kentucky River |
Dam No. 14 |
11/15/1914 |
"Fallen derrick" (more description included) (L-14/46,47,48); H11-K14-26; train and workers in shot |
9 |
14 |
23 |
Kentucky River |
Dam No. 14 |
6/14/1915 |
"Upstream; Paving" (more description included) (L-14/55); H11-K14-27; shot of workers on site doing paving work |
9 |
14 |
23 |
Kentucky River |
Dam No. 14 |
5/8/1916 |
"Site of piers; dredge constructing bank coffer" (more description included) (L-14/59); H11-K14-28; shows dredge in river |
9 |
14 |
23 |
Kentucky River |
Dam No. 14 |
5/14/1916 |
"10 inch pump in action; unwatering coffer for piers" (more description included) (L-14/61); H11-K14-39; shows workers in shot |
9 |
14 |
23 |
Kentucky River |
Dam No. 14 |
7/21/1916 |
"Coffer for dam; riprapping top to protect filling" (more description included) (L-14/67); H11-K14-40; shows workers on site |
9 |
14 |
23 |
Kentucky River |
Dam No. 14 |
8/3/1916 |
"Coffer for dam; conditions during small rise" (more description included) (L-14/71); H11-K14-41 |
9 |
14 |
23 |
Kentucky River |
Dam No. 14 |
8/8/1916 |
"Coffer for dam; accumulation of logs and drift" (more description included) (L-14/77); No. 77; H11-K14-42 |
9 |
14 |
23 |
Kentucky River |
Dam No. 14 |
8/8/1916 |
"Coffer for dam; lower arm being washed out" (more description included) (L-14/78); No. 78; H11-K14-43 |
9 |
14 |
23 |
Kentucky River |
Dam No. 14 |
9/11/1916 |
"Excavation for dam; uncovering of bedrock" (more description included) (L-14/83); H11-K14-44; shows workers on site |
9 |
14 |
23 |
Kentucky River |
Dam No. 14 |
9/14/1916 |
"Section #8 of dam; Bedrock ready for concrete" (more description included) (L-14/85); H11-K14-45; shows workers on site |
9 |
14 |
23 |
Kentucky River |
Dam No. 14 |
9/14/1916 |
"Section #8 of dam; Bedrock ready for concrete" (more description included) (L-14/85); H11-K14-45; shows workers on site |
9 |
14 |
23 |
Kentucky River |
Dam No. 14 |
10/11/1916 |
"Dam; Construction stage" (more description included) (L-14/92); No. 92; H11-K14-46 |
9 |
14 |
23 |
Kentucky River |
Dam No. 14 |
10/11/1916 |
"Dam; Construction stage" (more description included) (L-14/92); H11-K14-46 |
9 |
14 |
23 |
Kentucky River |
Dam No. 14 |
12/5/1916 |
"Dam; water passing over for first time" (more description included) (L-14/99); H11-K14-47 |
9 |
14 |
23 |
Kentucky River |
Dam No. 14 |
12/5/1916 |
"Dam; water passing over for first time" (more description included); H11-K14-47 |
9 |
14 |
23 |
Kentucky River |
Dam No. 14 |
12/5/1916 |
"Lock chamber" (L-14/100); No. 100; H11-K14-48 |
9 |
14 |
23 |
Kentucky River |
Dam No. 14 |
12/5/1916 |
"Lock chamber"; No. 100; H11-K14-48 |
9 |
14 |
23 |
Kentucky River |
Dam No. 14 |
12/5/1916 |
"Dam; Flow over dam"; No. 101; H11-K14-49; barge visible in shot |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
1/3/1917 |
"Dam. Showing action of water over dam"; No. 103; H11-K14-142 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
1/3/1917 |
"Dam. Showing action of water over dam" (L-14/102); No. 102; H11-K14-141 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
1/3/1917 |
"Dam. Showing action of water over dam" (L-14/102); No. 102; H11-K14-140 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
9/18/1916 |
"Foundation for Sec. #6, Showing cleaning bedrock for concrete" (L-14/90); H11-K14-131; shows workers on site |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
9/4/1914 |
"Upper end of river wall, showing foundation of upper miter wall" (L-14/45); H11-K14-100; shows workers on site |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
9/4/1914 |
"Upper end of river wall, showing foundation of upper miter wall" (L-14/45); H11-K14-99; shows workers on site |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
11/15/1914 |
"Bank back of upper guide, showing fallen derrick" (L-14/46, 47, 48); H11-K14-101; train engine in shot |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
11/15/1914 |
"Fallen derrick"; H11-K14-102; shows men on train engine |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
6/7/1915 |
"Up stream, showing fallen derrick" (L-14/50); H11-K14-104A; workers visible in background |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
6/7/1915 |
"Up stream, showing fallen derrick" (L-14/50); H11-K14-104B; workers visible in background |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
6/7/1915 |
View of lock with a house in background (L-14/49); H11-K14-103 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
8/5/1913 |
"Site of abutment, showing Excavation and wall crusher plant" (L-14/32); H11-K14-94; shows workers across river |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
6/25/1914 |
"Down stream, showing watering back fill" (L-14/37); H11-K14-96; shows men on site |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
7/10/1913 |
"Up stream, showing Bed-rock and foundation for sec. 4, Land Wall" (L-14/26); H11-K14-90 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
7/17/1913 |
"Lower back corner of foundation for sec. 7, Land Wall, showing Bed-rock and cemented gravel used for form for footing course masonry" (L-14/29); H11-K14-92; man in shot |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
7/10/1913 |
"Upstream, showing Stage of construction and placing concrete in footing for section #5, Land Wall" (L-14/27); H11-K14-91; men in shot |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
5/31/1913 |
"Construction of Sec's 1, 3, 4 & 8, Land Wall, showing Stage of construction" (L-14/21); H11-K14-89 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
6/7/1915 |
"Pointing upstream, showing curb construction and placing ballast"; No. 51; H11-K14-106; men in shot |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
6/12/1915 |
"Pointing to Lock chamber, showing Erection of steel derrick" (L-14/52); H11-K14-107 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
6/12/1915 |
"Pointing to Lock chamber, showing Erection of steel derrick" (L-14/52); H11-K14-108 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
6/12/1915 |
"Pointing to Abutment, showing Construction stage" (L-14/54); H11-K14-110 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
8/7/1916 |
"Pointing to coffer for dam, showing coffer during rise" (L-14/74); H11-K14-124 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
8/7/1916 |
"Pointing to coffer for dam, showing conditions during rise" (L-14/75); H11-K14-125 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
12/13/1912 |
"Forms for emptying culvert for Lower Valves in Sec. 8, Land Wall" (L-14/8); H11-K14-78 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
1/8/1913 |
"Pointing to Site of Lock, showing conditions when Lower gage read 35.0" (L-14/13); H11-K14-81 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
7/18/1913 |
"Pointing upstream, behind Lower Guide, showing original and revised sections of Lower Guide with lower end of Land Wall in background" (L-14/31); H11-K14-93 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
8/27/1913 |
"Pointing to Upper Guide and Wing, showing Construction stage" (L-14/33); H11-K14-95; shows workers on site, barge and houses in background |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
6/25/1914 |
"Showing construction of derrick stone toe" (L-14/38); H11-K14-97 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
9/4/1914 |
"Pointing to Foundation for upper miter wall, showing Bed rock" (L-14/40); H11-K14-98; men in shot |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
8/7/1916 |
"Pointing to coffer for dam, showing conditions during rise" (L-14/73); H11-K14-123 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
7/21/1916 |
"Pointing to dam, showing construction stage of dam and coffer" (L-14/65); H11-K14-118; workers in shot |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
5/31/1916 |
"Pointing to site for piers, showing excavation flooded by rise" (L-14/64); H11-K14-117 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
5/29/1916 |
"Pointing to coffer for piers, showing construction stage of piers" (L-14/63); H11-K14-116 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
5/26/1916 |
"Pointing to coffer for piers, showing excavation reaching bedrock" (L-14/62); H11-K14-115; shows men at work |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
11/26/1912 |
"Pointing to Lower Guide Wall, showing Stage of Construction" (L-14/3); H11-K14-75 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
11/26/1912 |
"Cor. Lower Wing and Lower Guide, showing Lower Wing Completed and condition of bank below same"; H11-K14-76 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
1/7/1913 |
"Site of Land Wall, showing Condition of work when Lower gage read 31.0" (L-14/9); H11-K14-79 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
1/7/1913 |
"Submerged Lower Guide and Plant. Gage = 30.3" (L-14/12); H11-K14-80 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
6/15/1915 |
"Ballast and paving" (L-14/57); H11-K14-112; shows workers, tools, and bridge |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
6/14/1915 |
"Abutment, showing paving and abutment" (L-14/56); H11-K14-111; workers in shot |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
12/13/1912 |
"Drain to weep holes, behind Lower Guide, showing rip rap and crushed stone Construction" (L-14/5); H11-K14-77 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
5/10/1913 |
"Showing progress of work--miscellaneous form construction" (L-14/19); H11-K14-87; men in shot |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
4/12/1913 |
"Pointing upstream, showing condition of plant and work" (L-14/18); H11-K14-86; men in shot |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
4/1/1913 |
"Pointing to Banks behind Lower Wing, showing Erosion by water" (L-14/17); H11-K14-85 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
1/14/1913 |
"Pointing upstream, showing condition of Plant after ride of Jan 8th, 1913" (L-14/14); H11-K14-83 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
1/14/1913 |
"Pointing upstream, showing condition of plant and work" (L-14/16); H11-K14-84 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
3/12/1913 |
"Site of Abutment, showing Progress of excavation for Abutment" (L-14/15); H11-K14-83 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
8/5/1916 |
"Pointing to coffer for dam, showing pumps immediately after starting to unwater" (L-14/72); H11-K14-122 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
7/29/1916 |
"Pointing to upper arm of coffer for dam, showing construction and banking of crib" (L-14/70); H11-K14-121; canoe in shot |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
7/22/1916 |
"Pointing to lower arm of coffer for dam, showing small rise going over box coffer" (L-14/69); H11-k14-120 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
7/21/1916 |
"Lower arm of coffer for dam, showing construction stage and small rise" (L-14/66); H11-K14-119; men in shot |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
1/6/1917 |
"Lock, showing water over lock"; No. 110; H11-K14-105 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
5/31/1913 |
"Const. of Sec's 5, 4, 3 & 1, Land Wall, showing Stage of Construction" (L-14/20); H11-K14-88; men in shot |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
5/8/1916 |
"Wing of upper guide wall, showing progress of backfilling" (L-14/58); H11-K14-113 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
5/8/1916 |
"Pointing to dam, showing condition as left by contractors" (L-14/60); H11-K14-114 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
6/12/1915 |
"Sand pumping boat" (L-14/53); H11-K14-109; men shown on back of boat |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
1/6/1917 |
"Pointing upstream, showing action of water on bank above curb"; No. 108; H11-K14-147 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
9/17/1916 |
"Pointing to Dam, showing Coffer and construction stage" (L-14/87); H11-K14-130; men on site |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
9/12/1916 |
"Section #7 of dam, showing bedrock ready for concrete" (L-14/84); H11-K14-128; workers on site |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
12/5/1916 |
"Dam, showing water going over for first time"; H11-K14-139 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
12/5/1916 |
"Dam, showing completed dam" (L-14/97); H11-K14-138 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
10/21/1916 |
"Dam, showing small rise before closing sluiceway" (L-14/93); H11-K14-134 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
11/8/1916 |
"Dam after closing sluiceway, showing construction stage and pool filling" (L-14/95); H11-K14-136 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
1/5/1917 |
"Lower end of River wall, showing Action of water below dam"; H11-K14-145; houses in background |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
1/5/1917 |
"Lower end of River wall, showing Action of water below dam"; No. 107; H11-K14-146; houses in background |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
1/3/1917 |
"Dam, showing Action of water below dam"; H11-K14-143 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
1/5/1917 |
"Dam, showing Action of water below the dam"; No. 105; H11-K14-144 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
1/5/1917 |
"Pointing upstream, showing Water over paving"; No. 109; H11-K15-148 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
8/8/1916 |
"Coffer for dam, showing conditions during rise" (L-14/76); H11-k14-126 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
9/5/1916 |
"Coffer for dam, showing replaced bank coffer before pumps were started" (L-14/82); H11-K14-127; man on site |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
9/17/1916 |
"Dam, showing cofferdam and sluice way" (L-14/86); H11-K14-129; men in shot |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
9/23/1916 |
"Dam, showing Construction stage" (L-14/91); H11-K14-133 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
9/23/1916 |
"Dam, showing Construction stage" (L-14/91); H11-K14-132 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
11/8/1916 |
"Dam, showing sluiceway day after completion" (L-14/94); H11-K14-135 |
9 |
14 |
24 |
Kentucky River |
Dam No. 14 |
12/5/1916 |
"Dam, Completed dam and trestle recesses" (L-14/96); H11-K14-137 |
9 |
14 |
24 |
Kentucky River |
Dam |
|
View of water at bottom of dam; H11-K14-62 |
9 |
14 |
24 |
Kentucky River |
Dam |
|
View of water at bottom of dam |
9 |
14 |
24 |
Kentucky River |
Dam |
|
View of water at bottom of dam; H11-K14-65 |
9 |
14 |
24 |
Kentucky River |
Dam |
|
View of water at bottom of dam |
9 |
14 |
24 |
Kentucky River |
Dam |
|
View of water at bottom of dam; H11-K14-63 |
9 |
14 |
24 |
Kentucky River |
Dam |
|
View of water at bottom of dam |
9 |
14 |
24 |
Kentucky River |
Dam |
|
View of water at bottom of dam; H11-K14-64 |
9 |
14 |
24 |
Kentucky River |
Dam |
|
View of water at bottom of dam |
9 |
14 |
24 |
Kentucky River |
Dam |
|
View of water at bottom of dam; H11-K14-66 |
9 |
14 |
24 |
Kentucky River |
Dam |
|
View of water at bottom of dam |
9 |
14 |
24 |
Kentucky River |
Dam |
|
View of water at bottom of dam; H11-K14-67 |
9 |
14 |
24 |
Kentucky River |
Lock No. 14 |
2/27/1929 |
"High Tide" (on back); View of water at bottom of dam |
9 |
14 |
24 |
Kentucky River |
Lock |
|
View of lock, with houses in background (L-14/115); H11-K14-71 |
9 |
14 |
24 |
Kentucky River |
Lock |
|
View of outside wall (L-14/113); H11-K14-72 |
9 |
14 |
24 |
Kentucky River |
Lock and Dam No. 14 |
|
View of lock area (L-14/114); H11-K14-73 |
9 |
14 |
24 |
Kentucky River |
Lock No. 14 |
7/10/1913 |
View of footings with workers in shot (L-14/117); H11-K14-74 |
9 |
14 |
24 |
Kentucky River |
Lock |
|
View of piers with man in shot (L-14/116); H11-K14-70 |
9 |
14 |
25 |
Kentucky River |
Beattyville Dam |
6/28/1886 |
View of Beattyville Dam, showing houses in background (KY.R. P-14/13); H11-K14-8 |
9 |
14 |
25 |
Kentucky River |
Beattyville Dam |
6/22/1886 |
View of Beattyville Dam, showing houses in background (KY.R. P-14/14); H11-K14-9 |
9 |
14 |
26 |
Kentucky River |
Beattyville Dam |
|
"1886" (LY.R. P-14/16); H11-K14-10; shot taken from a distance showing houses in background |
9 |
14 |
26 |
Kentucky River |
Lock |
|
View of lock area, showing houses in background (KY.R. P-14/21); H11-K14-12 |
9 |
14 |
27 |
Kentucky River |
Dam |
|
"1886" (KY.R. P 14/20); H11-K14-11; view of dam showing men on site and houses in background |
9 |
14 |
27 |
Kentucky River |
Lock |
|
"1886" (KY.R. P-14/30); H11-K14-53; view of lock with workers on site |
9 |
14 |
28 |
Kentucky River |
Lock and Dam |
|
"1886" (KY-R. P-14/26); H11-K14-16; view of lock and dam showing house in background |
9 |
14 |
28 |
Kentucky River |
Lock and Dam |
|
"1886" (KY.R. P-14/33); H11-K14-21; view of lock and dam showing workers on site and houses in background |
9 |
14 |
29 |
Kentucky River |
Lock and Dam |
|
"1886" (KY R P-14/32); H11-K14-20; view of lock and dam showing workers on site and houses in background |
9 |
14 |
29 |
Kentucky River |
Lock and Dam |
|
"1886" (KY R P-14/39); H11-K14-7; view of lock and dam showing workers on site, men in canoe, and houses in background |
9 |
14 |
30 |
Kentucky River |
Lock |
|
View of area near lock, showing houses across river (KY R P-14/22); H11-K14-56 |
9 |
14 |
30 |
Kentucky River |
Pier |
|
View of piers from river bank, showing workers on bank and barge (KY R P-14/29); H11-K14-4 |
9 |
14 |
31 |
Kentucky River |
Lock |
9/13/1886 |
View of lock with workers on site and houses visible in background (KY R. P-14/15); H11-K14-68 |
9 |
14 |
31 |
Kentucky River |
Beattyville Dam |
7/17/1886 |
View of Beattyville dam from one side showing houses in background (KY R. P-14/9); H11-K14-69 |
9 |
14 |
32 |
Kentucky River |
Lock |
|
View of lock area, showing houses across river (KY R P-14/23); H11-K14-57 |
10 |
14 |
1 |
Kentucky River |
Lock |
7/23/1886 |
View of lock area, showing workers on site and houses across river (KY R P-14/24); H11-K14-58 |
10 |
14 |
2 |
Kentucky River |
Dam |
|
"1886" (KY R P-14/19); H11-K14-55; view of dam from one side showing houses across river |
10 |
14 |
3 |
Kentucky River |
Lock and Dam |
|
"1886" (KY R P-14/18); H11-K14-54; view of lock and dam from bank, showing houses and barge in background |
10 |
14 |
4 |
Kentucky River |
Dam |
7/23/1886 |
View of dam from one side showing houses in background (KY R P-14/25); H11-K14-59 |
10 |
14 |
5 |
Kentucky River |
Lock |
|
"1886" (KY R P-14/28); H11-K14-60; view of dam showing workers on site and houses in background |
10 |
14 |
6 |
Kentucky River |
Pier |
|
"1886" (KY R-P-14/27); H11-K14-61; view of piers showing house in background |
10 |
14 |
7 |
Kentucky River |
Beattyville Dam |
|
"View looking downstream toward construction of Dam & Beartrap chutes in 1886; Beartraps failed same year shortly after completion and entire project was abandoned" (KY.R P-14/8); shows houses in background and man in canoe |
10 |
34 |
8 |
Ohio River/Kentucky River |
Bridge |
6/14/1938 |
"New Highway bridge Frankfort, Kentucky, from downstream"; Film No. 3-33; H45-BK-16; shot is of bridge from back of boat, showing house under bridge |
10 |
34 |
9 |
Ohio River/Kentucky River |
Tower |
|
"Tower of Shakertown High Bridge on Kentucky River"; shows ridge with tower on top |
10 |
34 |
10 |
Ohio River |
Brick Dwellings & Power House |
9/22/1924 |
"General view showing progress of construction on brick dwellings and Power-house"; OR 34 No. 198; H16-034-49; shows men sitting on roof of one dwelling amidst a row of dwellings |
10 |
34 |
10 |
Ohio River |
Dam 34 |
2/10/1934 |
"View showing ice packed against wickets in middle of river" |
10 |
34 |
10 |
Ohio River |
Dam 34 |
2/10/1934 |
"View showing wickets starting to breach"; Plate No. 13 |
10 |
34 |
10 |
Ohio River |
Dam 34 |
2/10/1934 |
"General view of ice pack"; shows men on bank and workboat "Maneuver" on river |
10 |
34 |
10 |
Ohio River |
Lock No. 34 |
9/11/1922 |
"Removal outer arm lock coffer under way; #89"; 1634-88 (on back); two canoes in shot |
10 |
34 |
10 |
Ohio River |
Lock |
|
View of construction showing workers on site; 34/91; H16-034-1 |
10 |
34 |
10 |
Ohio River |
Lock |
|
View of construction showing workers on site; 34/91; H16-034-1 |
10 |
34 |
10 |
Ohio River |
Lock |
|
View of construction showing workers on site and houses in background; 34/104; H16-034-2 |
10 |
34 |
10 |
Ohio River |
Lock |
|
View of construction showing workers on site and houses in background; 34/104; H16-034-2 |
10 |
34 |
10 |
Ohio River |
Lock & Dam No. 34 |
5/11/1949 |
"Looking upstream showing upper guide wall; File No. 22912"; H16-034-79 |
10 |
34 |
10 |
Ohio River |
Lock & Dam No. 34 |
5/11/1949 |
"Looking downstream showing damaged river wall; File No. 22913"; H16-034-78; workboat in shot |
10 |
34 |
10 |
Ohio River |
Dam 34 |
4/9/1928 |
"Rear view of power house and dwellings & grounds"; H16-034-42; houses, cars, and water tower in shot |
10 |
34 |
10 |
Ohio River |
Dam 34 |
4/9/1928 |
"Rear view of power house and dwellings & grounds"; houses, cars, and water tower in shot |
10 |
34 |
10 |
Ohio River |
Lock & Dam No. 34 |
5/12/1949 |
"Looking downstream showing lower guide wall; File No. 22921"; H16-034-76 |
10 |
34 |
10 |
Ohio River |
Lock & Dam No. 34 |
5/12/1949 |
"Looking upstream showing esplanade; File No. 22922"; H16-034-84; shot of boardwalk |
10 |
34 |
10 |
Ohio River |
Dam 34 |
9/29/1934 |
"View looking across Dam to Beat Traps" (more description included); H16-034-47 |
10 |
34 |
10 |
Ohio River |
Dam 34 |
|
View of Dam showing work boat and canoe; H16-034-44 |
10 |
34 |
10 |
Ohio River |
Lock and Dam No. 34 |
5/12/1949 |
"Looking upstream from dam axis showing river wall; File No. 22915"; H16-034-81; shows work boat |
10 |
34 |
10 |
Ohio River |
Dam 34 |
|
View of esplanade; H16-034-82 |
10 |
34 |
10 |
Ohio River |
Dam 34 |
|
View of lock; H16-034-45 |
10 |
34 |
10 |
Ohio River |
Lock and Dam No. 34 |
5/12/1949 |
"Looking downstream showing esplanade; File No. 22923"; H16-034-83 |
10 |
34 |
10 |
Ohio River |
Lock and Dam No. 34 |
5/12/1949 |
"Looking downstream showing land wall; File No. 22917"; H16-034-77 |
10 |
34 |
10 |
Ohio River |
Dam 34 |
4/9/1928 |
"View of grounds in rear of dwellings"; H16-034-43; shows water tower and houses |
10 |
34 |
10 |
Ohio River |
Dam 34 |
4/9/1928 |
"View of grounds in rear of dwellings"; shows water tower and houses |
10 |
34 |
10 |
Ohio River |
Dam 34 |
|
View of lock and dam, showing derrick, pump boat, and other work boats with people in shot; H16-034-74 |
10 |
34 |
10 |
Ohio River |
Lock and Dam No. 34 |
5/12/1949 |
"Looking landward showing section of land wall and pipe bulkhead; File No. 22918"; H16-034-80 |
10 |
34 |
10 |
Ohio River |
Lock and Dam No. 34 |
5/11/1949 |
"Looking upstream showing upper guide wall; File No. 22914"; H16-034-75 |
10 |
34 |
10 |
Ohio River |
Lock and Dam No. 34 |
7/7/1948 |
"Repairs to Wickets; View of bulkhead in place for removing wickets from dam; File No. 21672"; H16-034-86; shows worker and machinery up close |
10 |
34 |
10 |
Ohio River |
Dam 34 |
10/3/1934 |
"View from river wall looking toward Bear Traps; Left. Maneuver Boat in position to raise pass wickets; Right. Packet Boat coming up over pass"; H16-034-46 |
10 |
34 |
10 |
Ohio River |
Dam 34 |
4/29/1928 |
"Front view of dwellings"; H16-034-40; shot of houses from one side |
10 |
34 |
10 |
Ohio River |
Dam 34 |
4/29/1928 |
"Front view of dwellings"; shot of houses from one side |
10 |
34 |
10 |
Ohio River |
Dam 34 |
|
View of lock and dam with steam ships and boats around and people in shot; H16-034-3 |
10 |
34 |
10 |
Ohio River |
Dam 34 |
7/25/1924 |
"General view showing removal of Upper Guide Wall cofferdam and Dredge Indiana pumping material from coffer into Esplanade"; H16-034-4; OR 34 No. 178 |
10 |
34 |
10 |
Ohio River |
Dam 34 |
4/9/1928 |
"Rear view of power house"; H16-034-5; shows car and houses from one side |
10 |
34 |
10 |
Ohio River |
Dam 34 |
4/9/1928 |
"Rear view of power house"; H16-034-5; shows car and houses from one side |
10 |
34 |
10 |
Ohio River |
Dam 34 |
4/9/1928 |
"View in front of dwellings looking toward power house"; H16-034-41; shows person and house from one side |
10 |
34 |
10 |
Ohio River |
Dam 34 |
4/9/1928 |
"View in front of dwellings looking toward power house"; shows person and house from one side |
10 |
34 |
11 |
Ohio River |
Dam 34 |
|
View of construction showing man at work (34/94); H16-034-6 |
10 |
34 |
11 |
Ohio River |
Dam 34 |
|
View of construction showing man at work (34/94); H16-034-6 |
10 |
34 |
11 |
Ohio River |
Lock and Dam No. 34 |
11/13/1922 |
"View of completed portion of Lower Guide Wall looking up-stream"; H16-034-7; shows man and some machinery |
10 |
34 |
11 |
Ohio River |
Lock and Dam No. 34 |
|
Shows man and some machinery on construction site (34/92); H16-034-7 |
10 |
34 |
11 |
Ohio River |
Lock and Dam No. 34 |
|
Shows man and some machinery on construction site (34/92); H16-034-7 |
10 |
34 |
11 |
Ohio River |
Dam 34 |
|
View of construction showing a man and some machinery (34/90); H16-034-8 |
10 |
34 |
11 |
Ohio River |
Dam 34 |
|
View of construction showing a man and some machinery (34/90); H16-034-8 |
10 |
34 |
11 |
Ohio River |
Lock and Dam No. 34 |
11/13/1922 |
"View of lower arm of pass Coffer (first) taken from upper end of Lower Guide Wall coffer"; H16-034-9; shows steamboat "Comet" and other work boats at site |
10 |
34 |
11 |
Ohio River |
Lock and Dam No. 34 |
|
Shows steamboat "Comet" and other work boats at site (34/89); H16-034-9 |
10 |
34 |
11 |
Ohio River |
Lock and Dam No. 34 |
|
Shows steamboat "Comet" and other work boats at site (34/89); H16-034-9 |
10 |
34 |
11 |
Ohio River |
Dam 34 |
|
View of cribs, showing workboats (34/86); H16-034-10 |
10 |
34 |
11 |
Ohio River |
Dam 34 |
|
View of cribs, showing workboats (34/86); H16-034-10 |
10 |
34 |
11 |
Ohio River |
Lock and Dam No. 34 |
11/13/1922 |
"Filling pass cribs taken from River Wall" (No. 88); H16-034-11; shows workers, machinery, and workboat |
10 |
34 |
11 |
Ohio River |
Lock and Dam No. 34 |
|
Shows workers, machinery, and workboat (34/88); H16-034-11 |
10 |
34 |
11 |
Ohio River |
Lock and Dam No. 34 |
|
Shows workers, machinery, and workboat (34/88); H16-034-11 |
10 |
34 |
11 |
Ohio River |
Lock and Dam No. 34 |
11/13/1922 |
"View through Lock Chamber from lower end" (No. 85); H16-034-12; shows construction site including man, lumber, canoe, and ship in background |
10 |
34 |
11 |
Ohio River |
Lock and Dam No. 34 |
|
Shows construction site including man, lumber, canoe, and ship in background (34/85); H16-034-12 |
10 |
34 |
11 |
Ohio River |
Lock and Dam No. 34 |
|
Shows construction site including man, lumber, canoe, and ship in background (34/85); H16-034-12 |
10 |
34 |
11 |
Ohio River |
Dam No. 34 |
8/30/1921 |
"Concreting in River Wall" (No. 43); H16-034-13; men in shot |
10 |
34 |
11 |
Ohio River |
Dam No. 34 |
8/30/1921 |
"Driving Wood Piles in River Wall" (No. 42); H16-034-14; men in shot |
10 |
34 |
11 |
Ohio River |
Dam 34 |
2/10/1934 |
"Lock Chamber frozen over"; H16-034-15; shows workboat |
10 |
34 |
11 |
Ohio River |
Dam 34 |
|
View of lock when iced over with workboat in shot; H16-034-15 |
10 |
34 |
11 |
Ohio River |
Dam 34 |
2/10/1934 |
"Ice packed above wickets"; H16-034-16; Maneuver Boat in shot and house in background |
10 |
34 |
11 |
Ohio River |
Dam 34 |
4/9/1928 |
"View of water tower. Service buildings in the distance"; water tower and buildings in shot |
10 |
34 |
11 |
Ohio River |
Lock and Dam |
|
View of construction site showing machinery and man on site, smoke rising (34-102); H16-034-37 |
10 |
34 |
11 |
Ohio River |
Lock and Dam |
|
View of construction site showing machinery and man on site, smoke rising (34-102) |
10 |
34 |
11 |
Ohio River |
Lock and Dam |
|
View of construction site from one side showing machinery and man on site with smoke rising (34-99); H16-034-32 |
10 |
34 |
11 |
Ohio River |
Lock and Dam |
|
View of construction site from one side showing machinery and man on site with smoke rising (34-99) |
10 |
34 |
11 |
Ohio River |
Lock and Dam |
|
View of construction site showing machinery, men, and smoke, with houses in background (34-103); H16-034-34 |
10 |
34 |
11 |
Ohio River |
Lock and Dam |
|
View of construction site showing machinery, men, and smoke, with houses in background (34-103) |
10 |
34 |
11 |
Ohio River |
Dam 34 |
7/23/1923 |
"General view of the construction of Pass cribbing and the driving of bearing piles for Pass, from point of Axis on River Wall"; H16-034-69; shows man on site and a lot of machinery |
10 |
34 |
11 |
Ohio River |
Dam 34 |
9/8/1923 |
"General view of completed work in First Pass coffer" (No. 135); H16-034-66; shows men on construction site with a lot of machinery and smoke rising |
10 |
34 |
11 |
Ohio River |
Dam 34 |
10/10/1923 |
"Completed Upper Guide Wall" (No. 144); H16-034-62; shows men on site, machinery, and smoke rising |
10 |
34 |
11 |
Ohio River |
Lock and Dam |
6/12/1924 |
"Completed concrete floor slab for Power House" (No. 158); H16-034-58; house and dredge in background |
10 |
34 |
11 |
Ohio River |
Dam 34 |
9/9/1924 |
"Setting steel for lower leaf of Beartrap No. 1, Pier No. 1 to the left" (No. 190); H16-034-26; shows workers, materials, and machinery |
10 |
34 |
11 |
Ohio River |
Lock and Dam No. 34 |
11/13/1922 |
"General view of upper arm of 1st Pass Coffer from River Wall" (No. 87); shows workers on site and smoke rising |
10 |
34 |
11 |
Ohio River |
Lock and Dam No. 34 |
|
Shows workers on site and smoke rising (34/87); H16-034-31 |
10 |
34 |
11 |
Ohio River |
Lock and Dam No. 34 |
|
Shows workers on site and smoke rising (34/87) |
10 |
34 |
11 |
Ohio River |
Dam 34 |
8/12/1924 |
"Progress view of construction of Locktender's cottage" (No. 185); H16-034-52 |
10 |
34 |
11 |
Ohio River |
Dam 34 |
|
"Showing completion of repairs to esplanade by hand placed rip rap 1929"; H16-034-22; shows workers and workboat, with houses in background |
10 |
34 |
11 |
Ohio River |
Dam 34 |
4/9/1928 |
"View of water tower. Service buildings in the distance"; H16-034-18; shows car, water tower, and houses |
10 |
34 |
11 |
Ohio River |
Dam 34 |
9/25/1923 |
"View of completed work on Upper Guide Wall" (No. 141); H16-034-63; shows man on wall |
10 |
34 |
11 |
Ohio River |
Dam No. 34 |
8/1/1925 |
"View of upper guide wall and bank slope"; H16-034-23; shows steamship "Samuel L May" and another ship |
10 |
34 |
11 |
Ohio River |
Dam No. 34 |
8/22/1923 |
"View showing Pass masonry from turbine pit" (No. 130); H16-034-67; shows men on construction site, machinery, and smoke rising |
10 |
34 |
11 |
Ohio River |
Lock and Dam No. 34 |
11/13/1922 |
"View of completed portion of Lower Guide Wall looking down-stream" (No. 93); shows view of construction site |
10 |
34 |
11 |
Ohio River |
Lock and Dam No. 34 |
|
Shows view of construction site (34/93); H16-034-36 |
10 |
34 |
11 |
Ohio River |
Lock and Dam No. 34 |
|
Shows view of construction site (34/93) |
10 |
34 |
11 |
Ohio River |
Lock and Dam |
|
Shot of site showing lumber and workboats (34-96); H16-034-38 |
10 |
34 |
11 |
Ohio River |
Lock and Dam |
|
Shot of site showing lumber and workboats (34-96) |
10 |
34 |
11 |
Ohio River |
Dam No. 34 |
8/1/1925 |
"View of graded bank front of dwellings looking up river"; H16-034-50; shows river bank with steamships and houses visible |
10 |
34 |
11 |
Ohio River |
Dam No. 34 |
8/30/1921 |
"Driving Wood Piles in River Wall" (No. 41); H16-034-19 |
10 |
34 |
11 |
Ohio River |
Dam 34 |
7/25/1924 |
"View showing commencement of work on Power House and Dwelling No. 1" (No. 177); H16-034-54; shows men on construction site |
10 |
34 |
11 |
Ohio River |
Dam 34 |
8/12/1924 |
"Progress view of construction of Power House, showing enamelled interior walls of engine room" (No. 186); H16-034-51; shows men at work |
10 |
34 |
11 |
Ohio River |
Dam 34 |
6/2/1924 |
"Placing reinforcing for concrete floor slab of Power House" (No. 155); H16-034-61; shows men on construction site |
10 |
34 |
11 |
Ohio River |
Dam 34 |
9/25/1923 |
"Removal of 1st Pass cofferdam" (No. 138); H16-034-64; several ships and workboats in shot |
10 |
34 |
11 |
Ohio River |
Dam |
|
Shot of site from one side with machinery and workboats visible (34-98); H16-034-35 |
10 |
34 |
11 |
Ohio River |
Dam |
|
Shot of site from one side with machinery and workboats visible (34-98) |
10 |
34 |
11 |
Ohio River |
Dam No. 34 |
|
"Driving Steel Sheet Piling, Cut-off Wall, Lower Gate Track. (Driving under water with follower)"; H16-034-73; shows workers on workboat #41 |
10 |
34 |
11 |
Ohio River |
Dam 34 |
7/23/1923 |
"Construction of Upper Guide Wall Cofferdam" (No. 117); H16-034-70; ships and workboats visible |
10 |
34 |
11 |
Ohio River |
Dam No. 34 |
8/15/1923 |
"General view of Pass Coffer, Flooded" (Photo #124); H16-034-30; ships and workboats visible |
10 |
34 |
11 |
Ohio River |
Lock and Dam |
|
Shot of site taken from bank, showing ships and workboats with smoke rising (34-101); H16-034-21 |
10 |
34 |
11 |
Ohio River |
Dam 34 |
6/16/1924 |
"Close up view of harbored fleet of National Contract Co., showing extensive improvements to floating plant" (No. 164); H16-034-56; machinery and workboats in shot |
10 |
34 |
11 |
Ohio River |
Dam 34 |
9/8/1923 |
"General view of completed work in First Pass coffer" (No. 134); H16-034-29; shows workers on site with machinery and workboats visible |
10 |
34 |
11 |
Ohio River |
Dam 34 |
9/25/1923 |
"General view of work on Upper Guide Wall" (No. 137); H16-034-65; shows workboats and machinery with smoke rising |
10 |
34 |
11 |
Ohio River |
Dam 34 |
|
View of site from bank showing machinery and smoke rising (34-100); H16-034-39 |
10 |
34 |
11 |
Ohio River |
Dam 34 |
|
View of site from bank showing machinery and smoke rising (34-100) |
10 |
34 |
11 |
Ohio River |
Dam 34 |
8/5/1924 |
"General view of work in Beartrap cofferdam showing completed masonry of Pass and Chanoine Weir and masonry footing for Pier No. 1 and part of Beartrap No. 1" (No. 180); H16-034-53; shows workers on site, with workboat and machinery visible |
10 |
34 |
11 |
Ohio River |
Dam 34 |
9/8/1924 |
"View of completed Pass and Chanoine Weir" (No. 188); H16-034-25; shows workboat "National Contract Co. No. 4" and machinery |
10 |
34 |
11 |
Ohio River |
Dam 34 |
6/12/1924 |
"Completed foundation of Power House" (No. 157); H16-034-57; shows houses in background |
10 |
34 |
11 |
Ohio River |
Dam No. 34 |
|
"Steel Sheet Piling. Upper Gate Track"; H16-034-72; shows Manueuver Boat 33 and Derrick Boat 42 |
10 |
34 |
11 |
Ohio River |
Dam No. 34 |
|
"Steel Sheet Piling Cofferdam. Abutment"; H16-034-71; shows man, machinery, and workboat |
10 |
34 |
11 |
Ohio River |
Dam 34 |
6/19/1924 |
"The beginning of the 1924 working season in the Beartrap cofferdam. Photo shows damaged southern arm of coffer in the background" (No. 165); H16-034-55; men and workboat in shot |
10 |
34 |
11 |
Ohio River |
Dam 34 |
7/26/1923 |
"First section of Pass ready for concreting" (No. 121); H16-034-68; worker and machinery in shot |
10 |
34 |
11 |
Ohio River |
Dam 34 |
|
View of workers on construction site showing machinery and smoke rising (34-105); H16-034-33 |
10 |
34 |
11 |
Ohio River |
Dam 34 |
|
View of workers on construction site showing machinery and smoke rising (34-105) |
10 |
34 |
11 |
Ohio River |
Dam 34 |
6/13/1924 |
"Placing concrete for foundation of No. 1 Lockkeeper's dwelling. (This picture illustrates at close range the method of elevating concrete to top of forms.)" (No. 161); H16-034-27; shows men at work and houses in background |
10 |
34 |
11 |
Ohio River |
Dam 34 |
9/8/1923 |
"General view of completed workmin First Pass coffer" (Photo No. 136); H16-034-28; shows men at work and machinery |
10 |
34 |
11 |
Ohio River |
Dam 34 |
6/5/1924 |
"Erection of foundation forms for concrete basement of Lockkeepers' Dwelling No. 1" (No. 156); H16-034-60; shows men on site and water tower |
10 |
34 |
11 |
Ohio River |
Dam No. 34 |
8/1/1925 |
"View of roadway in rear of dwellings looking from West"; H16-034-24; nice shot of cars, houses, people, and water tower |
10 |
34 |
11 |
Ohio River |
Dam 34 |
6/12/1924 |
"Erecting foundation forms for Lockkeepers Dwelling No. 1" (No. 159); H16-034-59; house in background |
10 |
34 |
11 |
Ohio River |
Dam No. 34 |
8/1/1925 |
"General view of Dam"; Slide No. 9017-B; H16-034-48; nice shot of dam from river bank showing site and surrounding areas |
10 |
34 |
12 |
Ohio River |
Lock and Dam No. 34 |
7/7/1948 |
"Repairs to Wickets. View of bulkhead in place for removing wickets from dam; File No. 21672"; close up shot of machinery with man in background |
10 |
34 |
13 |
Ohio River |
|
|
|
10 |
35 |
14 |
Ohio River |
Dam No. 35 |
10/6/1914 |
"Upper Guide Wall-Driving sheet piling" (No. 17); H16-035-65; shows workers on site and house in background |
10 |
35 |
14 |
Ohio River |
Dam No. 35 |
8/31/1915 |
"River Wall Power-house" (No. 87); H16-035-69; shows man next to power house, and barge |
10 |
35 |
14 |
Ohio River |
Dam No. 35 |
9/26/1914 |
"Cutting into Upper Guide Cofferdam" (No. 10); H16-035-62; shows workers on site with machinery |
10 |
35 |
14 |
Ohio River |
Dam No. 35 |
10/16/1914 |
"Interior of lower recess" (No. 22); H16-035-70; shot of pit |
10 |
35 |
14 |
Ohio River |
Dam No. 35 |
7/24/1915 |
"Forms-River Wall Power-house" (No. 79); H16-035-64; shows workers next to river wall |
10 |
35 |
14 |
Ohio River |
|
|
Small image of a drain; "Ex 2" on back |
10 |
35 |
14 |
Ohio River |
Lock |
|
Small image of machinery and Manuever Boat No. 30; H16-035-34 |
10 |
35 |
14 |
Ohio River |
Lock |
|
Small image of machinery; H16-035-32 |
10 |
35 |
14 |
Ohio River |
Dam 35 |
11/2/1915 |
"Pier 3 and Bear Trap No 2" (35-103); H16-035-59; shows machinery and workboat |
10 |
35 |
14 |
Ohio River |
|
|
Small image of metal materials on the ground; H16-035-33 |
10 |
35 |
14 |
Ohio River |
Lock |
|
Small image of metal being lifted; H16-035-30 |
10 |
35 |
14 |
Ohio River |
Dam 35 |
11/25/1931 |
"Tile, Traveling"; H16-035-56; small image of men on construction site |
10 |
35 |
14 |
Ohio River |
Dam 35 |
11/25/1931 |
"Lowering tile"; H16-035-58; small image of men during construction |
10 |
35 |
14 |
Ohio River |
Dam 35 |
11/25/1931 |
"Turn-around Looking West"; H16-035-29; small image of fence |
10 |
35 |
14 |
Ohio River |
Dam 35 |
11/25/1931 |
"Hauling 36" tile on sled, 3300 lbs"; H16-035-53; small image of house and machinery on hill |
10 |
35 |
14 |
Ohio River |
Dam 35 |
11/25/1931 |
"Front Wall, Looking West"; H16-035-27; small image of fence, water tower, and houses up hill |
10 |
35 |
14 |
Ohio River |
Dam 35 |
11/25/1931 |
"Front Bank Looking East"; H16-35-28; small image of workers around bank with water tower in background |
10 |
35 |
14 |
Ohio River |
Dam 35 |
11/25/1931 |
"Front Wall, Looking East"; H16-035-54; small image of fence with houses visible |
10 |
35 |
14 |
Ohio River |
Dam 35 |
11/25/1931 |
"Front Bank Looking South"; H16-035-57; small image of bank with workers on it |
10 |
35 |
14 |
Ohio River |
Dam 35 |
11/25/1931 |
"Placing tile"; H16-035-55; small image of workers during construction |
10 |
35 |
14 |
Ohio River |
Building |
|
"1930"; H16-035-60; photo of workers in front of house being constructed |
10 |
35 |
14 |
Ohio River |
Power House |
|
Photo of workers constructing power house; H16-035-78 |
10 |
35 |
14 |
Ohio River |
Dam No. 35 |
8/15/1921 |
"Power House" (120); H16-035-74; shot of power house during construction process with houses visible |
10 |
35 |
14 |
Ohio River |
|
|
Small image of metal on ground with water tower, man, and building visible in background; H16-035-31 |
10 |
35 |
14 |
Ohio River |
Dam No. 35 |
10/22/1914 |
"Driving sheet piling - lower guide wall" (No. 25); H16-035-67; smoky image of construction site with men and machinery visible |
10 |
35 |
14 |
Ohio River |
Dam No. 35 |
8/9/1915 |
"Reinforcement - Roof of River Wall Power-house" (No. 82); H16-035-79; shows several men at work with workboats in background |
10 |
35 |
14 |
Ohio River |
Dam 35 |
9/27/1921 |
"Power House" (132); H16-035-72; men visible near power house being constructed |
10 |
35 |
14 |
Ohio River |
Dam No. 35 |
10/16/1914 |
"Driving piling - lower guide wall" (No. 21); H16-035-66; shows barge, workers, and machinery on site |
10 |
35 |
14 |
Ohio River |
Dam No. 35 |
8/18/1921 |
"Lock Tenders Dwellings" (123); H15-035-76; shows two houses on hill |
10 |
35 |
14 |
Ohio River |
Dam No. 35 |
8/24/1915 |
"General View" (No. 85); shows construction site facing river, with machinery, workboat, and raft visible |
10 |
35 |
14 |
Ohio River |
Dam No. 35 |
|
Shows construction site facing river, with machinery, workboat, and raft visible (35-85); H16-035-82 |
10 |
35 |
14 |
Ohio River |
Dam No. 35 |
8/15/1921 |
"Power House" (119); H16-035-73; shows workers near power house during construction process |
10 |
35 |
14 |
Ohio River |
Dam 35 |
|
General view of construction site facing river, with machinery, workboats, and materials visible (35-80) |
10 |
35 |
14 |
Ohio River |
Dam No. 35 |
8/3/1915 |
"General view - Bear Trap cofferdam"; H16-035-83; shows construction site facing river, with machinery, workboats, and materials visible |
10 |
35 |
14 |
Ohio River |
Dam No. 35 |
9/28/1914 |
"Upper Guide Wall cofferdam pumped out" (No. 12); H16-035-80; house visible on hill on right |
10 |
35 |
14 |
Ohio River |
Dam No. 35 |
9/26/1914 |
"Upper Guide Wall Cofferdam" (No. 9); H16-035-81 |
10 |
35 |
14 |
Ohio River |
Dam No. 35 |
8/25/1915 |
"Filling bear trap cribs" (No. 86); H16-035-68; men and workboats in image |
10 |
35 |
14 |
Ohio River |
Dam No. 35 |
8/15/1921 |
"Power House" (121); H16-035-77; shows workers on power house during construction process |
10 |
35 |
14 |
Ohio River |
Dam No. 35 |
8/18/1921 |
"Lock Tenders Dwellings" (124); H16-035-75; shows two houses on hill |
10 |
35 |
14 |
Ohio River |
Dam No. 35 - Rock Fill & Slope Treatment |
12/8/1942 |
"View downstream - Rock fill sections 1 & 2"; H16-035-98; shows water tower and houses on hill |
10 |
35 |
14 |
Ohio River |
Dam No. 35 - Rock Fill & Slope Treatment |
12/8/1942 |
"View from State Highway - Concrete open box spillway between rock fill sections 1 & 2"; H16-036-99 |
10 |
35 |
14 |
Ohio River |
Dam No. 35 - Rock Fill & Slope Treatment |
12/8/1942 |
"View from State Highway downstream. Rock fill section No. 2"; H16-035-100; water tower and house just visible over hill |
10 |
35 |
14 |
Ohio River |
Dam No. 35 - Rock Fill & Slope Treatment |
12/8/1942 |
"View from access road upstream. Rock fill section No. 1"; H16-035-101; shot down hill facing river with houses visible in background |
10 |
35 |
14 |
Ohio River |
Dam No. 35 - Rock Fill & Slope Treatment |
12/8/1942 |
"View from access road upstream. Rock fill section No. 1"; H16-035-102; houses visible on right side |
10 |
35 |
14 |
Ohio River |
Dam No. 35 - Rock Fill & Slope Treatment |
12/8/1942 |
"View from access road downstream. Rock fill section No. 3"; H16-035-103; houses visible on left side |
10 |
35 |
14 |
Ohio River |
Dam No. 35 - Rock Fill & Slope Treatment |
12/8/1942 |
"View from access road downstream. Rock fill section No. 3 and access road"; H16-035-104; houses visible in shot |
10 |
35 |
14 |
Ohio River |
Dam No. 35 - Rock Fill & Slope Treatment |
12/8/1942 |
"View from access road downstream. Metal ditch below rock fill section #3" |
10 |
35 |
14 |
Ohio River |
Dam No. 35 - Rock Fill & Slope Treatment |
12/8/1942 |
"View from service road downstream. Rock fill section No. 3"; H16-035-105; houses visible in background |
10 |
35 |
14 |
Ohio River |
Dam No. 35 - Rock Fill & Slope Treatment |
12/8/1942 |
"View from service road upstream. Rock fill section No. 3"; H16-035-106; people and houses visible |
10 |
35 |
14 |
Ohio River |
Dam No. 35 - Rock Fill & Slope Treatment |
12/8/1942 |
"View from service road upstream. Service and access roads"; H16-035-107; car visible in background |
10 |
35 |
14 |
Ohio River |
Dam No. 35 - Rock Fill & Slope Treatment |
12/8/1942 |
"View from State Highway upstream. Rock fill sections Nos. 2 & 1"; H16-035-108; water tower and houses visible at top of hill |
10 |
35 |
14 |
Ohio River |
Dam 35 |
|
View of dam section showing some pipes |
10 |
35 |
15 |
Ohio River |
Dam No. 35 |
7/24/1915 |
"Grading esplanade" (No. 78); H16-035-71; shows men and machinery on site |
10 |
35 |
15 |
Ohio River |
Lock and Dam No. 35 |
5/12/1949 |
"Looking upstream showing esplanade; File No. 22925"; H16-035-96; steamship in shot |
10 |
35 |
15 |
Ohio River |
Lock and Dam No. 35 |
5/12/1949 |
"Looking upstream showing river wall; File No. 22926"; H16-035-89; steamship in shot |
10 |
35 |
15 |
Ohio River |
Lock and Dam No. 35 |
5/12/1949 |
"Looking upstream showing land wall; File No. 22931"; H16-035-93 |
10 |
35 |
15 |
Ohio River |
Dam 35 |
2/26/1934 |
"View of pass"; H16-035-87; shows river during winter |
10 |
35 |
15 |
Ohio River |
Lock and Dam No. 35 |
5/11/1949 |
"Looking downstream showing lower guide wall; File No. 22933"; H16-035-92; man and steamship in shot |
10 |
35 |
15 |
Ohio River |
Embankment |
|
Shot of men working on embankment; H16-035-84 |
10 |
35 |
15 |
Ohio River |
Embankment |
|
Shot of men working on embankment |
10 |
35 |
15 |
Ohio River |
Embankment |
|
Shot of men working on embankment |
10 |
35 |
15 |
Ohio River |
Lock and Dam 35 |
10/29/1946 |
"Beartrap, looking downstream"; H16-035-129 |
10 |
35 |
15 |
Ohio River |
|
|
Up close shot of construction materials; H16-035-85 |
10 |
35 |
15 |
Ohio River |
|
|
Up close shot of construction materials |
10 |
35 |
15 |
Ohio River |
|
|
Up close shot of construction materials |
10 |
35 |
15 |
Ohio River |
Dam 35 |
2/26/1934 |
"Ice packed in upper gate"; H16-035-88; shows site in winter |
10 |
35 |
15 |
Ohio River |
Dam 35 |
2/26/1934 |
"Looking upstream"; H16-035-86; shows river in winter |
10 |
35 |
15 |
Ohio River |
Dam 35 |
|
Shot looking upstream at river during winter |
10 |
35 |
15 |
Ohio River |
Dam No. 35 |
10/8/1914 |
"Concreting monolith in upper Guide Wall" (No. 18); H16-035-61; shows workers on guide wall and site |
10 |
35 |
15 |
Ohio River |
Lock |
|
General view of lock during construction process, showing workers and raft in shot; H16-035-63 |
10 |
35 |
15 |
Ohio River |
Lock and Dam No. 35 |
5/12/1949 |
"Looking upstream showing bank slope and riprap for roadway to esplanade; File No. 22924"; H16-035-91; water tower visible in background |
10 |
35 |
15 |
Ohio River |
Lock and Dam No. 35 |
5/12/1949 |
"Looking riverward showing lower gate recess miter; File No. 22928"; H16-035-95 |
10 |
35 |
15 |
Ohio River |
Lock and Dam No. 35 |
5/12/1949 |
"Looking upstream showing upper guide wall; File No. 22930"; H16-035-94 |
10 |
35 |
15 |
Ohio River |
Lock and Dam 35 |
10/29/1946 |
"Beartrap in lowered position"; H16-035-128; blurry close up shot |
10 |
35 |
15 |
Ohio River |
Lock and Dam |
9/5/1961 |
Aerial view of lock and dam showing surrounding area, including houses and cars (160); H16-035-97 |
10 |
35 |
15 |
Ohio River |
Lock and Dam No. 35 |
5/12/1949 |
"Looking downstream showing river wall; File No. 22927"; H16-035-90 |
10 |
35 |
15 |
Ohio River |
Lock and Dam No. 35 |
5/12/1949 |
"Looking downstream from dam axis showing river wall; File No. 22916"; H16-035-85 |
10 |
35 |
15 |
Ohio River |
Lock and Dam 35 |
10/29/1946 |
"Beartrap in raised position"; H16-035-127; blurry close up shot |
10 |
35 |
15 |
Ohio River |
Embankment |
|
Shot of men working on embankment (1635-132) |
10 |
35 |
15 |
Ohio River |
Lock and Dam |
|
Shot of site taken from bank, showing guide wall, workboat, and steamboat; H16-035-1 |
10 |
35 |
15 |
Ohio River |
Dam No. 35 |
9/26/1914 |
"Lower Guide wall cofferdam" (No. 8); H16-035-2; shows man and workboat in shot |
10 |
35 |
15 |
Ohio River |
Dam No. 35 |
10/2/1914 |
"Upper Guide Wall - Driving piling" (No. 13); H16-035-3; shows man and machinery on site |
10 |
35 |
15 |
Ohio River |
Dam No. 35 |
10/16/1914 |
"Repairing damaged monolith in lower recess" (No. 19); H16-035-4; shows workers hanging from wall during repair process |
10 |
35 |
15 |
Ohio River |
Dam No. 35 |
10/16/1914 |
"Concreting monolith in upper guide wall" (No. 20); H16-035-5; shows workers standing on guide wall and on site |
10 |
35 |
15 |
Ohio River |
Dam No. 35 |
10/21/1914 |
"Upper recess - completed" (No. 23); H16-035-6 |
10 |
35 |
15 |
Ohio River |
Dam No. 35 |
|
Shows completed upper recess from above (35-23); H16-035-6 |
10 |
35 |
15 |
Ohio River |
Dam No. 35 |
|
Shows completed upper recess from above (35-23); H16-035-6 |
10 |
35 |
15 |
Ohio River |
Dam No. 35 |
10/21/1914 |
"Concreting end monolith - upper guide wall" (No. 24); H16-035-7; shows workers on site and houses in background |
10 |
35 |
15 |
Ohio River |
Dam No. 35 |
6/17/1915 |
"Driving sheet piling Nav. Pass" (No. 64); H16-035-8; shows workers, machinery, and smoke rising |
10 |
35 |
15 |
Ohio River |
Dam No. 35 |
6/25/1915 |
"Concreting monolith - Nav. Pass" (No. 67); H16-035-9; shows machinery and workers during construction process |
10 |
35 |
15 |
Ohio River |
Dam No. 35 |
9/27/1921 |
"Power House" (131); H16-035-14; shows men working on construction of power house |
10 |
35 |
15 |
Ohio River |
Dam No. 35 |
7/17/1915 |
"Rip-rap below cribs. Nav. Pass" (No. 76); H16-035-10; shows men at work on site |
10 |
35 |
15 |
Ohio River |
Dam No. 35 |
9/15/1915 |
"Sheet piling Nav. Pass" (No. 90); H16-035-11; shows men at work, machinery, and workboat |
10 |
35 |
15 |
Ohio River |
Lock 35 |
|
Lock during construction process, shows men on site and machinery (35-100); H16-035-12 |
10 |
35 |
15 |
Ohio River |
Dam No. 35 |
8/15/1921 |
"Power House" (122); H16-035-13; shows man on power house during construction process |
10 |
35 |
15 |
Ohio River |
Dam 35 |
2/26/1934 |
"Ice packed in upper gate"; H16-035-16; shows site during winter |
10 |
35 |
15 |
Ohio River |
Dam 35 |
|
Shows ice on site and river during winter; H16-035-16 |
10 |
35 |
15 |
Ohio River |
Lock and Dam No. 35 |
5/12/1949 |
"Looking downstream showing land wall; File No. 22932"; H16-035-17; steamship visible in background |
10 |
35 |
15 |
Ohio River |
Embankment |
|
Shows men working on embankment with water tower and houses visible in background |
10 |
36 |
16 |
Ohio River |
Lock and Dam No. 36 |
10/19/1926 |
"Washout in Esplanade Fill: View downstream from Axis of Dam at Land Wall of Lock"; houses visible in background |
10 |
36 |
16 |
Ohio River |
Lock and Dam No. 36 |
|
View of dirt and concrete with houses visible in background |
10 |
36 |
16 |
Ohio River |
Lock and Dam No. 36 |
10/19/1926 |
"Washout in Esplanada Fill: View upstream from Axis of Dam at Land Wall of Lock"; house and water tower visible in background |
10 |
36 |
16 |
Ohio River |
Lock and Dam No. 36 |
|
View of dirt and concrete with house and water tower visible in background |
10 |
36 |
16 |
Ohio River |
Lock and Dam No. 36 |
10/19/1926 |
"Washouts in Esplanade Fill. View from Lock Dwellings Terrace"; workboats and roller coaster visible in background |
10 |
36 |
16 |
Ohio River |
Lock and Dam No. 36 |
|
View of dirt and river with workboats and roller coaster visible in background |
10 |
36 |
16 |
Ohio River |
Lock and Dam No. 36 |
10/19/1926 |
"Esplanade: View upstream from extreme lower end of lock"; workboat and house visible in background |
10 |
36 |
16 |
Ohio River |
Lock and Dam No. 36 |
|
View of dirt and river with workboat and house visible in background |
10 |
36 |
16 |
Ohio River |
Lock and Dam No. 36 |
10/19/1926 |
"Washout in Esplanade Fill at extreme Upper End: View upstream from Lock Dwellings Terrace" |
10 |
36 |
16 |
Ohio River |
Lock and Dam No. 36 |
|
View of dirt and river during washout |
10 |
36 |
16 |
Ohio River |
Lock and Dam No. 36 |
10/19/1926 |
"Washout in Esplanade Fill at extreme Upper End. View downstream from Upper Guide Wall"; houses and water tower visible in background |
10 |
36 |
16 |
Ohio River |
Lock and Dam No. 36 |
|
View of dirt and river with houses and water tower visible in background |
10 |
36 |
16 |
Ohio River |
Dam 36 |
2/26/1934 |
"Steamer "Kentucky" removing Beartrap Equipment"; shows steamship, roller coaster, and houses in background |
10 |
36 |
16 |
Ohio River |
Dam 36 |
2/26/1934 |
"Steamer "Kentucky" removing Beartrap Equipment"; shows steamship, roller coaster, and houses in background |
10 |
36 |
16 |
Ohio River |
Dam 36 |
2/26/1934 |
"Entrance of lock chamber blocked with ice"; workboat visible in background |
10 |
36 |
16 |
Ohio River |
Lock and Dam No. 36 |
5/13/1949 |
"Looking upstream showing upper guide wall; File No. 22938"; H16-036-68; house visible in background |
10 |
36 |
16 |
Ohio River |
Lock and Dam No. 36 |
5/13/1949 |
"Looking downstream showing land wall; File No. 22939"; H16-036-69; truck and workboat visible |
10 |
36 |
16 |
Ohio River |
Lock and Dam No. 36 |
5/13/1949 |
"Looking downstream showing lower guide wall; File No. 22943"; H16-036-70; workboat in shot |
10 |
36 |
16 |
Ohio River |
Dam 36 |
|
Shot of bear traps and machinery with worker in shot (36B/139); H16-036-38 |
10 |
36 |
16 |
Ohio River |
Dam 36 |
|
Shot of bear traps and machinery with worker in shot (36B/139) |
10 |
36 |
16 |
Ohio River |
Lock and Dam No. 36 |
5/11/1949 |
"Looking leeward showing pipe trench; File No. 22935"; H16-036-66; man in background |
10 |
36 |
16 |
Ohio River |
Lock and Dam No. 36 |
5/13/1949 |
"Looking upstream showing esplanade and pipe trench; File No. 22945"; H16-036-62; water tower visible in background |
10 |
36 |
16 |
Ohio River |
Lock and Dam No. 36 |
5/13/1949 |
"Looking riverward showing ramp to esplanade; File No. 22946"; H16-036-64; workboat, truck, and roller coaster visible in background |
10 |
36 |
16 |
Ohio River |
Lock and Dam No. 36 |
5/13/1949 |
"Looking upstream showing river wall; File No. 22944"; H16-036-63 |
10 |
36 |
16 |
Ohio River |
Lock and Dam No. 36 |
5/13/1949 |
"Looking downstream showing river wall; File No. 22937"; H16-036-67; roller coaster barely visible in background |
10 |
36 |
16 |
Ohio River |
Lock and Dam No. 36 |
5/19/1949 |
"Looking downstream showing lower section of esplanade; File No. 22973"; H16-036-65 |
10 |
36 |
16 |
Ohio River |
Lock and Dam No. 36 |
5/13/1949 |
"Looking upstream from dam axis showing upper river wall; File No. 22940"; H16-036-61 |
10 |
36 |
16 |
Ohio River |
Dam 36 |
|
"June 1929; Raising Lock House"; close up shot of lock house being lifted |
10 |
36 |
16 |
Ohio River |
Dam 36 |
|
Close up shot of lock house being lifted; H16-036-23 |
10 |
36 |
16 |
Ohio River |
Dam 36 |
|
"June 1929; Raising Lock House"; shows whole lock house being lifted with workers in shot |
10 |
36 |
16 |
Ohio River |
Dam 36 |
|
Shows whole lock house being lifted with workers in shot; H16-036-24 |
10 |
36 |
16 |
Ohio River |
Dam 36 |
|
"June 1929; Raising Lock House"; shows whole lock house being lifted |
10 |
36 |
16 |
Ohio River |
Dam 36 |
|
Shows whole lock house being lifted; H16-036-25 |
10 |
36 |
16 |
Ohio River |
Dam 36 |
|
"June 1929; Raising Lock House"; H16-036-26; shows lock house being lifted, with workers, car, and part of water tower in shot |
10 |
36 |
16 |
Ohio River |
Lock and Dam |
|
General view of lock and dam area with roller coaster, workboats, houses, and machinery visible (35-152); H16-036-27 |
10 |
36 |
16 |
Ohio River |
Dam No. 36 |
11/19/1922 |
"B.T.'s General View, Down-stream Side; Bear Traps" (Photo No. 144); H16-036-28; man and workboat in shot |
10 |
36 |
16 |
Ohio River |
Dam No. 36 |
11/26/1922 |
"Placing Riprap above B.T. No. 2; Bear Traps" (Photo No. 149); H16-036-29; close up blurry shot showing bear traps and workers |
10 |
36 |
16 |
Ohio River |
Dam No. 36 |
11/26/1922 |
"B.T. No. 2, Lower Lead, All bottom plates bolted in place; Bear Traps" (Photo No. 150); H16-036-30; close up shot of bear traps |
10 |
36 |
16 |
Ohio River |
Dam No. 36 |
9/11/1922 |
"Mixer Plant; Bear Traps" (Photo No. 37); H16-036-31; men and Derrick Boat No. 48 in shot |
10 |
36 |
16 |
Ohio River |
Dam No. 36 |
7/30/1924 |
"Forms for land wall Monolith" (153); H16-036-32; shows men at work |
10 |
36 |
16 |
Ohio River |
Dam No. 36 |
7/30/1924 |
"Concrete Mixer set ready to pour Land Wall Monolith" (154); H16-036-33; workers, workboat, and machinery in shot |
10 |
36 |
16 |
Ohio River |
Dam 36 |
|
View of buildings in dam area during construction process (36-103); H16-036-34 |
10 |
36 |
16 |
Ohio River |
Dam No. 36 |
9/26/1922 |
"Dyke and Bar, from upper arm of coffer; Bear Traps" (Photo No. 49); H16-036-35; boat visible in background |
10 |
36 |
16 |
Ohio River |
Dam 36 |
|
General shot showing bear traps, buildings, traintracks, smoke, and machinery (36-99); H16-036-36 |
10 |
36 |
16 |
Ohio River |
Dam No. 36 |
11/7/1922 |
"General view of Bear Traps" (Photo No. 111); H16-036-37; shows workers, bear traps, and machinery |
10 |
36 |
16 |
Ohio River |
Lock and Dam No. 36 |
5/13/1949 |
"Looking upstream showing land wall; File No. 22942"; H16-036-60; car, water towers, and house in shot |
10 |
36 |
16 |
Ohio River |
Dam No. 36 |
9/3/1922 |
"Coffer flooded, Mixing plant; Bear Traps" (Photo No. 35); H16-036-1; two structures in shot |
10 |
36 |
16 |
Ohio River |
Dam 36 |
|
General view of site, showing workers, Derrick Boat 48, structures, machinery, and smoke; H16-036-2 |
10 |
36 |
16 |
Ohio River |
Dam 36 |
|
General view of site, showing workers, Derrick Boat 48, structures, machinery, and smoke; H16-036-2 |
10 |
36 |
16 |
Ohio River |
Dam No. 36 |
10/18/1922 |
"Pouring middle section, Pier No. 2; Bear Traps" (Photo No. 77); H16-036-3 |
10 |
36 |
16 |
Ohio River |
Dam No. 36 |
10/19/1922 |
"Driving wood, Bear Trap No. 2" (Photo No. 78); H16-036-4; shows workers, machinery, and Derrick Boat 48 |
10 |
36 |
16 |
Ohio River |
Dam No. 36 |
8/8/1922 |
"Showing Portion of Men Who Receive Subsistence Noon Hour; Lock Side" (#87); H16-036-5; shows workers, water tower, and houses |
10 |
36 |
16 |
Ohio River |
Dam 36 |
|
General view of construction area, showing train, machinery, and workers (36-90); H16-036-6 |
10 |
36 |
16 |
Ohio River |
Dam 36 |
|
General view of area buildings, bear traps, workers, rail line, and machinery, with ships visible in background (36-91); H16-036-7 |
10 |
36 |
16 |
Ohio River |
Dam 36 |
|
General view of buildings, train tracks, train engine, machinery, and workers (36-96); H16-038-8 |
10 |
36 |
16 |
Ohio River |
Dam 36 |
|
General view of buildings, train tracks, train engine, machinery, and workers; H16-038-8 |
10 |
36 |
16 |
Ohio River |
Dam No. 36 |
11/2/1922 |
"Pouring last section lower pedestal, Bear Trap No. 2; Bear Traps" (Photo No. 106); H16-036-9; shows workers and machinery |
10 |
36 |
16 |
Ohio River |
Dam No. 36 |
11/4/1922 |
"Pouring last section Pier No. 3; Bear Traps" (Photo No. 107); H16-036-10; shows workers and machinery |
10 |
36 |
16 |
Ohio River |
Dam No. 36 |
11/6/1922 |
"Decking Crib No. 1; building tail-race No. 1 form; riveting headers; Bear Traps" (Photo No. 108); H16-036-11; shows workers and machinery |
10 |
36 |
16 |
Ohio River |
Dam No. 36 |
11/6/1922 |
"Building form, Tail-race No. 2; Bear Traps" (Photo No. 109); H16-036-12; shows workers, machinery, and shack |
10 |
36 |
16 |
Ohio River |
Dam No. 36 |
11/6/1922 |
"Bear Trap No. 2, lower pedestal" (Photo No. 110); H16-036-13; shows workers and machinery |
10 |
36 |
16 |
Ohio River |
Dam No. 36 |
11/7/1922 |
"Finishing tail-race, Pier No. 2; Decking Crib No. 2; Bear Traps" (Photo No. 112); H16-036-14; shows workers, machinery, and shack |
10 |
36 |
16 |
Ohio River |
Dam No. 36 |
11/17/1922 |
"B.T. No. 2, Lower Leaf, Raising Girders and Placing Headers; Bear Traps" (Photo No. 140); H16-036-15; shows men, machinery, and shack |
10 |
36 |
16 |
Ohio River |
Dam No. 36 |
11/19/1922 |
"B.T. No. 1, Upper Leaf; Bear Traps" (Photo No. 142); H16-036-16; shows machinery, snag boat, and roller coaster in background |
10 |
36 |
16 |
Ohio River |
Dam No. 36 |
11/19/1922 |
"B.T. No. 2, Lower Leaf; Bear Traps" (Photo No. 143); H16-036-17; shows metal up close, and workers in background |
10 |
36 |
16 |
Ohio River |
Dam 36 |
2/26/1934 |
"Plant used in opening miter gates"; H16-036-19; shows men and workboats on site in winter |
10 |
36 |
16 |
Ohio River |
Lock and Dam No. 36 |
7/15/1938 |
"Lockkeepers' House (Left) Lockkeepers' Double House (Right); Rear View; Contract No. W203 eng. 1052; Lewis James Whitney, Contractor"; H16-036-20; shows two houses, men working on one, and cars out front |
10 |
36 |
16 |
Ohio River |
Lock and Dam No. 36 |
9/16/1938 |
"Lockkeepers' Double House - Rear View. No. W203eng-1052. Lewis James Whitney, Contractor" (22806); H16-036-21; shows house with people out front |
10 |
36 |
16 |
Ohio River |
Lock and Dam No. 36 |
5/11/1949 |
"Looking downstream showing esplanade and pipe trench; File No. 22936"; H16-036-22; shows men in foreground and truck in background |
10 |
36 |
16 |
Ohio River |
Power House |
|
Close up shot of power house with sign, "U.S. Lock 36"; H16-036-75 |
10 |
37 |
17 |
Ohio River |
Dam 37 |
10/20/1935 |
"Lifting coffer from esplanade"; H16-037-75; shows steamships, cars, and people on site |
10 |
37 |
17 |
Ohio River |
Dam #37 |
|
"Repairs to Bear Trap No. 2 & 3. Position in which Bear Traps were found. Broken and bent hinge plates and deposits found under plates of lower leaves"; H16-037-56; close up shot of metal and materials |
10 |
37 |
17 |
Ohio River |
Dam 37 |
2/9/1934 |
"Maneuver boat frozen in ice against wickets. Derrickboat from Marine Ways breaking ice and throwing over dam" |
10 |
37 |
17 |
Ohio River |
Dam 37 |
|
Shot of river during winter with Maneuver boat and Derrick boat pictured |
10 |
37 |
17 |
Ohio River |
Dam 37 |
|
Shot of river during winter with Maneuver boat and Derrick boat pictured |
10 |
37 |
17 |
Ohio River |
Dam 37 |
|
Shot of river during winter with Maneuver boat and Derrick boat pictured |
10 |
37 |
17 |
Ohio River |
Lock and Dam |
|
Aerial view of lock and dam showing surrounding areas including houses |
10 |
37 |
18 |
Ohio River |
Workboat |
|
Image of workboat with machinery in background; H16-037-1 |
10 |
37 |
18 |
Ohio River |
Workboat |
|
Image of workboat with men on it, and machinery visible in background; H16-037-2 |
10 |
37 |
19 |
Ohio River |
Workboat |
|
Image of workboat with men on it, and machinery visible in background; H16-037-2 |
10 |
37 |
20 |
Ohio River |
Dam 37 |
7/3/1927 |
"Filling Upper Arm Of Coffer - Bear Trap #1" (B-10); H16-037-4; man in shot |
10 |
37 |
20 |
Ohio River |
Dam 37 |
7/9/1927 |
"Lower Arm Of Coffer In Place - Bear Trap #1" (B-11); H16-037-5; worker and workboats in shot |
10 |
37 |
20 |
Ohio River |
Dam 37 |
7/16/1927 |
"Removing Deposit From Lower Leaf - Bear Trap #1" (B-12); H16-037-6; shows workers in pit and machinery |
10 |
37 |
20 |
Ohio River |
Dam 37 |
7/18/1927 |
"Removing Deposit From Lower Leaf - Bear Trap #1" (B-13); H16-037-7; shows workers in pit |
10 |
37 |
20 |
Ohio River |
Dam 37 |
7/22/1927 |
"Raising Upper Leaf - Bear Trap #1" (B-14); H16-037-8; shows men at work |
10 |
37 |
20 |
Ohio River |
Dam 37 |
7/22/1927 |
"Raising Upper Leaf - Bear Trap #1" (B-15); H16-037-9; shows men at work |
10 |
37 |
20 |
Ohio River |
Dam 37 |
7/25/1927 |
"Repairing Upper Leaf Trap #1" (B-16); H16-037-10; shows men at work |
10 |
37 |
20 |
Ohio River |
Dam 37 |
6/29/1927 |
"Placing Upper Arm Of Coffer - Bear Trap #1" (B-17); H16-037-11; shows workers and workboats |
10 |
37 |
20 |
Ohio River |
Dam 37 |
6/29/1927 |
"Upper Arm of Coffer In Place - Bear Trap #1" (B-18); H16-037-12; shows workers and workboats |
10 |
37 |
20 |
Ohio River |
Dam 37 |
6/30/1927 |
"Sheeting Upper Arm Of Coffer. Bear Trap #1" (B-19); H16-037-13; shows men at work and houses in background |
10 |
37 |
20 |
Ohio River |
Dam 37 |
6/30/1927 |
"Sheeting Upper Arm Of Coffer. Bear Trap #1" (B-20); H16-037-14; shows men at work |
10 |
37 |
20 |
Ohio River |
Dam 37 |
5/28/1930 |
"Repairs to Bear Traps No. 2 & 3. (2) - 8" Pumps in operation. Showing cement mortar placed in cracks of Decking of upper leaf."; H16-037-15; shows man next to machinery |
10 |
37 |
20 |
Ohio River |
Dam 37 |
5/17/1930 |
"Repairs to Bear Traps No. 2 & 3. Cofferdam Construction"; H16-037-16; shows men at work and houses in background |
10 |
37 |
20 |
Ohio River |
Dam 37 |
5/28/1930 |
"Repairs to Bear Traps No. 2 & 3. Bear Traps No. 2 lowered in place. Showing new hinge plates with hand hole covers on top"; H16-037-17; men in shot |
10 |
37 |
20 |
Ohio River |
Dam 37 |
5/27/1930 |
"Repairing broken section of abutment wall"; H16-037-18; shows men at work |
10 |
37 |
20 |
Ohio River |
Dam 37 |
5/25/1930 |
"Showing Sump hole and broken section of rock foundation below Bear Trap No. 3"; H16-037-19; shows men at work |
10 |
37 |
20 |
Ohio River |
Dam 37 |
5/25/1930 |
"Repairs to Bear Traps No. 2 & 3. General arrangement of Steam and Water lines and other equipment"; H16-037-20; shows men at work, and machinery |
10 |
37 |
21 |
Ohio River |
Dam No. 37 |
6/7/1933 |
"Lower Gate; Lifting old gate. Note list of hoist. A few minutes later it started to sink by the front end" (No. 14); H16-037-37; men in shot |
10 |
37 |
21 |
Ohio River |
Dam No. 37 |
6/7/1933 |
"Lower Gate; Lifting old gate. Note list of hoist. A few minutes later it started to sink by the front end" (No. 14); H16-037-37; men in shot |
10 |
37 |
21 |
Ohio River |
Dam No. 37 |
6/7/1933 |
"Lower Gate; Gate lowered back into water. Mud being washed off" (No. 15); H16-037-38; shows people, cars, work boats and a steamship |
10 |
37 |
21 |
Ohio River |
Dam No. 37 |
6/7/1933 |
"Lower Gate; Hoists with gate lifted clear of lock wall and floating out of lock chamber" (No. 16); H16-037-39; shows people, cars, machinery, workboats, and tail end of steamship |
10 |
37 |
21 |
Ohio River |
Dam No. 37 |
6/7/1933 |
"Lower Gate; Gate lowered to lock wall" (No. 17); H16-037-40A; shows people on shore, with workboat and houses visible in background |
10 |
37 |
21 |
Ohio River |
Dam No. 37 |
6/7/1933 |
"Lower Gate; Gate lowered to lock wall" (No. 17); H16-037-40B; shows people on shore, with workboat and houses visible in background |
10 |
37 |
21 |
Ohio River |
Dam No. 37 |
6/7/1933 |
"Lower Gate; New gate being placed into position-held steady by derrickboat" (No. 18); H16-037-41A; shows workboats, cars, people, and machinery, with houses visible in background |
10 |
37 |
21 |
Ohio River |
Dam No. 37 |
6/7/1933 |
"Lower Gate; New gate being placed into position-held steady by derrickboat" (No. 18); H16-037-41B; shows workboats, cars, people, and machinery, with houses visible in background |
10 |
37 |
21 |
Ohio River |
Dam No. 37 |
6/7/1933 |
"Lower Gate; New gate in position. Note list of barge" (No. 19); H16-037-42; shows cars, workboats, people, and machinery, with houses visible in background |
10 |
37 |
21 |
Ohio River |
Lock No. 37 |
6/7/1933 |
"Installing new rolling gates. New lower gate lifted clear and barge being removed" (No. 5); H16-037-43A; shows people, smoke, cars, workboats, machinery, and steamship |
10 |
37 |
21 |
Ohio River |
Lock No. 37 |
6/7/1933 |
"Installing new rolling gates. New lower gate lifted clear and barge being removed" (No. 20); H16-037-43B; shows people, smoke, cars, workboats, machinery, and steamship |
10 |
37 |
21 |
Ohio River |
Lock No. 37 |
|
Image of cars, people, workboats, machinery, and steamships with a lot of smoke; H16-037-43C |
10 |
37 |
21 |
Ohio River |
Dam No. 37 |
6/7/1933 |
"Lower Gate; Lowering new gate" (No. 21); H16-037-44; shows cars, people, workboats, steamship, and machinery |
10 |
37 |
21 |
Ohio River |
Dam No. 37 |
6/7/1933 |
"Lower Gate; Lowering new gate" (No. 21); H16-037-44; shows cars, people, workboats, steamship, and machinery |
10 |
37 |
21 |
Ohio River |
Dam No. 37 |
6/7/1933 |
"Lower Gate; New gate lifted clear. Barge being removed" (No. 20); H16-037-44; shows cars, people, workboats, machinery, and steamship, with a lot of smoke around |
10 |
37 |
21 |
Ohio River |
Dam No. 37 |
6/7/1933 |
"Lower Gate; New gate lifted clear. Barge being removed" (No. 20); H16-037-44; shows cars, people, workboats, machinery, and steamship, with a lot of smoke around |
10 |
37 |
21 |
Ohio River |
Dam No. 37 |
6/6/1933 |
"Upper Gate; View from upper gate recess showing list of new gate just before settling on gate track" (No. 10); H16-037-72; shows men and machinery |
10 |
37 |
21 |
Ohio River |
Dam No. 37 |
6/7/1933 |
"Lower Gate; View showing bracing timbers placed between Louisville and Huntington "A" frame derricks, to hold hoists together as unit during movements from one position to another" (No. 11); H16-037-73; man in background |
10 |
37 |
21 |
Ohio River |
Dam No. 37 |
6/6/1933 |
"Upper Gate; View from upper end of river showing new rolling gate as it touched the water. Note hooks on upper section of gate" (No. 8); H16-037-70; shows machinery and workers |
10 |
37 |
21 |
Ohio River |
Dam No. 37 |
6/7/1933 |
"Upper Gate; View from top of bank showing lowering of new upper gate into upper end of lock chamber" (No. 9); H16-037-71; shows cars, workboats, and machinery on site |
10 |
37 |
21 |
Ohio River |
Dam No. 37 |
6/6/1933 |
"Upper Gate; View showing end of old upper gate on esplanade above gate recess" (No. 6); H16-037-68 |
10 |
37 |
21 |
Ohio River |
Dam No. 37 |
6/6/1933 |
"Upper Gate; View from land wall showing location of Huntington and Louisville "A" frame hoists attached to new rolling gate preparatory to removing it from barge" (No. 7); H16-037-69; shows workboats from one side, with men visible on the left |
11 |
37 |
1 |
Ohio River |
Dam No. 37 |
7/6/1933 |
"Lower Gate; Hoists under heavy strain. Gate caught in land wall. Note hooks on lifting beam and short beam on top." (No. 12); H16-037-35; shows machinery up close |
11 |
37 |
1 |
Ohio River |
Dam No. 37 |
7/6/1933 |
"Lower Gate; Hoists under heavy strain. Gate caught in land wall. Note hooks on lifting beam and short beam on top." (No. 12); H16-037-35; shows machinery up close |
11 |
37 |
1 |
Ohio River |
Dam No. 37 |
7/6/1933 |
"Lower Gate; View of lifting beams and hoist girders. Note short beams of auxiliary hook-up." (No. 13); H16-037-36; shows machinery up close |
11 |
37 |
1 |
Ohio River |
Dam No. 37 |
7/6/1933 |
"Lower Gate; View of lifting beams and hoist girders. Note short beams of auxiliary hook-up." (No. 13); H16-037-36; shows machinery up close |
11 |
37 |
1 |
Ohio River |
Dam No. 37 |
6/6/1933 |
"Upper Gate; Hoists in position to lower gates on lock wall" (No. 5); H16-037-28; shows people, a car, and machinery |
11 |
37 |
1 |
Ohio River |
Dam No. 37 |
6/6/1933 |
"Upper Gate; Hoists in position to lower gates on lock wall" (No. 5); H16-037-28; shows people, a car, and machinery |
11 |
37 |
1 |
Ohio River |
Dam No. 37 |
6/6/1933 |
"Upper Gate; View showing end of old upper gate on esplanade above gate recess" (No. 6); H16-037-29; shows people, machinery, and some of a steamship in background |
11 |
37 |
1 |
Ohio River |
Dam No. 37 |
6/6/1933 |
"Upper Gate; View from land wall showing location of Huntington and Louisville "A" frame hoists attached to new roller gate preparatory to removing it from barge" (No. 7); H16-037-30; shows people, machinery, and two workboats |
11 |
37 |
1 |
Ohio River |
Dam No. 37 |
6/6/1933 |
"Upper Gate; View from upper end of river showing new rolling gate as it touched the water. Note hooks on upper section of gate" (No. 8); H16-037-31; shows people and machinery |
11 |
37 |
1 |
Ohio River |
Dam No. 37 |
6/6/1933 |
"Upper Gate; View from top of bank showing lowering of new upper gate into upper end of lock chamber" (No. 9); H16-037-32; shows lock and dam, cars, workboats, and people |
11 |
37 |
1 |
Ohio River |
Dam No. 37 |
6/6/1933 |
"Upper Gate; View from upper gate recess showing list of new gate just before settling on gate track" (No. 10); H16-037-33; shows machinery and people |
11 |
37 |
1 |
Ohio River |
Dam No. 37 |
6/7/1933 |
"Lower Gate; View showing bracing timbers placed between Louisville and Huntington "A" frame derricks, to hold hoists together as unit during movements from one position to another" (No. 11); H16-037-34; blurry man visible in background |
11 |
37 |
1 |
Ohio River |
Dam No. 37 |
6/7/1933 |
"Lower Gate; Gate lowered into water. Mud being washed off" (No. 15); H16-037-38; shows people, cars, machinery, steamship, workboats, smoke rising, and houses in the background |
11 |
37 |
1 |
Ohio River |
Dam No. 37 |
6/7/1933 |
"Lower Gate; New gate in position" (No. 22); H16-037-45; shows steamship, people, workboats, and cars |
11 |
37 |
1 |
Ohio River |
Dam No. 37 |
6/7/1933 |
"Lower Gate; New gate in position" (No. 22); H16-037-45; shows steamship, people, workboats, and cars |
11 |
37 |
2 |
Ohio River |
Dam No. 37 |
6/7/1933 |
"Lower Gate; View from lower gate recess showing old rolling gate completely removed from lock. After this gate was raised about three feet higher both then Huntington and Louisville hoists listed heavily toward the river wall" (No. 23); H16-037-46 |
11 |
37 |
2 |
Ohio River |
Dam No. 37 |
6/7/1933 |
"Lower Gate; View from land wall of new lower gate in course of being made ready for placing. Note arrangement of steel girders for rails on barge and method of blocking wheels" (No. 24); H16-037-47; shows people and machinery |
11 |
37 |
2 |
Ohio River |
Dam No. 37 |
6/7/1933 |
"Lower Gate; View from lower gate recess showing old rolling gate completely removed from lock. After this gate was raised about three feet higher both then Huntington and Louisville hoists listed heavily toward the river wall" (No. 23); H16-037-46 |
11 |
37 |
2 |
Ohio River |
Dam No. 37 |
6/7/1933 |
"Lower Gate; View from land wall of new lower gate in course of being made ready for placing. Note arrangement of steel girders for rails on barge and method of blocking wheels" (No. 24); H16-037-47; shows people and machinery |
11 |
37 |
2 |
Ohio River |
Dam No. 37 |
6/7/1933 |
"Lower Gate; View from lower land wall showing method of extending steel and timber supports over end of barge to support rolling gate" (No. 25); H16-037-48; shows metal wheel up close, and part of people standing near by |
11 |
37 |
2 |
Ohio River |
Dam No. 37 |
6/7/1933 |
"Lower Gate; View from lower land wall showing new rolling gate in hoisted position while removing barge" (No. 26); H16-037-54; machinery in shot with workboat visible in background |
11 |
37 |
2 |
Ohio River |
Dam No. 37 |
6/7/1933 |
"Lower Gate; View from lower land wall showing method of extending steel and timber supports over end of barge to support rolling gate" (No. 25); H16-037-48; shows metal wheel up close, and part of people standing near by |
11 |
37 |
2 |
Ohio River |
Dam No. 37 |
6/7/1933 |
"Lower Gate; View from lower land wall showing new rolling gate in hoisted position while removing barge" (No. 26); H16-037-54; machinery in shot with workboat visible in background |
11 |
37 |
2 |
Ohio River |
Dam 37 |
6/30/1933 |
"Old lower gate, showing corrosion"; H16-037-49; close up shot of gate |
11 |
37 |
2 |
Ohio River |
Dam 37 |
|
General view of area, showing cars, steamship, people, and workboat; H16-037-51 |
11 |
37 |
2 |
Ohio River |
Dam 37 |
|
"Sept 1936"; "Bear Trap #2-3"; H16-037-52; shows workboats, water tower, and houses in background |
11 |
37 |
2 |
Ohio River |
Lock and Dam No. 37 |
5/19/1949 |
"Looking upstream from lower end of river wall showing river wall; File No. 22972"; H16-037-53; shows workboat and houses in background |
11 |
37 |
2 |
Ohio River |
Dam No. 37 |
11/3/1931 |
"Raising Lower Guide Wall; R-1"; H16-037-21; shows men at work on bank |
11 |
37 |
2 |
Ohio River |
Dam No. 37 |
11/3/1931 |
"Raising Lower Guide Wall; R-2"; H16-037-22; shows men at work on bank |
11 |
37 |
2 |
Ohio River |
Dam No. 37 |
11/9/1931 |
"Raised Lower Guide Wall Completed; R-3"; H16-037-23; shows man and machinery on bank |
11 |
37 |
2 |
Ohio River |
Dam No. 37 |
6/6/1933 |
"Upper Gate; View of the old gate to be removed. Note top truss, plates on top beams, and short top rods spread apart so gates could have been operated" (No. 1); H16-037-24; maneuver boat in shot |
11 |
37 |
2 |
Ohio River |
Dam No. 37 |
6/6/1933 |
"Upper Gate; View of the old gate to be removed. Note top truss, plates on top beams, and short toprods spread apart so gates could have been operated" (No. 1); H16-037-24; maneuver boat in shot |
11 |
37 |
2 |
Ohio River |
Dam No. 37 |
6/6/1933 |
"Upper Gate; Lifting Gate" (No. 2); H16-037-25A; shows workboats, people, and cars, with house barely visible in background |
11 |
37 |
2 |
Ohio River |
Dam No. 37 |
6/6/1933 |
"Upper Gate; Lifting Gate" (No. 2); H16-037-25B; shows workboats, people, and cars, with house barely visible in background |
11 |
37 |
2 |
Ohio River |
Dam No. 37 |
6/6/1933 |
"Upper Gate; Gate lifted clear above tracks" (No. 3); H16-037-26; shows workboats, people, and cars with house visible in background |
11 |
37 |
2 |
Ohio River |
Dam No. 37 |
6/6/1933 |
"Upper Gate; Gate lifted clear of lock; pulling hoists up stream to place gate on lock wall" (No. 4); H16-037-27A; shows people, workboats, cars, and houses in background |
11 |
37 |
2 |
Ohio River |
Dam 37 |
|
Shows upper gate while lifted, with people, cars, workboats, and houses visible; H16-037-27B |
11 |
37 |
2 |
Ohio River |
Dam 37 |
|
Shows upper gate while lifted, with people, cars, workboats, and houses visible; H16-037-27B |
11 |
37 |
2 |
Ohio River |
Dam 37 |
|
Shows upper gate while lifted, with people, cars, workboats, and houses visible; H16-037-27B |
11 |
37 |
2 |
Ohio River |
Dam 37 |
|
Shows upper gate while lifted, with people, cars, workboats, and houses visible; H16-037-27B |
11 |
37 |
2 |
Ohio River |
Dam 37 |
6/30/1933 |
"Old upper gate, showing corrosion"; H16-037-50; close up shot of upper gate |
11 |
38 |
3 |
Ohio River |
Lock and Dam No. 38 |
5/18/1949 |
"Looking upstream showing esplanade; File No. 22955"; H16-038-37 |
11 |
38 |
3 |
Ohio River |
Lock and Dam No. 38 |
5/18/1949 |
"Looking upstream showing land wall; File No. 22958"; H16-038-40 |
11 |
38 |
3 |
Ohio River |
Lock and Dam No. 38 |
5/18/1949 |
"Looking downstream showing land wall; File No. 22961"; H16-038-39; shows buildings on hilltop |
11 |
38 |
3 |
Ohio River |
Lock and Dam No. 38 |
5/18/1949 |
"Looking upstream showing upper guide wall; File No. 22963"; H16-038-38 |
11 |
38 |
3 |
Ohio River |
Lock and Dam No. 38 |
5/18/1949 |
"Looking downstream showing esplanade; File No. 22957"; H16-038-36; car in background on photo |
11 |
38 |
3 |
Ohio River |
Lock and Dam No. 38 |
5/18/1949 |
"Looking upstream from dam axis showing river wall; File No. 22960"; H16-038-34; man and workboat visible in corner |
11 |
38 |
3 |
Ohio River |
Lock and Dam No. 38 |
5/18/1949 |
"Looking downstream from dam axis showing river wall; File No. 22959"; H16-038-33 |
11 |
38 |
3 |
Ohio River |
Lock and Dam No. 38 |
5/18/1949 |
"Looking downstream showing lower guide wall; File No. 22962"; H16-038-35 |
11 |
38 |
3 |
Ohio River |
Lock and Dam No. 38 |
5/11/1948 |
"Maxville, Kentucky Recreation Area, North End of Reservation. Looking upstream (north).; File No. 21367"; H16-038-6; shows picnic area of tables and a picket fence, with structures visible in background |
11 |
38 |
3 |
Ohio River |
Dam 38 |
|
View of construction with workers on site; H16-038-25 |
11 |
38 |
3 |
Ohio River |
Dam 38 |
|
View of land wall; H16-038-26 |
11 |
38 |
3 |
Ohio River |
Lock and Dam 38 |
10/29/1929 |
"Lockkeeper's Cottage; Taken by A.B. Dood"; shows house during construction process |
11 |
38 |
3 |
Ohio River |
Lock and Dam 38 |
10/29/1929 |
"Lockkeeper's Cottage; Taken by A.B. Dood"; H16-038-27; shows house during construction process |
11 |
38 |
3 |
Ohio River |
Lock and Dam 38 |
2/14/1930 |
"Lock-Keepers Cottage; Photographed by A.B. Dood"; H16-038-28; shows house once completed |
11 |
38 |
3 |
Ohio River |
Lock and Dam 38 |
2/14/1930 |
"Lock-Keepers Cottage; Photographed by A.B. Dood"; shows house once completed |
11 |
38 |
3 |
Ohio River |
Lock and Dam 38 |
2/14/1930 |
"Lock-Keepers Cottage; By A.B. Dood"; H16-038-29; shows house once completed, along with other houses on street |
11 |
38 |
3 |
Ohio River |
Lock and Dam 38 |
2/14/1930 |
"Lock-Keepers Cottage; By A.B. Dood"; shows house once completed, along with other houses on street |
11 |
38 |
3 |
Ohio River |
Lock and Dam 38 |
10/28/1929 |
"Lock-Keeper's Cottage; Taken by A.B. Dood"; H16-038-31; shows house during construction process with workers on site |
11 |
38 |
3 |
Ohio River |
Lock and Dam 38 |
10/28/1929 |
"Lock-Keeper's Cottage; Taken by A.B. Dood"; shows house during construction process with workers on site |
11 |
38 |
3 |
Ohio River |
Lock and Dam 38 |
12/7/1929 |
"Lock-Keeper's Cottage; Taken by A.B. Dood"; H16-038-32; shows house during construction process with other houses on street also being built |
11 |
38 |
3 |
Ohio River |
Lock and Dam 38 |
12/7/1929 |
"Lock-Keeper's Cottage; Taken by A.B. Dood"; shows house during construction process with other houses on street also being built |
11 |
38 |
3 |
Ohio River |
Lock and Dam 38 |
12/7/1929 |
"Lock-Keeper's Cottage; Taken by A.B. Dood"; H16-038-30; shows house during construction process with other houses on street also being built |
11 |
38 |
3 |
Ohio River |
Lock and Dam 38 |
12/7/1929 |
"Lock-Keeper's Cottage; Taken by A.B. Dood"; shows house during construction process with other houses on street also being built |
11 |
38 |
3 |
Ohio River |
Dam No. 38 |
12/3/1922 |
"General View of Bear Traps - In 3 Sections: Section No. 2"; H16-038-1; includes workboat in shot |
11 |
38 |
3 |
Ohio River |
Dam No. 38 |
|
Shot of bear trap during construction, including a workboat; H16-038-1 |
11 |
38 |
3 |
Ohio River |
Dam No. 38 |
|
Shot of bear trap during construction, including a workboat; H16-038-1 |
11 |
38 |
3 |
Ohio River |
Dam No. 38 |
12/3/1922 |
"General View of Bear Traps - In 3 Sections: Section No. 3"; H16-038-2 |
11 |
38 |
3 |
Ohio River |
Dam No. 38 |
12/3/1922 |
"General View of Bear Traps - In 3 Sections: Section No. 3"; H16-038-2 |
11 |
38 |
3 |
Ohio River |
Dam No. 38 |
11/9/1922 |
"Lower Leaf of Bear Trap No. 1"; H16-038-3; shows workers on site during construction process |
11 |
38 |
3 |
Ohio River |
Dam 38 |
|
Shows workers on site during construction of bear trap; H16-038-3 |
11 |
38 |
3 |
Ohio River |
Lock and Dam 38 |
|
"First Pass Cofferdam Removed; 2nd Pass Cofferdam"; H16-038-4; view of construction site from above, including view of workboats |
11 |
38 |
3 |
Ohio River |
Lock and Dam 38 |
|
View of construction site from above, including view of workboats; H16-038-4 |
11 |
39 |
4 |
Ohio River |
Dam No. 39 |
5/10/1922 |
"Erosion of bank above abutment; Photo No. 282"; H16-039-3; smaller picture taken from bank, with house visible on other side of river |
11 |
39 |
4 |
Ohio River |
Lock and Dam 39 |
|
Aerial shot of lock and dam, and surrounding area, including houses; H16-039-12 |
11 |
39 |
4 |
Ohio River |
Lock and Dam No. 39 |
5/19/1949 |
"Looking upstream showing esplanade; File No. 22983"; H16-039-4 |
11 |
39 |
4 |
Ohio River |
Lock and Dam No. 39 |
5/19/1949 |
"Looking downstream showing lower guide wall; File No. 22982"; H16-039-5 |
11 |
39 |
4 |
Ohio River |
Lock and Dam No. 39 |
5/19/1949 |
"Looking downstream showing river wall; File No. 22976"; H16-039-10 |
11 |
39 |
4 |
Ohio River |
Lock and Dam No. 39 |
5/19/1949 |
"Looking upstream showing river wall; File No. 22975"; H16-039-11; workboat in shot |
11 |
39 |
4 |
Ohio River |
Lock and Dam No. 39 |
5/19/1949 |
"Looking upstream showing land wall; File No. 22979"; H16-039-6 |
11 |
39 |
4 |
Ohio River |
Lock and Dam No. 39 |
5/19/1949 |
"Looking downstream showing land wall; File No. 22977"; H16-039-9; houses visible in background |
11 |
39 |
4 |
Ohio River |
Lock and Dam No. 39 |
5/19/1949 |
"Looking downstream from dam axis showing river wall; File No. 22980"; H16-039-7; steamship visible in background |
11 |
39 |
4 |
Ohio River |
Lock and Dam No. 39 |
5/19/1949 |
"Looking upstream showing upper guide wall; File No. 22981"; H16-039-8 |
11 |
39 |
4 |
Ohio River |
Lock and Dam 39 |
11/9/1951 |
Aerial view of lock and dam, and surrounding area including houses; H16-039-13; 26417 (on back) |
11 |
39 |
4 |
Ohio River |
Dam 39 |
|
Close up shot of machinery |
11 |
39 |
4 |
Ohio River |
Lock and Dam No. 39 |
5/19/1949 |
"Looking upstream from dam axis showing river wall; File No. 22978"; H16-039-2; maneuver boat in shot |
11 |
41 |
5 |
Ohio River |
Louisville Bridge |
|
Image of Louisville Bridge with text: "Gray, Bet. Brook and Floyd, Looking East; Louisville Bridge"; H45-BO-5; M-130 (on back) |
11 |
41 |
5 |
Ohio River |
Louisville Bridge |
|
Negative of Louisville Bridge with text: "Gray, Bet. Brook and Floyd, Looking East; Louisville Bridge"; H45-BO-5 |
11 |
41 |
5 |
Ohio River |
Louisville Bridge |
|
"1889 Louisville Bridge"; H45-BO-5 |
11 |
41 |
5 |
Ohio River |
Louisville Bridge |
|
Image of Louisville Bridge; H45-BO-5 |
11 |
41 |
5 |
Ohio River |
Bridge |
|
"View of warning signs on Big Four Bridge at Falls of Ohio"; H45-BO-3; photo is of bridge only |
11 |
41 |
5 |
Ohio River |
Bridge |
|
"Warning sign on Big 4 Bridge at head of Falls of Ohio"; H45-BO-4; photo is of bridge only |
11 |
41 |
5 |
Ohio River |
Louisville Harbor |
3/23/1949 |
"Looking downstream toward right bank, showing Warning sign on Pennsylvania Railroad Bridge. (From point approximately midway canal head and sign).; File No. 22598"; H45-BO-2; photo is of bridge only |
11 |
41 |
5 |
Ohio River |
|
|
"Pittsburgh Coal Co., Louisville, KY; Showing in the right foreground the derrickboat and plant used for unloading coal from barges. Also shown double track incline loading to storage yards"; No. 6 (on back); H15-OM-78 |
11 |
41 |
5 |
Ohio River |
|
|
"E.T. Slider Co., New Albany, Ind.; Showing incline and unloading plant used in transferring materials from barges to storage yard and cars on the bank of the river"; No. 10; H15-OM-79 |
11 |
41 |
5 |
Ohio River |
Louisville Harbor |
3/23/1949 |
"Looking downstream toward right bank showing Pennsylvania Railroad Bridge and Warning Sign. (From point approximately opposite canal head, 600 feet from Kentucky shore).; File No. 22597"; H16-041-120; photo is of bridge only |
11 |
41 |
5 |
Ohio River |
|
|
"Point Coal Supply Co., New Albany, Ind.; Showing incline and unloading plant used in tranferring materials from barges to cars and storage bins on the bank of the river. Incline is beneath the Southern R.R. Tracks"; No. 11; H15-OM-80 |
11 |
41 |
5 |
Ohio River |
McAlpine Lock & Dam |
7/18/1965 |
"McAlpine Lock & Dam; Upper Site; Aerial"; H15-OM-83; is an aerial view of a lock, dam, and bridge |
11 |
41 |
5 |
Ohio River |
Lock No. 41 |
12/5/1946 |
"Safety Guard Rail; File No. 19542"; H16-041-6; shows guard rail with bridge, people, and boat in background |
11 |
41 |
5 |
Ohio River |
Lock and Dam No. 41 |
10/7/1953 |
"Traffic congestion…. Second section of motor vessel "Vanoline" tow in foreground awaiting lockage of it's first section, motor vessel "Liberty" awaiting behind for lockage.; File No. 27780" (more description included); H16-041-69 |
11 |
41 |
5 |
Ohio River |
Dam No. 41 |
10/21/1926 |
Shot of construction site, including men and machinery; M-104 (on back) |
11 |
41 |
5 |
Ohio River |
Dam No. 41 |
10/21/1926 |
Shot of construction site, including men and machinery; M-103 (on back) |
11 |
41 |
5 |
Ohio River |
Dam No. 41 |
8/24/1926 |
View of dam inlcuding river bank and materials on it; H16-041-100; M-122 (on back) |
11 |
41 |
5 |
Ohio River |
Louisville Harbor |
3/23/1949 |
"Looking downstream from head of canal showing Corps of Engineers mooring and Pennsylvania Railroad Bridge in distance; File No. 22596"; H16-OLP-54; shot of bridge and machinery across river |
11 |
41 |
5 |
Ohio River |
Floating Plant |
3/20/1946 |
""Omega" Pipe Line Dredge from Cincinnatti District, being repaired in drydock at L.P.C.; File No. 18151"; shot of floating plant from one end |
11 |
41 |
5 |
Ohio River |
Floating Plant |
3/20/1946 |
""Omega" Pipe Line Dredge from Cincinnatti District, being repaired in drydock at L.P.C.; File No. 18152"; shot of floating plant from one end |
11 |
41 |
5 |
Ohio River |
Louisville Boat Club House |
|
Image of Louisville Boat Club House with men standing in front of it by a raft; canoes are in shot as well |
11 |
41 |
5 |
Ohio River |
Lock and Dam No. 41 |
8/14/1946 |
"Dry Dock; View Showing Condition Of Gates and Leakage"; H16-041-7; view of gates with water leaking out the bottom and middle |
11 |
41 |
5 |
Ohio River |
Lock and Dam No. 41 |
8/12/1946 |
"Lock Land Wall; View Showing Leakage Under Wall"; H16-041-121; close up shot of wall |
11 |
41 |
5 |
Ohio River |
Lock and Dam No. 41 |
8/12/1946 |
"Lower Lock Gate. View showing condition of protection timbers.; File No. 18991"; H16-041-119; close up shot of gate |
11 |
41 |
5 |
Ohio River |
Lock and Dam No. 41 |
8/13/1946 |
"Boule Weir. Typical view of old anchor bolts and boxes; File No. 19000"; H16-041-118; close up shot of metal bolts |
11 |
41 |
5 |
Ohio River |
Lock and Dam No. 41 |
8/13/1946 |
"Boule Weir. Erosion of metal in shutter. File No. 18997"; H16-041-117; close up shot of metal |
11 |
41 |
5 |
Ohio River |
Lock and Dam No. 41 |
8/13/1946 |
"Boule Weir. Old and new type anchors for trestles.; File No. 19001"; H16-041-116; close up shot of metal |
11 |
41 |
5 |
Ohio River |
Lock and Dam No. 41 |
8/13/1946 |
"Gate operating mechanism. View showing broken springs in gate operating arm.; File No. 19002"; H16-041-115; close up shot of metal |
11 |
41 |
5 |
Ohio River |
Lock and Dam No. 41 |
8/12/1946 |
"Boule Weir. Erosion of structural members in trestle.; File No. 18994"; H16-041-114; close up shot of metal |
11 |
41 |
5 |
Ohio River |
Lock and Dam No. 41 |
8/14/1946 |
"Boule Weir. Erosion of metal in structural member, trestle #11.; File No. 19012"; H16-041-113; close up shot |
11 |
41 |
5 |
Ohio River |
Lock and Dam No. 41 |
8/14/1946 |
"Boule Weir - Repair of eroded anchor bolts. View shows one bolt ready for welding to old bolt and one bolt welded in place.; File No. 19015"; H16-041-112; close up shot of metal and materials |
11 |
41 |
5 |
Ohio River |
Lock and Dam No. 41 |
8/13/1946 |
"Boule Weir. View showing deterioration of anchor bolts.; File No. 18999"; H16-041-111; close up shot of metal and materials |
11 |
41 |
5 |
Ohio River |
Lock and Dam No. 41 |
8/14/1946 |
"Boule Weir. Eroded anchor bolts.; File No. 19014"; H16-041-110; close up shot of metal and materials |
11 |
41 |
5 |
Ohio River |
Lock and Dam No. 41 |
8/13/1946 |
"Boule Weir. Condition of typical shutter.; File No. 18998"; H16-041-109; close up shot of metal and materials |
11 |
41 |
5 |
Ohio River |
Lock and Dam No. 41 |
2/8/1949 |
"Damage to end of the high part of the lower guide wall 5 February 1949. Main Lock by Tow of Motor Vessel LIN SMITH.; File No. 22508"; H16-041-108; close up shot of metal and materials |
11 |
41 |
5 |
Ohio River |
Lock and Dam No. 41 |
8/22/1950 |
"Repairs to Lower Gate. Auxiliary lock, left leaf.; File No. 24762"; H16-041-107; close up shot of gate with workers in background |
11 |
41 |
5 |
Ohio River |
Lock and Dam No. 41 |
2/8/1949 |
"Damage to end of the high part of the lower guide wall, 5 February 1949. Main Lock by Tow of Motor Vessel LIN SMITH.; File No. 22506"; H16-041-106; close up shot of metal and materials |
11 |
41 |
5 |
Ohio River |
Lock and Dam No. 41 |
2/8/1949 |
"Damage to end of the high part of the lower guide wall 5 February 1949. Main Lock by Tow of Motot Vessel LIN SMITH.; File No. 22507"; H16-041-105; close up shot of metal and materials |
11 |
41 |
5 |
Ohio River |
Lock and Dam No. 41 |
2/8/1949 |
"Damage to end of the high part of the lower guide wall 5 February 1949. Main Lock by Tow of Motor Vessel LIN SMITH.; File No. 22505"; H16-041-104; close up shot of metal and materials |
11 |
41 |
5 |
Ohio River |
Lock and Dam No. 41 |
8/13/1946 |
"Boule Weir. View showing deterioration of structure member of boule weir trestle.; File No. 18996"; H16-041-102; close up shot |
11 |
41 |
5 |
Ohio River |
Lock and Dam No. 41 |
8/13/1946 |
"Boule Weir. View showing bent members in trestle.; File No. 18995"; H16-041-103; close up shot of metal |
11 |
43 |
6 |
Ohio River |
Lock and Dam #43 |
9/7/1920 |
"Close view of Power House"; P-43-15; image is of house only |
11 |
43 |
6 |
Ohio River |
Lock and Dam No. 43 |
8/29/1916 |
"Looking into lock coffer from lower bank, showing all of plant; File-1-3-76"; H16-041-2; shot includes rail lines, workboats and machinery |
11 |
43 |
6 |
Ohio River |
Lock and Dam No. 43 |
8/29/1916 |
"View looking into lock coffer; File 1-3-74"; H16-043-1; shot includes steamship, workboat, men, and train engine |
11 |
43 |
6 |
Ohio River |
Lock and Dam #43 |
9/7/1920 |
"Close view of Power House"; H16-043-8; P-43-15; image of house only |
11 |
43 |
6 |
Ohio River |
Lock |
8/11/1969 |
"Photo No. 3 - Close-up of end of upper guide wall showing white disk.; File No. 4053"; H16-043-12; includes boat on river bank |
11 |
43 |
6 |
Ohio River |
Lock and Dam No. 43 |
10/29/1946 |
"Garage; Length Of Five Garages At Dwellings Is Inadequate For Automobile Storage.; File No. 19413"; H16-043-19; is a shot of a garage from the side with the tail end of a car barely visible |
11 |
43 |
6 |
Ohio River |
Lock and Dam No. 43 |
8/16/1946 |
"Typical View Of Lock Wall; Broken Concrete Is Safety Hazard To Employees Working On Wall; File 19024"; H16-043-20; close up shot of cracked guide wall |
11 |
43 |
6 |
Ohio River |
Lock and Dam #43 |
7/1/1930 |
View of lock and dam from opposite river bank, with houses visible; H16-043-9; 128 (on back) |
11 |
43 |
6 |
Ohio River |
Lock and Dam #43 |
7/1/1930 |
View of lock and dam from river bank, with workboat visible; H16-043-11; 129 (on back) |
11 |
43 |
6 |
Ohio River |
Lock and Dam #43 |
7/1/1930 |
View of lock and dam from river bank, with workboat visible; H16-043-10; 131 (on back) |
11 |
43 |
6 |
Ohio River |
Lock and Dam No. 43 |
7/8/1949 |
"Steps and section of slope wall; File No. 23306"; H16-043-23; shot of steps with house at top of hill |
11 |
43 |
6 |
Ohio River |
Lock and Dam No. 43 |
8/16/1946 |
"Pipe line excess in lock chamber, damaged supports for pipe protection timbers.; File No. 19023"; H16-043-15; close up shot of pipes and concrete |
11 |
43 |
6 |
Ohio River |
Lock and Dam No. 43 |
8/16/1946 |
"Lock River Wall. Broken concrete on top of wall and at pipe trench. Leakage through closed valves.; File No. 19022"; H16-043-21; close up shot of river wall taken from bank |
11 |
43 |
6 |
Ohio River |
Lock and Dam No. 43 |
8/16/1946 |
"Lock Landwall and Esplanade. Broken concrete and guides at pipetrench prevent installation of protection timbers. File No. 19025"; H16-043-17; shot of river bank including truck, stairs, and house at top of hill |
11 |
43 |
6 |
Ohio River |
Lock and Dam No. 43 |
10/29/1946 |
"Lock - River Wall; View Showing Need For Corner Protection Timbers; File No. 19412"; H16-043-18; close up shot of river wall |
11 |
43 |
6 |
Ohio River |
Lock and Dam No. 43 |
8/16/1946 |
"Gate Operating Mechanism. Track shown was built to overcome sag, due to worn bearings and pins in gate and sector arms.; File No. 19020"; H16-043-22; close up shot |
11 |
43 |
6 |
Ohio River |
Lock and Dam No. 43 |
8/16/1946 |
"Lower Lock Gate; No Major Repairs Made Since Installation In 1920; Gate Leaves Are Limber. Structural Parts Deteriorated By Rust; File 19021"; H16-043-16; shot of gates with water leaking through the middle |
11 |
43 |
6 |
Ohio River |
Lock and Dam No. 43 |
7/25/1951 |
"Robert Jarrell & Son, Kirklin, Indiana, Reconstruction of Top River Wall and Installation of Corner Protection Walls; File No. 25688" (more description included); H16-043-13; shows men working on site |
11 |
43 |
6 |
Ohio River |
Lock and Dam No. 43 |
7/25/1951 |
"From midpoint of river wall looking downstream showing removal of concrete on top of walls.; File No. 25687" (more description included); H16-043-14; shows river wall with men and cars visible in background |
11 |
43 |
6 |
Ohio River |
Lock & Dam 43 |
8/30/1954 |
"Danger Sign facing upstream on Beartrap Pier.; File No. 28466" (more description included) |
11 |
43 |
6 |
Ohio River |
Lock & Dam 43 |
8/30/1954 |
"Danger Sign facing upstream on Beartrap Pier.; File No. 28466" (more description included) |
11 |
43 |
6 |
Ohio River |
Lock & Dam No. 43 |
11/7/1951 |
"Looking upstream.; File No. 26420"; aerial shot over lock and dam and surrounding area |
11 |
43 |
6 |
Ohio River |
Lock & Dam No. 43 |
7/25/1951 |
"From approximate 460 foot point on river wall looking downstream showing forms in place.; File No. 25689" (more description included). H16-043-4; shows men at work on river wall |
11 |
43 |
6 |
Ohio River |
Lock & Dam No. 43 |
7/25/1951 |
"Stockpile of protection armor and buffing before installation.; File No. 25690" (more description included); H16-043-5; shows man working on protection armor |
11 |
43 |
6 |
Ohio River |
Lock & Dam No. 43 |
7/25/1951 |
"Runway built on lower gates for access to river wall during repairs.; File No. 25686" (more description included); H16-043-6; shows men on river wall and runway |
11 |
44 |
6 |
Ohio River |
Lock and Dam No. 44 |
1/18/1921 |
"Derrick Boats Nos. 1 and 2 transferring supplies received by river from Lock and Dam No. 43, to incline railroad"; H16-043-111 |
11 |
43 |
6 |
Ohio River |
Lock & Dam No. 43 |
7/25/1951 |
"Runway built on lower gates for access to river wall during repairs.; File No. 25686" (more description included); shows men on river wall and runway |
11 |
43 |
6 |
Ohio River |
Lock and Dam #43 |
9/7/1920 |
"View showing grading of banks at lower gate for slope paving"; H16-043-3; P-43-16; shows dirt and materials, with river wall in background |
11 |
43 |
6 |
Ohio River |
Lock and Dam #43 |
9/7/1920 |
"View showing grading of banks at lower gate for slope paving"; H16-043-3; P-43-16; shows dirt and materials, with river wall in background |
11 |
44 |
7 |
Ohio River |
Lock |
|
Small photo of workmen with steamship visible in background |
11 |
44 |
7 |
Ohio River |
Lock |
|
"Upper Place Looking Upstream"; small photo taken from river bank; 80HM-64 (on back); 21-2-209 (on back) |
11 |
44 |
7 |
Ohio River |
Lock |
|
"Upper Place Looking Downstream"; small photo taken from river bank; 80HM-63 (on back); 21-2-209 (on back) |
11 |
44 |
7 |
Ohio River |
Lock |
|
Small photo of construction site, showing materials, machinery, and workboats |
11 |
44 |
7 |
Ohio River |
Lock |
|
Small photo of construction site, showing materials, machinery, and workboats |
11 |
44 |
7 |
Ohio River |
Lock |
|
Small photo of construction site, showing materials, machinery, and workboats |
11 |
44 |
7 |
Ohio River |
Lock & Dam #44 |
|
Small photo of construction site, showing materials, machinery, and workboats; H16-044-39 |
11 |
44 |
7 |
Ohio River |
Lock 44 |
|
Small photo of construction site, showing materials and machinery; H16-044-36 |
11 |
44 |
7 |
Ohio River |
Lock 44 |
|
Small photo of construction site, showing materials and machinery |
11 |
44 |
7 |
Ohio River |
Lock 44 |
|
Small photo of worker on construction site; H16-044-37 |
11 |
44 |
7 |
Ohio River |
Lock 44 |
|
Small photo of worker on construction site |
11 |
44 |
7 |
Ohio River |
Lock 44 |
|
Small photo of dam taken from one side of river; H16-044-38 |
11 |
44 |
7 |
Ohio River |
Lock 44 |
|
Small photo of dam taken from one side of river |
11 |
44 |
7 |
Ohio River |
Lock 44 |
|
Small photo of construction site from across river, including workboats; H16-044-35 |
11 |
44 |
7 |
Ohio River |
Lock 44 |
|
Small photo of construction site with workers on it; H16-044-34 |
11 |
44 |
7 |
Ohio River |
Lock and Dam No. 44 |
8/31/1921 |
"Union Hammer"; H16-044-93; P-44-31; photo of workers on construction site |
11 |
44 |
7 |
Ohio River |
Lock and Dam No. 44 |
8/31/1921 |
"Pump Boat #1 suction pipes"; H16-044-94; P-44-30 |
11 |
44 |
7 |
Ohio River |
Lock and Dam No. 44 |
10/6/1921 |
"Pouring concrete into land wall forms at upper gate recess"; H16-044-84; P-44-40; shows workers on site |
11 |
44 |
7 |
Ohio River |
Lock and Dam No. 44 |
10/6/1921 |
"Upper river wall gat anchor"; H16-044-85; P-44-41; close up shot of metal structure |
11 |
44 |
7 |
Ohio River |
Lock and Dam No. 44 |
10/6/1921 |
"River wall foundation.-Down stream from Turbine Pit"; H16-044-101; P-44-33; shows construction site, including workers, materials, and a workboat |
11 |
44 |
7 |
Ohio River |
Lock and Dam No. 44 |
8/31/1921 |
"View of lock from upstream end of cofferdam. Poiree dam foundation and up per miter sill in foreground"; H16-044-100; P-44-23; faded shot of construction site, including workers, rail lines, machinery, and materials |
11 |
44 |
7 |
Ohio River |
Lock and Dam No. 44 |
9/9/1920 |
Abstract of proposals; H16-044-40; is a picture of a piece of paper |
11 |
44 |
7 |
Ohio River |
Lock and Dam No. 44 |
9/9/1920 |
Abstract of proposals; is a picture of a piece of paper |
11 |
44 |
7 |
Ohio River |
Lock and Dam No. 44 |
9/15/1920 |
Abstract of proposals; H16-044-41; is a picture of a piece of paper |
11 |
44 |
7 |
Ohio River |
Lock and Dam No. 44 |
|
Panorama shot of construction site for lock and dam, including workers, workboats, machinery, and materials; H16-044-65; 21-2-11 (on back) |
11 |
44 |
7 |
Ohio River |
Dam No. 44 |
7/14/1925 |
View of construction site including materials and workers; H16-044-117; #243 (on back) |
11 |
44 |
7 |
Ohio River |
Dam No. 44 |
7/14/1925 |
View of construction site including materials and workers; H16-044-115; #240 (on back) |
11 |
44 |
7 |
Ohio River |
Dam No. 44 |
|
View of construction site including workboat, workers, machinery and materials; H16-044-114; #246 (on back) |
11 |
44 |
7 |
Ohio River |
Dam No. 44 |
|
Faded close up shot of dam's construction; H16-044-118; #245 (on back) |
11 |
44 |
7 |
Ohio River |
Lock and Dam No. 44 |
8/31/1921 |
"Fixed metal in place at upper miter sill"; H16-044-98; P-44-24; faded image of construction site |
11 |
44 |
7 |
Ohio River |
Lock 44 |
8/31/1921 |
"View across lock from upper corner of cofferdam"; H16-044-95; P-44-29; slightly faded shot of construction site including workers, materials, machinery, rail lines, and houses in background |
11 |
44 |
7 |
Ohio River |
Dam No. 44 |
7/14/1925 |
View of construction site; H16-044-116; #242 (on back) |
11 |
44 |
7 |
Ohio River |
Lock 44 |
7/27/1921 |
"View of Lock from downstream Coffer - Pump boat in background - R.R. trestle into Coffer in fore ground"; H16-044-1; P-44-15 |
11 |
44 |
7 |
Ohio River |
Lock 44 |
7/27/1921 |
"Concrete Mixing Plant - on Coffer Wall"; H16-044-2; shot includes workers, rail line, and train engine |
11 |
44 |
7 |
Ohio River |
Lock 44 |
7/27/1921 |
"Panorama View of Lock from upstream corner of Coffer"; H16-044-3; P-44-9-12; shot includes workboats, machinery, and materials |
11 |
44 |
7 |
Ohio River |
Lock and Dam 44 |
|
General view of construction site, including workboats, and materials; H16-044-4; P-44-20 |
11 |
44 |
7 |
Ohio River |
Lock and Dam 44 |
7/28/1921 |
"Concrete Plant at Coffer Wall showing method of filling Sand and Gravel Hopper and finally Loading Cars"; H16-044-5; P-44-16; includes workboats, steamship, machinery, rail lines, and workers |
11 |
44 |
7 |
Ohio River |
Lock and Dam 44 |
8/31/1921 |
"View across lock from river wall cofferdam - Vulcan hammer driving steel sheet piles"; H16-044-6; P-44-27; faded image including machinery, materials, and houses in background |
11 |
44 |
7 |
Ohio River |
Lock and Dam No. 44 |
11/17/1922 |
"Derrick Boat No 31 Driving round pile for pumpboat foundation with swinging leads"; H16-044-7; 20-3-66 (on back) |
11 |
44 |
7 |
Ohio River |
Lock and Dam No. 44 |
11/17/1922 |
"Driving steel sheet pile. Pass. In first pass coffer"; H16-044-8; 20-3-68 (on back); shot includes workers and workboat |
11 |
44 |
7 |
Ohio River |
Lock and Dam No. 44 |
11/17/1922 |
"General view in first pass coffer"; H16-044-9; 20-3-62 (on back); includes workers, machinery, materials, and houses in background |
11 |
44 |
7 |
Ohio River |
Lock and Dam No. 44 |
11/17/1922 |
"Hurters and sill (pass) in place and concrete partly poured"; H16-044-10; 20-3-64 (on back); shot includes workers, materials, and water tower in background |
11 |
44 |
7 |
Ohio River |
Lock and Dam No. 44 |
11/17/1922 |
"General view in first pass coffer taken from river wall of lock"; H16-044-11; 20-3-65 (on back); includes workers, rail lines, machinery, workboats, and materials |
11 |
44 |
7 |
Ohio River |
Lock and Dam No. 44 |
7/13/1923 |
"Construction of second Pass cofferdam"; H16-044-12; 21-3-149 (on back); shot includes river and workboats |
11 |
44 |
7 |
Ohio River |
Lock and Dam 44 |
11/8/1923 |
View of river and construction site including workboat and shack in corner; H16-044-13; 21-2-8 (on back) |
11 |
44 |
7 |
Ohio River |
Lock and Dam 44 |
11/8/1923 |
View of construction site including workers and materials, with house and water tower in background; H16-044-14; 21-2-6 (on back) |
11 |
44 |
7 |
Ohio River |
Dam No. 44 |
9/30/1924 |
"Chanonine wier"; H16-044-15; 21-2-107 (on back); shot includes workboat, rail lines, and materials |
11 |
44 |
7 |
Ohio River |
Dam No. 44 |
9/30/1924 |
"Pumpboat unwatering bear trap coffer"; H16-044-16; 21-2-108 (on back); includes workboat, and train engine |
11 |
44 |
7 |
Ohio River |
Dam No. 44 |
9/30/1924 |
"Bear trap pier excavation"; H16-044-17; 21-2-111 (on back); includes rail lines, train engine, workers, and workboat in background |
11 |
44 |
7 |
Ohio River |
Dam No. 44 |
9/30/1924 |
"Excavating for Bear Trap piers"; H16-044-18; 21-2-116 (on back); includes rail lines, train engine, workers, and machinery |
11 |
44 |
7 |
Ohio River |
Lock and Dam No. 44 |
8/5/1924 |
"Bear trap cofferdam"; H16-044-19; 21-2-29 (on back); includes workboats, and house in background (barely visible) |
11 |
44 |
7 |
Ohio River |
Lock and Dam No. 44 |
8/5/1924 |
"Sinking crib below Bebout"; H16-044-20; 21-2-28 (on back); includes workboats, and house in background |
11 |
44 |
7 |
Ohio River |
Lock and Dam No. 44 |
8/5/1924 |
"Sinking crib below Bebout"; H16-044-21; 21-2-27 (on back); includes workboats and workers |
11 |
44 |
7 |
Ohio River |
Lock and Dam No. 44 |
11/29/1924 |
"View in Beartrap coffer; File 21-2-147"; H16-044-22; #147 (on back); includes rail lines, machinery, and materials |
11 |
44 |
7 |
Ohio River |
Dam No. 44 |
11/29/1924 |
"View in beartrap coffer"; H16-044-23; #146 (on back); includes machinery, rail lines, and materials |
11 |
44 |
7 |
Ohio River |
Dam No. 44 |
11/29/1924 |
"View in beartrap coffer"; H16-044-24; 148 (on back); includes rail lines, machinery, materials, and house in background |
11 |
44 |
7 |
Ohio River |
Dam No. 44 |
11/29/1924 |
"View in beartrap coffer"; H16-044-25; #149 (on back); includes workboat, machinery, rail lines, and train engine |
11 |
44 |
7 |
Ohio River |
Dam No. 44 |
7/14/1925 |
View of construction site with workers on it, including workboat in background; H16-044-26; #241 (on back) |
11 |
44 |
7 |
Ohio River |
Lock and Dam No. 44 |
1/29/1940 |
"Ice conditions. Removing ice from above upper gate, preparatory to opening. File 4869"; H16-044-27; worker and workboat in shot |
11 |
44 |
7 |
Ohio River |
Lock and Dam No. 44 |
10/21/1946 |
"Beartrap Emptying Valve; Hole Shown Should Be Square; File No. 19370"; H16-044-28; close up shot of metal |
11 |
44 |
7 |
Ohio River |
Lock and Dam No. 44 |
10/21/1946 |
"Beartrap Emptying Valve; Hole Shown Should Be Square; File No. 19370"; H16-044-28; close up shot of metal |
11 |
44 |
7 |
Ohio River |
Lock and Dam No. 44 |
10/21/1946 |
"Beartrap Emptying Valve Shaft; View Showing Worn Condition Of Shaft; File No. 19371"; H16-044-29; close up shot of metal |
11 |
44 |
7 |
Ohio River |
Lock and Dam No. 44 |
10/21/1946 |
"Beartrap Emptying Valve Shaft; View Showing Worn Condition Of Shaft; File No. 19371"; H16-044-29; close up shot of metal |
11 |
44 |
7 |
Ohio River |
Lock and Dam No. 44 |
7/8/1949 |
"Looking upstream showing esplanade; File No. 23293"; H16-044-30; shows esplanade with car at end of it |
11 |
44 |
7 |
Ohio River |
Lock and Dam No. 44 |
7/8/1949 |
"Looking upstream from dam axis showing river wall; File No. 23289"; H16-044-31; includes workers and workboat |
11 |
44 |
7 |
Ohio River |
Dam #44 |
10/17/1964 |
Aerial view of lock and dam and surrounding area (more description included); H16-044-138 |
11 |
44 |
7 |
Ohio River |
Lock and Dam No. 44 |
8/9/1946 |
"Lockwall Cover Plates. View showing broken hinges.; File No. 18987"; H16-044-135; is a close up shot |
11 |
44 |
7 |
Ohio River |
Lock and Dam No. 44 |
8/9/1946 |
"Lock Guide Wall. Broken concrete on river edge of wall.; File No. 18988"; H16-044-136; is a close up shot |
11 |
45 |
8 |
Ohio River |
Lock and Dam No. 45 |
10/19/1946 |
"Beartrap No. 1; Leakage Is Due To Holes In Plates On Lower Leaf And To Deterioration Of Upper Leaf And Seals. File No. 19386"; H16-045-1; is a photo of water pouring through beartrap |
11 |
45 |
8 |
Ohio River |
Lock and Dam No. 45 |
10/19/1946 |
"Beartrap No. 1; Leakage Is Due To Holes In Plates On Lower Leaf And To Deterioration Of Upper Leaf And Seals. File No. 19386"; H16-045-1; is a photo of water pouring through beartrap |
11 |
45 |
8 |
Ohio River |
Lock and Dam No. 45 |
10/19/1946 |
"Beartrap No. 1; Leakage Is Due To Holes In Plates On Lower Leaf And To Deterioration Of Upper Leaf And Seals. File No. 19385"; H16-045-3; is a photo of water pouring through beartrap |
11 |
45 |
8 |
Ohio River |
Lock and Dam No. 45 |
10/19/1946 |
"Beartrap No. 1; Leakage Is Due To Holes In Plates On Lower Leaf And To Deterioration Of Upper Leaf And Seals. File No. 19385"; H16-045-3; is a photo of water pouring through beartrap |
11 |
45 |
8 |
Ohio River |
Lock and Dam No. 45 |
10/19/1946 |
"Beartrap No. 1; View Showing Leakage Through Hole Worn In Lower Leaf; File No. 19387"; H16-045-4; image is of pouring water |
11 |
45 |
8 |
Ohio River |
Lock and Dam No. 45 |
10/19/1946 |
"Beartrap No. 1; View Showing Leakage Through Hole Worn In Lower Leaf; File No. 19387"; H16-045-4; image is of pouring water |
11 |
45 |
8 |
Ohio River |
Lock and Dam #45 |
11/7/1947 |
"Repairs to Bear Traps; General view from downstream end of pier 3, showing buckle plates B2 & B3, renewed on Trap 2; File No. 20616"; H16-045-6; includes workers, metal, and equipment |
11 |
45 |
8 |
Ohio River |
Lock and Dam #45 |
11/7/1947 |
"Repairs to Bear Traps; General view from downstream end of pier 3, showing buckle plates B2 & B3, renewed on Trap 2; File No. 20616"; H16-045-6; includes workers, metal, and equipment |
11 |
45 |
8 |
Ohio River |
Lock and Dam #45 |
11/7/1947 |
"Repairs to Bear Traps; General view from downstream end of pier 3, showing buckle plates B2 & B3, renewed on Trap 2; File No. 20616"; H16-045-6; includes workers, metal, and equipment |
11 |
45 |
8 |
Ohio River |
Lock and Dam #45 |
11/7/1947 |
"Repairs to Bear Traps; General view from downstream end of pier 3, showing buckle plates B2 & B3, renewed on Trap 2; File No. 20616"; H16-045-6; includes workers, metal, and equipment |
11 |
45 |
8 |
Ohio River |
Lock and Dam No. 45 |
6/3/1949 |
"Looking downstream showing land wall.; File No. 23061"; H16-045-7; image of river bank taken from river; includes house, car, and people in shot |
11 |
45 |
8 |
Ohio River |
Lock and Dam 45 |
2/11/1953 |
"MB 32 - Sunk in Lock Chamber; View downstream"; H16-045-18; shows workboat sinking with people around it |
11 |
46 |
9 |
Ohio River |
Lock 46 |
|
"Lock Chamber"; small photo of construction site, showing rail lines, machinery, materials, and workers, with houses visible in background |
11 |
46 |
9 |
Ohio River |
Lock 46 |
|
"First section of Base for dam"; small photo of construction site, showing workboat, workers, machinery, and materials |
11 |
46 |
9 |
Ohio River |
Dam #46 |
|
"Dredge Boat Col. M. B. Adams; Str Shawnee; First section of coffer dam"; small photo showing site during construction process, including steamships and workboats |
11 |
46 |
9 |
Ohio River |
Lock 46 |
|
"Lock chamber completed and now are hanging gates"; small photo of construction site, including machinery, materials, and people |
11 |
46 |
9 |
Ohio River |
Lock 46 |
|
"Running Last Batch of Concrete on River Wall"; small photo of construction site including workers and machinery |
11 |
46 |
9 |
Ohio River |
Lock and Dam No. 46 |
8/3/1939 |
"(left) old type reflector on lock wall light standard; (right) Luminaire type reflector on lock wall light standard; File 4025"; H16-046-1; people in background of right photo |
11 |
46 |
9 |
Ohio River |
Lock and Dam No. 46 |
8/3/1939 |
"Luminaire type reflector on lock wall light standard; File 4027"; H16-046-2; people in background of photo |
11 |
46 |
9 |
Ohio River |
Lock and Dam No. 46 |
10/18/1946 |
"Lock - Upper Guide Wall; View Showing Condition Of Corner Protection Timbers; File No. 19384"; H16-046-3; photo is of river bank, with people, houses, and workboat in background |
11 |
46 |
9 |
Ohio River |
Lock and Dam No. 46 |
10/18/1946 |
"Lock - Upper Guide Wall; View Showing Condition Of Corner Protection Timbers; File No. 19384"; H16-046-3; photo is of river bank, with people, houses, and workboat in background |
11 |
46 |
9 |
Ohio River |
Lock and Dam No. 46 |
8/9/1946 |
"Lower Lock Guide Wall; Damaged Protection Timbers On River Edge Of Wall; File 18984"; H16-046-4; image is of river bank and includes people, small rafts, and work barges |
11 |
46 |
9 |
Ohio River |
Lock and Dam No. 46 |
6/2/1949 |
"Looking downstream showing land wall; File No. 23047"; H16-046-5; shows river bank including car and house |
11 |
46 |
9 |
Ohio River |
Lock and Dam No. 46 |
6/2/1949 |
"Looking upstream showing river wall.; File No. 23042"; H16-046-6; image taken from river bank, showing workboat, and bridge in background |
11 |
46 |
9 |
Ohio River |
Lock 46 |
|
Image of river bank taken from river, showing car and building on hill; H16-046-12 |
11 |
46 |
9 |
Ohio River |
Lock 46 |
|
Image of river bank taken from river, showing car and building on hill; H16-046-12 |
11 |
46 |
9 |
Ohio River |
Lock 46 |
|
Image of river bank taken from river, showing car and building on hill; H16-046-12 |
11 |
46 |
9 |
Ohio River |
Lock 46 |
|
Image of river bank taken from sidewalk, including workboat; H16-046-13 |
11 |
46 |
9 |
Ohio River |
Lock 46 |
|
Image of river bank taken from sidewalk, including workboat; H16-046-13 |
11 |
46 |
9 |
Ohio River |
Lock 46 |
|
Image of river bank taken from sidewalk, including workboat; H16-046-13 |
11 |
47 |
10 |
Ohio River |
Lock and Dam No. 47 |
7/7/1949 |
"Looking upstream showing river wall.; File No. 23271"; H16-047-2; includes workboat and person in image |
11 |
47 |
10 |
Ohio River |
Lock and Dam No. 47 |
7/7/1949 |
"Looking downstream from dam axis showing pipe trench and land wall.; File No. 23269"; H16-047-3 |
11 |
47 |
10 |
Ohio River |
Lock and Dam No. 47 |
8/16/1946 |
"Lock Esplanade.; File No. 19058"; H16-047-1 |
11 |
48 |
11 |
Ohio River |
Dam 48 |
|
Small close up shot of metal |
11 |
48 |
11 |
Ohio River |
Dam 48 |
|
Small photo of a hallway with a ladder at the end of it |
11 |
48 |
11 |
Ohio River |
Dam 48 |
|
Small close up shot of metal |
11 |
48 |
11 |
Ohio River |
Dam 48 |
|
Small shot of site including water |
11 |
48 |
11 |
Ohio River |
Dam 48 |
|
Small photo of hallway with ladder at the end of it; includes people |
11 |
48 |
11 |
Ohio River |
Dam 48 |
|
Small close up shot of metal pipe |
11 |
48 |
11 |
Ohio River |
Dam 48 |
|
Small close up shot of metal pipe |
11 |
48 |
11 |
Ohio River |
Dam 48 |
|
Small photo of men at work on construction site; includes workboat in background |
11 |
48 |
11 |
Ohio River |
Dam 48 |
|
Small detail shot including a ladder |
11 |
48 |
11 |
Ohio River |
Lock & Dam 48 |
|
Small detail shot |
11 |
48 |
11 |
Ohio River |
Dam 48 |
|
Small photo of men at work on river bank; includes a work barge |
11 |
48 |
11 |
Ohio River |
Dam 48 |
|
Small close up shot of metal |
11 |
48 |
11 |
Ohio River |
Dam 48 |
|
Small detail photo of machinery |
11 |
48 |
11 |
Ohio River |
Dam 48 |
|
Small photo of hallway with a ladder at the end of it |
11 |
48 |
11 |
Ohio River |
Dam 48 |
|
Small detail shot of metal |
11 |
48 |
11 |
Ohio River |
Dam 48 |
|
Small photo of men on esplanade |
11 |
48 |
11 |
Ohio River |
Lock |
|
Small photo of man working on lock, including machinery; H16-048-56 |
11 |
48 |
11 |
Ohio River |
Lock & Dam No. 48 |
9/30/1952 |
"Upstream side of lower rolling gate damaged by motor vessel ROBERT P. BONNIE on 10 September 1952.; File No. 26981"; H16-048-20 |
11 |
48 |
11 |
Ohio River |
Lock & Dam No. 48 |
9/30/1952 |
"Upstream side of lower rolling gate damaged by motor vessel ROBERT P. BONNIE on 10 September 1952.; File No. 26981" |
11 |
48 |
11 |
Ohio River |
Lock 48 |
|
Small photo of men working on lock, including a workboat and machinery; H16-048-54 |
11 |
48 |
11 |
Ohio River |
Lock 48 |
|
Small photo of men sandbagging lock; H16-048-55 |
11 |
48 |
11 |
Ohio River |
Lock 48 |
|
Small photo of lock area during construction process, including workers, and materials; H16-048-53 |
11 |
48 |
11 |
Ohio River |
Lock & Dam No. 48 |
10/16/1952 |
"Repairs completed, upstream side of lower rolling gate, damaged by motor vessel ROBERT P. BONNIE on 10 September 1952. (Reference File No. 26981).; File No. 27028"; H16-048-21 |
11 |
48 |
11 |
Ohio River |
Lock & Dam No. 48 |
10/16/1952 |
"Repairs completed, upstream side of lower rolling gate, damaged by motor vessel ROBERT P. BONNIE on 10 September 1952. (Reference File No. 26981).; File No. 27028" |
11 |
48 |
11 |
Ohio River |
Lock 48 |
|
Small photo of men on workboat; H16-048-71 |
11 |
48 |
11 |
Ohio River |
Lock 48 |
|
Small photo of men on workboat; H16-048-70 |
11 |
48 |
11 |
Ohio River |
Lock 48 |
|
Small photo of men working on lock; H16-048-69 |
11 |
48 |
11 |
Ohio River |
Lock 48 |
|
Small photo of man working on lock, mostly completed; H16-048-68 |
11 |
48 |
11 |
Ohio River |
Lock 48 |
|
Small photo of workboats in lock; H16-048-67 |
11 |
48 |
11 |
Ohio River |
Lock 48 |
|
Small photo of lock, mostly completed; H16-048-66 |
11 |
48 |
11 |
Ohio River |
Lock 48 |
|
Small photo of workboats in lock; H16-048-65 |
11 |
48 |
11 |
Ohio River |
Lock 48 |
|
Small view of dam across river, with houses barely visible on other side; H16-048-64 |
11 |
48 |
11 |
Ohio River |
Lock 48 |
|
Small photo of workboats in lock; H16-048-63 |
11 |
48 |
11 |
Ohio River |
Lock 48 |
|
Small photo of workers sandbagging lock; H16-048-62 |
11 |
48 |
11 |
Ohio River |
Lock 48 |
|
Small detail shot of sandbags and water in lock; H16-048-61 |
11 |
48 |
11 |
Ohio River |
Lock 48 |
|
Small photo of workboat in lock, with workers in shot; H16-048-60 |
11 |
48 |
11 |
Ohio River |
Lock 48 |
|
Small photo of workboat in lock, with workers in shot; H16-048-59 |
11 |
48 |
11 |
Ohio River |
Lock 48 |
|
Small photo of men working on construction site with workboat in background; H16-048-58 |
11 |
48 |
11 |
Ohio River |
Lock 48 |
|
Small photo of men standing at construction site; H16-048-57 |
11 |
48 |
11 |
Ohio River |
Lock & Dam No. 48 |
10/16/1952 |
"Repairs completed, upstream side of lower rolling gate, damaged by motor vessel ROBERT P. BONNIE on 10 September 1952. (Reference File No. 26980).; File No. 27027" |
11 |
48 |
11 |
Ohio River |
Lock & Dam No. 48 |
10/16/1952 |
"Repairs completed, upstream side of lower rolling gate, damaged by motor vessel ROBERT P. BONNIE on 10 September 1952. (Reference File No. 26980).; File No. 27027" |
11 |
48 |
11 |
Ohio River |
Lock & Dam No. 48 |
9/30/1952 |
"Upstream side of lower rolling gate damaged by motor vessel ROBERT P. BONNIE on 10 September 1952.; File No. 26980" |
11 |
48 |
11 |
Ohio River |
Lock & Dam No. 48 |
9/30/1952 |
"Upstream side of lower rolling gate damaged by motor vessel ROBERT P. BONNIE on 10 September 1952.; File No. 26980" |
11 |
48 |
11 |
Ohio River |
Lock and Dam No. 48 |
11/5/1920 |
"Driving concrete piles in foundation of land powerhouse. Shows jet line in position; on right is pumphouse housing permanent deep well pump and engine on temporary foundation."; H16-048-1; P-48-12; workers in shot |
11 |
48 |
11 |
Ohio River |
Lock and Dam No. 48 |
7/1/1949 |
"Looking upstream showing land wall.; File No. 23240"; H16-048-3; cars on esplanade in background |
11 |
48 |
11 |
Ohio River |
Lock and Dam No. 48 |
7/1/1949 |
"Looking upstream showing esplanade.; File No. 23243"; H16-048-4; shows cars at end of esplanade |
11 |
48 |
11 |
Ohio River |
Lock and Dam No. 48 |
7/1/1949 |
"Looking downstream showing land wall.; File No. 23239"; H16-048-5; cars, people, and rafts visible in background |
11 |
48 |
11 |
Ohio River |
Lock 48 |
|
Small photo of men at work on construction site, including workboat and machinery; H16-048-8 |
11 |
48 |
11 |
Ohio River |
Lock 48 |
|
Small photo of men at work on construction site, including workboat and machinery; H16-048-9 |
11 |
48 |
11 |
Ohio River |
Lock 48 |
|
Small close up photo of metal wheel; H16-048-6 |
11 |
48 |
11 |
Ohio River |
Lock 48 |
|
Small close up photo of metal wheel; H16-048-7 |
11 |
48 |
11 |
Ohio River |
Lock 48 |
|
Small photo of hallway with ladder at end of it; H16-048-12 |
11 |
48 |
11 |
Ohio River |
Lock 48 |
|
Small photo of men at work on construction site, including machinery in background; H16-048-13 |
11 |
48 |
11 |
Ohio River |
Lock 48 |
|
Small detail shot of construction, including machinery and pipes; H16-048-10 |
11 |
48 |
11 |
Ohio River |
Lock 48 |
|
Small detail shot of metal wheels and pipe; H16-048-11 |
11 |
48 |
11 |
Ohio River |
Lock & Dam No. 48 |
10/16/1952 |
"Repairs completed, downstream side of lower rolling gate, damaged by motor vessel ROBERT P. BONNIE on 10 September 1952. (Reference File No. 26983).; File No. 27029"; H16-048-16 |
11 |
48 |
11 |
Ohio River |
Lock & Dam No. 48 |
9/30/1952 |
"Downstream side of lower rolling gate damaged by motor vessel ROBERT P. BONNIE on 10 September 1952.; File No. 26983"; H16-048-17 |
11 |
48 |
11 |
Ohio River |
Lock & Dam No. 48 |
10/16/1952 |
"Repairs completed, downstream studs & diagonals of lower rolling gate damaged by motor vessel ROBERT P. BONNIE on 10 September 1952. (Reference File No. 26995).; File No. 27040"; H16-048-14 |
11 |
48 |
11 |
Ohio River |
Lock & Dam No. 48 |
9/30/1952 |
"Downstream studs & diagonals, lower rolling gate, damaged by motor vessel ROBERT P. BONNIE on 10 September 1952.; File No. 26995"; H16-048-15 |
11 |
48 |
11 |
Ohio River |
Lock & Dam No. 48 |
10/16/1952 |
"Repairs completed, upstream side of lower rolling gate, damaged by motor vessel ROBERT P. BONNIE on 10 September 1952. (Reference File No. 26980).; File No. 27027 |
11 |
48 |
11 |
Ohio River |
Lock & Dam No. 48 |
10/16/1952 |
"Repairs completed, upstream side of lower rolling gate, damaged by motor vessel ROBERT P. BONNIE on 10 September 1952. (Reference File No. 26981).; File No. 27028 |
11 |
48 |
11 |
Ohio River |
Lock & Dam No. 48 |
10/16/1952 |
"Repairs completed, downstream side of lower rolling gate, damaged by motor vessel ROBERT P. BONNIE on 10 September 1952. (Reference File No. 26983).; File No. 27029 |
11 |
48 |
11 |
Ohio River |
Lock & Dam No. 48 |
9/30/1952 |
"Downstream side of lower rolling gate damaged by motor vessel ROBERT P. BONNIE on 10 September 1952.; File No. 26983" |
11 |
48 |
11 |
Ohio River |
Lock & Dam No. 48 |
10/16/1952 |
"Repairs completed, downstream studs & diagonals of lower rolling gate damaged by motor vessel ROBERT P. BONNIE on 10 September 1952. (Reference File No. 26995).; File No. 27040" |
11 |
48 |
11 |
Ohio River |
Lock & Dam No. 48 |
9/30/1952 |
"Upstream side of lower rolling gate damaged by motor vessel ROBERT P. BONNIE on 10 September 1952.; File No. 26980" |
11 |
48 |
11 |
Ohio River |
Lock & Dam No. 48 |
9/30/1952 |
Upstream side of lower rolling gate damaged by motor vessel ROBERT P. BONNIE on 10 September 1952.; File No. 26981" |
11 |
48 |
11 |
Ohio River |
Lock & Dam No. 48 |
9/30/1952 |
"Downstream studs & diagonals, lower rolling gate, damaged by motor vessel ROBERT P. BONNIE on 10 September 1952.; File No. 26995" |
11 |
49 |
12 |
Ohio River |
Lock and Dam No. 49 |
10/22/1946 |
"View Looking Upstream, Showing Condition Of Indiana Bank From A Point About 1600 Feet Below Abutment.; File No. 19390"; H16-049-1 |
11 |
49 |
12 |
Ohio River |
Lock and Dam No. 49 |
10/22/1946 |
"View Looking Upstream, Showing Condition Of Indiana Bank From A Point About 2200 Feet Below Abutment.; File No. 19389"; H16-049-2 |
11 |
49 |
12 |
Ohio River |
Lock and Dam No. 49 |
10/22/1946 |
"Wall Length Inadequate For Safe Navigation. This Wall Should Be Raised And Extended.; File No. 19392"; H16-049-4 |
11 |
49 |
12 |
Ohio River |
Lock and Dam 49 |
7/9/1947 |
"Barge in tow of "Sohio Fleetwing" on end of lower guide wall at Lock 49.; File No. 20389" (more description included); H16-049-5; includes three boats |
11 |
49 |
12 |
Ohio River |
Lock and Dam No. 49 |
11/24/1948 |
"Looking upstream from above dam axis showing esplanade.; File No. 21315"; H16-049-6; includes workboat in photo |
11 |
49 |
12 |
Ohio River |
Lock and Dam No. 49 |
11/24/1948 |
"Looking upstream from above dam axis showing esplanade.; File No. 21315"; H16-049-6; includes workboat in photo |
11 |
49 |
12 |
Ohio River |
Lock and Dam No. 49 |
11/24/1948 |
"Looking upstream from dam axis showing river lock wall.; File No. 22309"; H16-049-7 |
11 |
49 |
12 |
Ohio River |
Lock and Dam No. 49 |
11/24/1948 |
"Looking upstream from dam axis showing river lock wall.; File No. 22309"; H16-049-7 |
11 |
49 |
12 |
Ohio River |
Lock and Dam No. 49 |
6/8/1949 |
"Looking upstream showing lock river wall.; File No. 23112"; H16-049-8; workboat and man included in photo |
11 |
49 |
12 |
Ohio River |
Lock and Dam No. 49 |
6/8/1949 |
"Looking downstream showing lock land wall.; File No. 23114"; H16-049-9; cars and people on shore in photo |
11 |
49 |
12 |
Ohio River |
Lock and Dam No. 49 |
10/22/1946 |
"Lock - Lower Guide Wall; View Showing Damaged Protection Angles; File No. 19394"; H16-049-10 |
11 |
49 |
12 |
Ohio River |
Lock and Dam No. 49 |
11/24/1948 |
"Looking upstream from upper gate showing upper guide wall.; File No. 22311"; H16-049-11; boat in background |
11 |
49 |
12 |
Ohio River |
Lock and Dam No. 49 |
11/24/1948 |
"Looking upstream from below dam axis showing esplanade.; File No. 21314"; H16-049-12; truck and boat in background |
11 |
50 |
13 |
Ohio River |
Lock and Dam No. 50 |
6/8/1949 |
"Looking downstream showing lock land wall.; File No. 23127"; H16-050-24; truck and houses in photo |
11 |
50 |
13 |
Ohio River |
Lock and Dam No. 50 |
8/14/1946 |
"View showing gravel entrance drives.; File No. 19042"; H16-050-23; image is of houses with a water tower visible in background |
11 |
50 |
13 |
Ohio River |
Lock and Dam No. 50 |
6/8/1949 |
"Looking downstream showing lock land wall.; File No. 23129"; H16-05018 |
11 |
50 |
13 |
Ohio River |
Lock and Dam No. 50 |
11/23/1948 |
"Looking downstream from dam axis showing land lock wall.; File No. 22303"; H16-05017; workboat in corner of photo |
11 |
50 |
13 |
Ohio River |
Lock and Dam No. 50 |
10/22/1946 |
"Lock - Lower Guide Wall; View Showing Condition Of Corner Protection Angles; File No. 19397"; H16-050-20 |
11 |
50 |
13 |
Ohio River |
Lock and Dam No. 50 |
8/13/1946 |
"Earth floor and entrance drives of garage.; File No. 19041"; H16-050-19 |
11 |
50 |
13 |
Ohio River |
Lock and Dam No. 50 |
10/22/1946 |
"Access Road; Maintenance Required To Keep Road Passable In Spring Of Year.; File No. 19396"; H16-050-21 |
11 |
50 |
13 |
Ohio River |
Lock and Dam No. 50 |
10/22/1946 |
"Lock - Upper Guide Wall; View Showing Condition Of Corner Protection Angles.; File 19398"; H16-050-22; boats in photo |
11 |
50 |
13 |
Ohio River |
Dam No. 50 |
10/15/1926 |
"Excavating Roadway"; H16-050-4; shows process of excavating road, including machinery, donkeys, carts, and workers |
11 |
50 |
13 |
Ohio River |
Lock and Dam #50 |
|
"Type of Stone Riprop Dam - (Wing Dam - Spur Dike) built by Shrine in 1830's"; H16-050-1; 193 (on back); shows rock dam lining river bank, and workboats |
11 |
50 |
13 |
Ohio River |
Lock and Dam #50 |
|
Image shows rock dam lining river bank, and workboats; H16-050-1; 189 (on back) |
11 |
50 |
13 |
Ohio River |
Lock and Dam No. 50 |
11/23/1948 |
"Looking upstream from dam axis showing river lock wall.; File No. 22300"; H16-050-14 |
11 |
50 |
13 |
Ohio River |
Lock and Dam No. 50 |
11/23/1948 |
"Looking upstream from upper gate showing upper guide wall.; File No. 22301"; H16-050-15 |
11 |
50 |
13 |
Ohio River |
Lock and Dam No. 50 |
6/8/1949 |
"Looking downstream showing lower guide wall.; File No. 23123"; H16-050-7 |
11 |
50 |
13 |
Ohio River |
Lock and Dam No. 50 |
6/8/1949 |
"Looking downstream from dam axis showing lock river wall.; File No. 23125"; H16-050-9 |
11 |
50 |
13 |
Ohio River |
Lock and Dam No. 50 |
6/8/1949 |
"Looking upstream from dam axis showing lock river wall.; File No. 23126"; H16-050-10 |
11 |
50 |
13 |
Ohio River |
Lock and Dam No. 50 |
6/8/1949 |
"Looking upstream showing lock river wall.; File No. 23130"; H16-050-13; workboat in shot |
11 |
50 |
13 |
Ohio River |
Lock and Dam No. 50 |
6/8/1949 |
"Looking upstream showing lock land wall.; File No. 23131"; H16-050-12 |
11 |
50 |
13 |
Ohio River |
Lock and Dam No. 50 |
6/8/1949 |
"Looking upstream showing upper guide wall.; File No. 23128"; H16-050-11 |
11 |
50 |
13 |
Ohio River |
Lock and Dam No. 50 |
11/23/1948 |
"Looking upstream from dam axis showing land lock wall.; File No. 22302"; H16-050-16 |
11 |
50 |
13 |
Ohio River |
Lock and Dam No. 50 |
6/8/1949 |
"Looking riverward showing ramp and esplanade.; File No. 23133"; H16-050-5 |
11 |
50 |
13 |
Ohio River |
Lock and Dam No. 50 |
6/8/1949 |
"Looking downstream showing lock land wall.; File No. 23132"; H16-050-6 |
11 |
50 |
13 |
Ohio River |
Lock and Dam No. 50 |
6/8/1949 |
"Looking upstream showing lock land wall.; File No. 23124"; H16-050-8 |
11 |
50 |
13 |
Ohio River |
Lock and Dam No. 50 |
11/23/1948 |
"Looking riverward showing ramp leading down to lock.; File No. 22304"; H16-050-2; workboat in background |
11 |
50 |
13 |
Ohio River |
Lock and Dam No. 50 |
11/23/1948 |
"Looking downstream from dam axis showing river lock wall.; File No. 22299"; H16-050-3; small raft in corner of photo |
12 |
51 |
1 |
Ohio River |
Dam 51 |
11/6/1928 |
Small tower with enscription "Essayons"; H16-051-45; 21-2-1090 (on back) |
12 |
51 |
1 |
Ohio River |
Dam 51 |
11/6/1928 |
Shows steps leading to house from esplanade, with small tower on right; H16-051-106; 21-2-1087 (on back) |
12 |
51 |
1 |
Ohio River |
Dam 51 |
9/9/1928 |
Shows steps leading to house from esplanade, during beginning of construction of small tower; shot includes two workers; H16-051-101; 21-2-1001 (on back) |
12 |
51 |
1 |
Ohio River |
Lock & Dam #51 |
8/12/1927 |
"#27 View of Lock & Pass Coffers from Hillside - Looking downstream"; H16-051-70; includes in photo are rail lines, materials, smoke, barges, and workboats |
12 |
51 |
1 |
Ohio River |
Dam 51 |
8/1/1926 |
General view of construction, including machinery, materials, and houses; H16-051-66; 21-2-521 (on back) |
12 |
51 |
1 |
Ohio River |
Lock #51 |
8/12/1927 |
"#10 Placing concrete in Lock Floor Slab #2"; #10 (on back); image includes workers, materials, and machinery |
12 |
51 |
1 |
Ohio River |
Lock #51 |
|
General view of construction, including workers, materials, and machinery; H16-051-62 |
12 |
51 |
1 |
Ohio River |
Lock #51 |
8/12/1927 |
"#11 View upstream in Lock Chamber"; #11 (on back); image includes workers, machinery, and materials |
12 |
51 |
1 |
Ohio River |
Lock #51 |
|
General view of construction, including workers, machinery, and materials; H16-051-63 |
12 |
51 |
1 |
Ohio River |
Dam 51 |
8/4/1927 |
Photo of powerhouse during construction process; H16-051-64; 21-2-695 (on back) |
12 |
51 |
1 |
Ohio River |
Dam 51 |
|
Photo of completed powerhouse; H16-051-65; 21-2-819 (on back) |
12 |
51 |
1 |
Ohio River |
Lock #51 |
8/12/1927 |
"#5 View of Lock Chamber - looking upstream"; #5 (on back); photo includes machinery, materials, and smoke |
12 |
51 |
1 |
Ohio River |
Lock #51 |
|
General view of construction, including machinery, materials, and smoke; H16-051-59 |
12 |
51 |
1 |
Ohio River |
Lock & Dam #51 |
8/12/1927 |
"#22 Power House, Bunk Houses, & Mess Hall - From Esplanade"; #22 (on back) |
12 |
51 |
1 |
Ohio River |
Lock & Dam #51 |
|
Photo includes three houses taken from river bank; H16-051-60 |
12 |
51 |
1 |
Ohio River |
Lock #51 |
8/12/1927 |
"#8 Outside of River Wall and Crib - Looking upstream"; #8 (on back); included in photo are workers, materials, and smoke |
12 |
51 |
1 |
Ohio River |
Lock #51 |
|
General view of construction, including workers, materials, and smoke; H16-051-61 |
12 |
51 |
1 |
Ohio River |
Lock & Dam #51 |
8/12/1927 |
"#30 General view from Roadway - Looking upstream"; #30 (on back); photo is taken from a distance, and includes workboats and machinery in shot |
12 |
51 |
1 |
Ohio River |
Lock & Dam #51 |
|
General view of construction site taken from a distance, including workboats and materials; H16-051-57 |
12 |
51 |
1 |
Ohio River |
Lock #51 |
8/12/1927 |
"#17 Pump set-up inside lower Lock Coffer"; #17 (on back); shows construction site with workers, machinery, and materials around |
12 |
51 |
1 |
Ohio River |
Lock #51 |
|
View of construction site showing workers, materials, and machinery around pump; H16-051-58 |
12 |
51 |
1 |
Ohio River |
Lock #51 |
8/12/1927 |
"#1 Placing concrete in Upper Miter Sill"; #1 (on back); includes workers, rail lines, and train engine in shot |
12 |
51 |
1 |
Ohio River |
Lock #51 |
8/12/1927 |
"#25 Lock River Wall & Crib - Looking upstream"; #25 (on back); includes machinery, materials, and houses in background |
12 |
51 |
1 |
Ohio River |
Lock #51 |
|
General view of lock river wall and crib during construction process, including machinery, materials, and houses in background; H16-051-56 |
12 |
51 |
1 |
Ohio River |
Lock #51 |
|
General view of lock river wall and crib during construction process, including machinery, materials, and houses in background |
12 |
51 |
1 |
Ohio River |
Dam No. 51 |
6/28/1926 |
General view of construction site and surrounding area, including steamship, machinery, and materials; H16-051-42; 415 (on back) |
12 |
51 |
1 |
Ohio River |
Dam No. 51 |
6/28/1926 |
General view of construction site during lock chamber construction, including machinery and materials; H16-051-43; 411 (on back) |
12 |
51 |
1 |
Ohio River |
Dam 51 |
11/6/1928 |
General view of lock chamber, including workers, barges, and machinery; H16-051-44; 21-2-1086 (on back) |
12 |
51 |
1 |
Ohio River |
Lock #51 |
8/12/1927 |
"#19 Travelling derrick setting Upper Miter Sill Anchors"; H16-051-71; #19 (on back); shot includes workers, rail lines, and machinery |
12 |
51 |
1 |
Ohio River |
Lock 51 |
|
General view of site during lock construction, including machinery and materials; H16-051-72; #11 (on back) |
12 |
51 |
1 |
Ohio River |
Lock 51 |
|
General view of site during lock construction, including workers, machinery, and materials, with houses visible in background; H16-051-73 |
12 |
51 |
1 |
Ohio River |
Dam #51 |
8/12/1927 |
"#33 General view of First Pass Coffer, Looking Upstream"; H16-051-78; #33 (on back); photo includes workboats, and houses visible in background |
12 |
51 |
1 |
Ohio River |
Lock #51 |
8/12/1927 |
"#26 Lower end River Wall & Crib - Looking upstream"; H16-051-79; #26 (on back); house visible in corner |
12 |
51 |
1 |
Ohio River |
Lock #51 |
8/12/1927 |
"#24 Lock River Wall & Crib - Looking upstream"; H16-051-80; #24 (on back); photo includes workers, machinery, materials, and houses in background |
12 |
51 |
1 |
Ohio River |
Lock & Dam 51 |
|
"Year 1927" (on back); photo shows completed lock and dam, with person and workboat in shot; H16-051-54; 22 (on back) |
12 |
51 |
1 |
Ohio River |
Lock and Dam No. 51 |
5/25/1949 |
"Looking downstream showing ramp and esplanade.; File No. 23008"; H16-051-49; workboat in photo |
12 |
51 |
1 |
Ohio River |
Lock and Dam No. 51 |
5/25/1949 |
"Looking downstream showing lower guide wall.; File No. 23000"; H16-051-48 |
12 |
51 |
1 |
Ohio River |
Lock and Dam No. 51 |
8/15/1946 |
"Lock Land Wall And Esplanade; View Showing Deteriorated Condition Of Pipe Trench.; File 19050"; H16-051-47; two vehicles in side of photo |
12 |
51 |
1 |
Ohio River |
Lock & Dam #51 |
|
"1927"; photo shows completed lock and dam, with person and workboat in photo; H16-051-55; No. 22 (on back) |
12 |
51 |
2 |
Ohio River |
Dam 51 |
11/6/1928 |
General view of lock chamber from one side; H16-051-81; 1089 (on back) |
12 |
51 |
2 |
Ohio River |
Lock 51 |
|
General view of site during construction process, including workers and materials; H16-051-82; 21-2-1081 (on back) |
12 |
51 |
2 |
Ohio River |
Lock #51 |
8/12/1927 |
"#2 Upper Poiree Dam & Miter Sill"; H16-051-83; includes workers, materials, machinery, and smoke |
12 |
51 |
2 |
Ohio River |
Lock #51 |
8/12/1927 |
"#3 General view inside Lock Cofferdam - including Esplanade. Looking downstream from Mixer Plant"; H16-051-84; includes rail lines, train engine, people, and machinery |
12 |
51 |
2 |
Ohio River |
Lock 51 |
6/23/1926 |
"#49 General View, Middle Section, Lock Coffer"; H16-051-89; F-51-7; includes materials, machinery, and workboats |
12 |
51 |
2 |
Ohio River |
Lock 51 |
|
"June ?, 1926; #51 Lower end of Lock, showing excavation started in lower mitre sill & pump setup inside of… [not legible]"; H16-051-90; F-51-4; shot includes machinery, materials, a raft, and smoke |
12 |
51 |
2 |
Ohio River |
Dam No. 51 |
|
General view of construction site including workers, rail lines, materials, and smoke; H16-051-91; 21-2-263 (on back) |
12 |
51 |
2 |
Ohio River |
Dam No. 51 |
|
General view of construction site, with houses visible in background; H16-051-92; 21-2-262 (on back) |
12 |
51 |
2 |
Ohio River |
Lock #51 |
6/1/1926 |
General view of lock area during construction process; includes workers, workboats, and steamship; H16-051-93; 21-2-342 (on back) |
12 |
51 |
2 |
Ohio River |
Lock 51 |
|
General view of construction site, with houses visible in background; H16-051-94; 21-2-410 (on back) |
12 |
51 |
2 |
Ohio River |
Lock 51 |
|
General view of construction site, including materials, machinery, and smoke; H16-051-95; 21-2-412 (on back) |
12 |
51 |
2 |
Ohio River |
Lock 51 |
6/23/1926 |
"#47 Complicated form work in Upper Land Wall Gate Block. Looking up river."; H16-051-96; F-51-3 (on back); photo includes construction site, and houses in background |
12 |
51 |
2 |
Ohio River |
Dam No. 51 |
6/26/1925 |
General view of lock, mostly completed, including workboats; H16-051-97; 21-2-224 (on back) |
12 |
51 |
2 |
Ohio River |
Dam No. 51 |
9/4/1925 |
View of construction site when beginning construction on banks; includes houses in background; H16-051-98; 21-2-264 (on back) |
12 |
51 |
2 |
Ohio River |
Dam No. 51 |
6/26/1925 |
General view of lock area, including workers and houses in background; H16-051-99; 21-2-222 (on back) |
12 |
51 |
2 |
Ohio River |
Dam No. 51 |
6/26/1925 |
General view of lock area, including workboats; H16-051-100; 21-2-223 (on back) |
12 |
51 |
2 |
Ohio River |
Dam 51 |
9/9/1928 |
Photo of a house with other houses visible beside it; H16-051-102; 21-2-997 (on back) |
12 |
51 |
2 |
Ohio River |
Dam 51 |
9/9/1928 |
General view of lock area from a distance; H16-051-103; 21-2-1002 (on back) |
12 |
51 |
2 |
Ohio River |
Dam 51 |
9/9/1928 |
View of gates during construction process; H16-051-104; 21-2-999 (on back) |
12 |
51 |
2 |
Ohio River |
Dam 51 |
9/9/1928 |
View of river taken from bank, showing boats in river; H16-051-105; 21-2-1000 (on back) |
12 |
51 |
2 |
Ohio River |
Dam 51 |
11/6/1928 |
View of construction materials and some machinery; H16-051-107; 21-2-1085 (on back) |
12 |
51 |
2 |
Ohio River |
Dam 51 |
11/6/1928 |
View of lock area during construction process, showing materials, machinery, workboats, and smoke; H16-051-108; 21-2-1082 (on back) |
12 |
51 |
2 |
Ohio River |
Lock 51 |
6/23/1926 |
"#52 General View, Lower End of Lock Coffer"; H16-051-109; F-51-2 (on back); photo includes materials, and workboats |
12 |
51 |
2 |
Ohio River |
Dam No. 51 |
|
"Plan Of Foundation For River Wall"; H16-051-110; is a chart |
12 |
51 |
2 |
Ohio River |
Lock & Dam No. 51 |
|
"Plan Of Foundation For River Wall"; H16-051-111; is a chart |
12 |
51 |
2 |
Ohio River |
Lock & Dam No. 51 |
|
"Plan Of Foundation For River Wall"; H16-051-112; is a chart |
12 |
51 |
2 |
Ohio River |
Lock & Dam No. 51 |
|
View of workboats at work in river; H16-051-113 |
12 |
51 |
2 |
Ohio River |
Dam 51 |
7/15/1926 |
View of lock and workboats in river; H16-051-114; 21-2-486 (on back) |
12 |
51 |
2 |
Ohio River |
Dam 51 |
9/1/1927 |
Photo showing lock during construction process, including workboats, barge, and machinery; H16-051-118; 21-2-817 (on back) |
12 |
51 |
2 |
Ohio River |
Dam 51 |
9/1/1927 |
Photo taken from one side of river, showing lock during construction process, including workboats, barge, and machinery; H16-051-119; 21-2-813 (on back) |
12 |
51 |
2 |
Ohio River |
Dam 51 |
8/16/1926 |
View of lock during construction process, showing boats in river; H16-051-115; 21-2-526 (on back) |
12 |
51 |
2 |
Ohio River |
Dam 51 |
8/1/1926 |
View of lock during construction process, showing boats in river; H16-051-116; 21-2-517 (on back) |
12 |
51 |
2 |
Ohio River |
Dam 51 |
8/4/1927 |
View of site during construction, including houses in background; H16-051-117; 21-2-694 (on back) |
12 |
51 |
2 |
Ohio River |
Dam 51 |
8/4/1927 |
View of site during construction, including workboats in river; H16-051-120; 21-2-696 (on back) |
12 |
51 |
2 |
Ohio River |
Dam 51 |
9/1/1927 |
View of lock chamber during construction process; H16-051-121; 21-2-814 (on back) |
12 |
51 |
2 |
Ohio River |
Dam 51 |
8/16/1926 |
View of site during construction process, including rail lines, people, and machinery; H16-051-122; 21-2-528 (on back) |
12 |
51 |
2 |
Ohio River |
Dam 51 |
8/16/1926 |
View of workboats and barge in river; H16-051-123; 21-2-529 (on back) |
12 |
51 |
2 |
Ohio River |
Dam 51 |
8/3/1926 |
Close up view of construction; H16-051-124; 21-2-520 (on back) |
12 |
51 |
2 |
Ohio River |
Dam #51 |
8/2/1926 |
Close up view of construction, including workers; H16-051-125; 21-2-500 (on back) |
12 |
51 |
2 |
Ohio River |
Dam #51 |
8/2/1926 |
Close up view of construction; H16-051-126; 21-2-502 (on back) |
12 |
51 |
2 |
Ohio River |
Dam #51 |
8/1/1926 |
Close up view of construction; H16-051-127; 21-2-503 (on back) |
12 |
51 |
2 |
Ohio River |
Dam #51 |
8/1/1926 |
Close up view of construction; H16-051-128; 21-2-506 (on back) |
12 |
51 |
2 |
Ohio River |
Dam #51 |
8/2/1926 |
Close up view of construction; H16-051-129; 21-2-506 (on back) |
12 |
51 |
3 |
Ohio River |
Dam 51 |
8/16/1926 |
General view of construction site, including materials, workers, machinery, and houses in background; H16-051-8; 21-2-527 (on back) |
12 |
51 |
3 |
Ohio River |
Dam #51 |
8/2/1926 |
Close up view of construction, including workers; H16-051-7; 21-2-501 (on back) |
12 |
51 |
3 |
Ohio River |
Lock #51 |
8/12/1927 |
"#21 Lock Land Wall - Looking upstream from Chamber"; photo includes people, machinery, and houses in background |
12 |
51 |
3 |
Ohio River |
Lock #51 |
|
Photo shows lock land wall, and includes people, machinery, and houses in background; H16-051-10 |
12 |
51 |
3 |
Ohio River |
Lock #51 |
|
View of construction including workers, materials, rail lines, and machinery; H16-051-9; 21-2-518 (on back) |
12 |
51 |
3 |
Ohio River |
Dam #51 |
8/2/1926 |
Close up view of construction, including worker; H16-051-6; 21-2-508 (on back) |
12 |
51 |
3 |
Ohio River |
Dam 51 |
8/1/1926 |
View of construction including workers, machinery, materials, and houses in background; H16-051-5; 21-2-519 (on back) |
12 |
51 |
3 |
Ohio River |
Dam 51 |
7/15/1926 |
Close up view of construction, including workers, materials, and machinery; H16-051-3; 21-2-487 (on back) |
12 |
51 |
3 |
Ohio River |
Dam No. 51 |
7/22/1926 |
View of lock chamber taken from river bank, including workboats in river; H16-051-2; 21-2-457 (on back) |
12 |
51 |
3 |
Ohio River |
Lock 51 |
6/23/1926 |
"#50 Construction of Land Wall - Looking Down River"; H16-051-1; F-51-1 (on back); photo includes materials, rail lines, workers, and machinery |
12 |
51 |
3 |
Ohio River |
Dam 51 |
8/4/1927 |
View of site during construction, including workers, rail lines, materials, machinery, and train engine, with houses barely visible in background; H16-051-11; 21-2-697 (on back) |
12 |
51 |
3 |
Ohio River |
Lock #51 |
8/12/1927 |
"#14 Filling Lock Mixer Plant Bins"; H16-051-12; includes workboat, sand piles, canoes, worker, and machinery |
12 |
51 |
3 |
Ohio River |
Lock 51 |
|
General view of lock area during construction, including workboats, barges, rail lines, materials, and machinery; H16-051-16 |
12 |
51 |
3 |
Ohio River |
Dam No. 51 |
7/21/1926 |
Close up view of construction site with two men posing; H16-051-4; 21-2-452 (on back) |
12 |
51 |
3 |
Ohio River |
Lock #51 |
8/12/1927 |
"Photo #34 Night view of Lock Chamber and Mixing Plant - Looking downstream"; H16-051-13; view of construction site at night |
12 |
51 |
3 |
Ohio River |
Lock #51 |
|
View of construction site at night; H16-051-29 |
12 |
51 |
3 |
Ohio River |
Lock #51 |
8/12/1927 |
"#12 Placing concrete in Lock Floor Slab #2"; H16-051-14; includes workers, machinery, and materials |
12 |
51 |
3 |
Ohio River |
Lock #51 |
8/12/1927 |
"#23 General view inside of Lock Cofferdam - Looking upstream"; H16-051-15; photo includes workers, materials, machinery, and houses in background |
12 |
51 |
3 |
Ohio River |
Lock & Dam #51 |
8/12/1927 |
"#28 View of Lock & Pass Coffers from Hillside - Looking downstream"; H16-051-17; photo includes barges, workboats, rail lines, materials, and machinery |
12 |
51 |
3 |
Ohio River |
Dam 51 |
8/4/1927 |
View of site during construction, including workers, materials, and machinery; H16-051-18; 21-2-698 (on back) |
12 |
51 |
3 |
Ohio River |
Lock #51 |
8/12/1927 |
"#18 Pump set-up in Lower Lock Coffer"; H16-051-19; photo includes machinery, workers, and pipeworks |
12 |
51 |
3 |
Ohio River |
Lock #51 |
8/12/1927 |
"#20 Nose of Lock River Wall - Looking downstream"; H16-051-20; photo includes rail lines, machinery, materials, and train engine |
12 |
51 |
3 |
Ohio River |
Lock & Dam #51 |
8/12/1927 |
"#6 View from upper arm of Lock Coffer looking downstream. Pump Boat pumping Lock coffer; Pass coffer in background"; H16-051-22; photo includes pump boat, workboats, and smoke |
12 |
51 |
3 |
Ohio River |
Lock & Dam #51 |
|
Photo is of pump boat with other workboats in background; H16-051-21 |
12 |
51 |
3 |
Ohio River |
Lock #51 |
8/12/1927 |
"#31 Cableway handling 3 drum hoist for travelling derrick"; H16-051-23B; photo includes workers, materials, machinery, and cableway |
12 |
51 |
3 |
Ohio River |
Lock #51 |
8/12/1927 |
"#31X Cableway handling 3 drum hoist for travelling derrick"; H16-051-23B; photo includes workers, materials, machinery, and cableway |
12 |
51 |
3 |
Ohio River |
Lock #51 |
|
View of construction site, showing cableway, materials, workers, and machinery; H16-051-23 |
12 |
51 |
3 |
Ohio River |
Lock #51 |
|
View of construction site, showing cableway, materials, workers, and machinery; H16-051-23A |
12 |
51 |
3 |
Ohio River |
Lock #51 |
|
View of construction site, showing cableway, materials, workers, and machinery; H16-051-23A |
12 |
51 |
3 |
Ohio River |
Lock #51 |
8/12/1927 |
"#13 1 1/4" Reinforcing Bars in Lock Floor Slab #2"; H16-051-24; photo includes workers, machinery, and houses in background |
12 |
51 |
3 |
Ohio River |
Dam #51 |
8/12/1927 |
"#9 Lower arm of Pass Coffer well banked. Looking East to Kentucky Shore."; H16-051-26; includes several workboats |
12 |
51 |
3 |
Ohio River |
Dam #51 |
|
View of lower arm of pass coffer well banker, with several workboats surrounding it; H16-051-26 |
12 |
51 |
3 |
Ohio River |
Lock & Dam #51 |
8/12/1927 |
"#15 Dredge Northern - loading scow, for fill in Pass & Weir"; H16-051-27; includes dredge at work, and canoe |
12 |
51 |
3 |
Ohio River |
Lock #51 |
8/12/1927 |
"#32 Coaling Mixer Feed Boiler and Filling Mixer Sand and Gravel Bins."; H16-051-28; includes barge, and workboats |
12 |
51 |
4 |
Ohio River |
Dam 51 |
9/1/1927 |
View of cofferdam during construction, including materials, machinery, and houses in background; H16-051-31; 21-2-815 (on back) |
12 |
51 |
4 |
Ohio River |
Lock & Dam #51 |
|
View of construction, including workers, machinery, materials, and smoke; H16-051-32 |
12 |
51 |
4 |
Ohio River |
Lock & Dam #51 |
8/12/1927 |
"#29 View of Lock & Pass Coffers from Roadway - Looking upstream."; H16-051-33 |
12 |
51 |
4 |
Ohio River |
Lock & Dam #51 |
8/12/1927 |
View of Lock and Pass Coffers from a distance; H16-051-33 |
12 |
51 |
4 |
Ohio River |
Lock & Dam #51 |
8/12/1927 |
View of Lock and Pass Coffers from a distance; H16-051-33 |
12 |
51 |
4 |
Ohio River |
Lock 51 |
|
View of end of land wall during construction, including machinery, materials, and smoke; H16-051-34 |
12 |
51 |
4 |
Ohio River |
Lock 51 |
|
General view of construction, including materials, rail lines, and machinery; H16-051-35 |
12 |
51 |
4 |
Ohio River |
Lock 51 |
|
View of lock area from a distance, showing workboats, rail lines, materials, machinery, and houses in background; H16-051-36 |
12 |
51 |
4 |
Ohio River |
Lock 51 |
|
General view of construction, including workers, materials, rail lines, and machinery; H16-051-37; 21-2-489 (on back) |
12 |
51 |
4 |
Ohio River |
Lock 51 |
|
View of machinery and pipeworks; H16-051-38 |
12 |
51 |
4 |
Ohio River |
Dam #51 |
8/25/1928 |
"#214 Driving steel piles in diaphram for ??? End of 8' trap, coffer, inside Chanoine Weir Coffer. Coffer partially flooded."; H16-051-39; photo shows workers, machinery, and houses across river in background |
12 |
51 |
4 |
Ohio River |
Lock #51 |
8/12/1927 |
"#7 U.S. Pumpboat 288 Pumping Lock Coffer"; H16-051-85; shows workers, pump boat, machinery, smoke, and houses in background |
12 |
51 |
4 |
Ohio River |
Lock #51 |
8/12/1927 |
"#4 View of Lock Chamber - looking downstream"; H16-051-86; shows workers, rail lines, machinery, and materials |
12 |
51 |
4 |
Ohio River |
Lock 51 |
6/23/1926 |
"#48 General View Upper End Lock Coffer"; H16-051-87; F-51-6 (on back) |
12 |
51 |
4 |
Ohio River |
Lock 51 |
6/23/1926 |
"#46 Land Wall showing footings complete & setting forms for wall"; H16-051-88; F-51-5 (on back); shows workers, rail lines, machinery, and materials |
12 |
51 |
4 |
Ohio River |
Lock #51 |
8/29/1928 |
"Erecting upper gates in Lock"; H16-051-67; view of construction with houses in background |
12 |
51 |
4 |
Ohio River |
Lock 51 |
|
View of houses with people in corner; H16-051-68 |
12 |
51 |
4 |
Ohio River |
Dam #51 |
8/22/1928 |
"#213 View showing Derrick Stone placed in wet behind first 300' of Chanoine Weir Crib."; H16-051-69; view of construction including workers, materials, workboats, and machinery; H16-051-69 |
12 |
51 |
4 |
Ohio River |
Dam #51 |
8/17/1928 |
"#211 Pouring Monolith #7 in Chanoine Weir. Setting horses and props."; H16-051-40; photo includes workers, machinery, workboat, materials, and houses in background |
12 |
51 |
4 |
Ohio River |
Lock and Dam No. 51 |
8/15/1946 |
"Lower Lock Gates. View showing condition of protection timbers.; File No. 19051"; H16-051-46; workboat in background |
12 |
52 |
5 |
Ohio River |
Lock and Dam No. 52 |
8/14/1946 |
"General view of dam.; File No. 19049" |
12 |
52 |
5 |
Ohio River |
Lock 52 |
|
View of guide wall |
12 |
52 |
5 |
Ohio River |
Lock 52 |
|
View of site during construction, including worker, machinery, and materials |
12 |
52 |
5 |
Ohio River |
Lock and Dam No. 52 |
8/19/1941 |
"Position of lodged Maneuver Boat No. 559 after being carried through Bebout weir. Accident resulted from falling of two wickets behind boat. Cause unknown. File No. 7136" |
12 |
52 |
5 |
Ohio River |
Lock and Dam 52 |
1/20/1940 |
"Ice conditions. View showing ice on lower side of wickets.; File P-135"; H16-052-5 |
12 |
52 |
5 |
Ohio River |
Lock and Dam No. 52 |
|
"August 1945; View showing upper gates, Quoin end, before repairs by Paducah Depot.; File 17852-A"; H16-052-6 |
12 |
52 |
5 |
Ohio River |
Lock and Dam No. 52 |
|
"August 1945; View showing upper gates, Quoin end, before repairs by Paducah Depot.; File 17852-A"; H16-052-6 |
12 |
52 |
5 |
Ohio River |
Lock and Dam No. 52 |
|
"August 1945; View showing upper gates, Quoin end, before repairs by Paducah Depot.; File 17852-A"; H16-052-6 |
12 |
52 |
5 |
Ohio River |
Lock and Dam No. 52 |
|
"August 1945; View showing upper gates, Quoin end, before repairs by Paducah Depot.; File 17852-A"; H16-052-7 |
12 |
52 |
5 |
Ohio River |
Lock and Dam No. 52 |
8/18/1945 |
"Upper Lock Gate; Typical Condition Of Gates Removed For Repairs And Painting.; File 17852-A"; H16-052-7 |
12 |
52 |
5 |
Ohio River |
Lock and Dam No. 52 |
8/14/1946 |
"Lower Lock Gate; Damaged Protection Timbers.; File 19044"; H16-052-8 |
12 |
52 |
5 |
Ohio River |
Lock and Dam No. 52 |
8/14/1946 |
"Upper lock guide wall and maneuver boat.; File No. 19047"; H16-052-9 |
12 |
52 |
5 |
Ohio River |
Lock and Dam No. 52 |
10/10/1946 |
"Damaged End Of Lower Lock Guide Wall; File No. 19346"; H16-052-10 |
12 |
52 |
5 |
Ohio River |
Lock and Dam No. 52 |
10/1/1946 |
"Damaged End Of Lower Lock Guide Wall; File No. 19280"; H16-052-11 |
12 |
52 |
5 |
Ohio River |
Lock and Dam No. 52 |
5/25/1949 |
"Looking upstream showing river wall.; File No. 22993"; H16-052-12; includes a workboat |
12 |
52 |
5 |
Ohio River |
Lock and Dam No. 52 |
5/25/1949 |
"Looking upstream from dam axis showing river wall.; File No. 22990"; H16-052-13; includes a workboat and canoe |
12 |
52 |
5 |
Ohio River |
Lock and Dam No. 52 |
5/25/1949 |
"Looking upstream from dam axis showing river wall.; File No. 22990"; H16-052-13; includes a workboat and canoe |
12 |
53 |
6 |
Ohio River |
Lock and Dam No. 53 |
10/27/1948 |
"Damage to lower gate by Towboat "GLADYS SMITH", 18 October 1948; File No. 22182"; H16-053-3 |
12 |
53 |
6 |
Ohio River |
Lock and Dam No. 53 |
11/17/1948 |
"Looking upstream from dam axis showing river lock wall.; File No. 22293"; H16-053-4; includes steamship in background |
12 |
53 |
6 |
Ohio River |
Lock and Dam No. 53 |
|
"1927"; H16-053-2; view of completed lock and dam from river bank |
12 |
53 |
6 |
Ohio River |
Lock and Dam No. 53 |
11/17/1948 |
"Looking upstream from lower end of river lock wall.; File No. 22294"; H16-053-5; boats visible in background |
12 |
53 |
6 |
Ohio River |
Lock and Dam No. 53 |
8/11/1949 |
"Showing walkway on upper landwall gate.; File No. 23497"; H16-053-6 |
12 |
53 |
6 |
Ohio River |
Lock and Dam No. 53 |
9/19/1962 |
View of workers repairing guide wall; H16-053-7; 34885 (on back) |
12 |
53 |
6 |
Ohio River |
Lock and Dam No. 53 |
9/19/1962 |
View of workers repairing guide wall; H16-053-7; 34885 (on back) |
12 |
53 |
6 |
Ohio River |
Lock and Dam No. 53 |
9/19/1962 |
View of guide wall, with person visible in background; H16-053-8; 34888 (on back) |
12 |
53 |
6 |
Ohio River |
Lock and Dam No. 53 |
9/19/1962 |
View of guide wall, with person visible in background; H16-053-8; 34888 (on back) |
12 |
0 |
7 |
Carrollton, KY |
Flood |
|
Small aerial view of city during flood; H50-FM-11; 11 FLD-6-3 (on back) |
12 |
0 |
7 |
Carrollton, KY |
Flood |
|
"1937 Flood At Courthouse Carrollton, KY"; H50-FM-14 |
12 |
0 |
7 |
Carrollton, KY |
Flood |
|
"1937 Flood At Main Street Carrollton, Kentucky"; H50-FM-15 |
12 |
0 |
7 |
Carrollton, KY |
Flood |
|
"1937 Flood At Carrollton, Kentucky - Inside Courthouse"; H50-FM-16 |
12 |
0 |
8 |
Cincinnati, OH |
Mill Creek Valley |
1/26/1937 |
Aerial view of Mill Creek Valley while flooded; H50-FM-17 |
12 |
0 |
8 |
Cincinnati, OH |
Flood |
|
"1937 FLD Cincinnati" (on back); H50-FO-17; aerial view of Cincinnati, Ohio while flooded |
12 |
0 |
9 |
Dayton, OH |
Flood |
|
"1913 Flood; Dayton, OHIO; 4th & Ludlow"; 50FM-5 |
12 |
0 |
10 |
Louisville, KY |
Flood |
4/23/1933 |
"Looking west from Cut-off Road [down] Fulton Street"; 50FO-8; #41-5 (on back); image includes houses and people on flooded streets |
12 |
0 |
10 |
Louisville, KY |
Flood |
4/23/1933 |
"Outer levee failure due to cinder road bed, necessitating construction"; 50FO-11; No. 41-7 (on back); image includes buildings and people on street |
12 |
0 |
10 |
Louisville, KY |
Flood |
4/23/1933 |
"Looking W. on River Road showing seepage due to cinder Road bed"; H50-FO-7; image includes houses, and car |
12 |
0 |
10 |
Louisville, KY |
Flood |
4/23/1933 |
"Looking west from Cut-off Road [down] Fulton Street"; H50-FO-8; image includes houses and people on flooded streets |
12 |
0 |
10 |
Louisville, KY |
Flood |
4/23/1933 |
"Outer levee failure due to cinder road bed, necessitating construction"; H50-FO-11; image includes buildings and people on street |
12 |
0 |
10 |
Louisville, KY |
Flood |
4/23/1933 |
"Looking W. on River Road showing seepage due to cinder Road bed"; 50FO-7; No. 41-2 (on back); image includes houses, and car |
12 |
0 |
10 |
Louisville, KY |
Flood |
4/23/1933 |
"Looking N. on Cut-off road, Cut-off Bridge in right background."; H50-FO-10; image includes houses, people, and Beargrass Creek |
12 |
0 |
10 |
Louisville, KY |
Flood |
4/23/1933 |
"Looking N. on Cut-off road, Cut-off Bridge in right background."; 50FO-10; No. 41-6 (on back); image includes houses, people, and Beargrass Creek |
12 |
0 |
11 |
Lawrenceburg, IN |
Flood |
2/3/1937 |
Aerial view of Lawrenceburg, Indiana while flooded; H50-FO-6 |
12 |
0 |
12 |
Ohio River Flood Crest |
Flood |
1/27/1937 |
"Upper GA 521 View N. Showing L&N RR Station And Yards - No. 19"; 50FO-1; is an aerial view of flooded Louisville |
12 |
0 |
12 |
Ohio River Flood Crest |
Flood |
1/27/1937 |
Aerial view of Louisville while flooded; 50FO-1; 19 (on back) |
12 |
0 |
12 |
Ohio River Flood Crest |
Flood |
1/27/1937 |
"View Looking North, New Albany, Ind. - No. 8"; 50FO-3501D |
12 |
0 |
13 |
Louisville, KY |
Flood |
|
Aerial view of Louisville while flooded; H50-FO-1 |
12 |
0 |
13 |
Louisville, KY |
Flood |
1/27/1937 |
"Upper GA 521 View N. Showing L&N RR Station And Yards - No. 19"; 50FO-1; is an aerial view of flooded Louisville |
12 |
0 |
13 |
Louisville, KY |
Flood |
|
"1937" (on back); Aerial view of Louisville while flooded; H50-FO-1 |
12 |
0 |
13 |
Louisville, KY |
Flood |
|
"1937; Flood; Louisville, KY"; H50-FO-2; is an aerial view of Louisville while flooded |
12 |
0 |
13 |
Louisville, KY |
Flood |
|
"1937; Flood; Louisville, KY"; H50-FO-2; is an aerial view of Louisville while flooded |
12 |
0 |
13 |
Louisville, KY |
Flood |
|
Aerial view of Louisville, KY while flooded; 50FO-31 |
12 |
0 |
13 |
Jeffersonville, IN |
Flood |
|
"12 March 19??; A floodwall Gate Is Checked At Jeffersonville, Ind."; 50FO-667; includes workers and a canoe |
12 |
0 |
14 |
Louisville, KY |
Flood |
1/26/1937 |
"Wide World Photo No. 864753…(Courier Journal & Louisville Times); Louisville Water Works During 1937 Flood"; 50FO-864753; E-175 (on back); is an aerial view of flooded Louisville |
12 |
0 |
14 |
Louisville (KY), Jeffersonville (IN), and Clarksville (IN) |
Flood |
|
"A Portion Of Unprotected Areas In Louisville, Kentucky, At Height Of 1937 Flood, With Jeffersonville And Clarksville, Indiana, In Background"; 50FO-5848; is an aerial view of flooded areas |
12 |
0 |
14 |
Louisville (KY), Jeffersonville (IN), and Clarksville (IN) |
Flood |
|
"A Portion Of Unprotected Areas In Louisville, Kentucky, At Height Of 1937 Flood, With Jeffersonville And Clarksville, Indiana, In Background"; 50FO-5848; is an aerial view of flooded areas |
12 |
0 |
15 |
Louisville, KY |
Flood |
2/9/1937 |
"L&N R.R. Freight Yards; #6"; H50-FO-3; view of flooded freight yards |
12 |
0 |
15 |
Louisville, KY |
Flood |
|
"'37 FLOOD; Lou, Ky.; Jefferson Street"; H50-FO-18; view of flooded street, including people, cars, and buildings |
12 |
0 |
16 |
Louisville, KY |
Flood |
|
"Fourth & Main During 1945 Flood"; 50FO-16485; E-175 (on back); small photo of city street during flood, including cars, buildings, and people |
12 |
0 |
16 |
Jeffersonville, IN |
Flood |
|
"Jeff., Ind. 37 Flood"; H50-FO-21; view of Jeffersonville, Indiana, during flood; includes buildings and men in canoe |
12 |
0 |
16 |
Louisville, KY |
Flood |
|
Aerial view of Louisville, KY while flooded; 50FO-31 |
12 |
0 |
17 |
Tell City, IN |
Flood |
|
"Tell City, Indiana, Unprotected At Height Of 1937 Flood"; 50FO-4; aerial view of Tell City while flooded |
12 |
0 |
17 |
Tell City, IN |
Flood |
|
"Tell City, Indiana, Unprotected At Height Of 1937 Flood"; H50-FO-4; aerial view of Tell City while flooded |
12 |
0 |
18 |
Tell City, IN |
Flood |
|
"Tell City, Indiana, Protected At Height Of 1945 Flood"; 50FO-5; aerial view of Tell City during flood |
12 |
0 |
18 |
Tell City, IN |
Flood |
|
"Tell City, Indiana, Protected At Height Of 1945 Flood"; H50-FO-5; aerial view of Tell City during flood |
12 |
0 |
18 |
Mill Creek |
Flood |
|
"Mill Creek; Barrier Dam; 1945 Flood"; H50-FM-12; view of city during flood |
12 |
0 |
19 |
Vincennes, IN |
Flood |
5/24/1943 |
"Vincennes During May 1943 Flood, Complete Inundation Of Russell & Allison Levee…; File No. 19007" (more description included); H50-FM-13; view of city while flooded |
12 |
0 |
20 |
Peru, IN |
Flood |
|
"South on Broadway Peru, Ind"; small postcard showing street while flooded |
12 |
0 |
20 |
Peru, IN |
Flood |
|
"West Second St. Peru, Ind."; small postcard showing street while flooded |
12 |
0 |
20 |
Peru, IN |
Flood |
|
"Corner of Post Office Peru"; small postcard showing street while flooded |
12 |
0 |
20 |
Unknown |
Flood |
|
Image of flooded street with two houses on it; 50FO-13; 66-10 |
12 |
0 |
20 |
Unknown |
Flood |
|
Image of flooded street with two houses on it; H50-FO-13; 66-10 |
12 |
0 |
20 |
Unknown |
Flood |
|
Image of flood taken from river brush with flooded city in background; H50-FO-14; 66-9 |
12 |
0 |
20 |
Unknown |
Flood |
|
Image of flood taken from river brush with flooded city in background; 50FO-14; 66-9 |
12 |
0 |
20 |
Unknown |
Flood |
|
Image of a bridge during a flood, with houses visible in background; H50-FO-15; 66-11 |
12 |
0 |
20 |
Unknown |
Flood |
|
Image of a bridge during a flood, with houses visible in background; 50FO-15; 66-11 |
12 |
0 |
20 |
Unknown |
Flood |
|
Image of flooded city street with boats and people in it; H50-FO-19 |
12 |
0 |
20 |
Unknown |
Flood |
|
Image of flooded city street with boats and people in it; H50-FO-19 |
12 |
0 |
20 |
Unknown |
Flood |
|
Image of flooded street with sandbags in it and houses in background; H50-FO-20; 66-1 |
12 |
0 |
20 |
Unknown |
Flood |
|
"1933 Flood Miscellaneous"; 50FO-20; 66-1; image of flooded street with sandbags in it and houses in background |
12 |
0 |
20 |
Unknown |
Flood |
|
Aerial view of flooded city; H50-FO-12 |
12 |
0 |
20 |
Cannelton, IN |
Flood |
|
Aerial view of flooded city; 50FO-26 |
12 |
0 |
20 |
Unknown |
Flood |
|
Image of flooded area with people in a boat and a structure visible; H50-FM-1A |
12 |
0 |
20 |
Unknown |
Flood |
|
Image of flooded area with people in a boat and a structure visible; H50-FM-1A |
12 |
0 |
20 |
Unknown |
Flood |
|
Aerial view of flooded city; 50FO-5848 |
12 |
0 |
20 |
Unknown |
Flood |
|
View of a gas station with cars around it; H50-FO-9 |
12 |
0 |
21 |
Elizabethtown, IN |
Dike |
10/7/1936 |
"Construction Of Back Channel Dike Between Plew And Hurricane Islands; Photo No. 3228" (more description included); H15-OM-18; image of dike with people at the end of it |
12 |
0 |
21 |
Elizabethtown, IN |
Dike |
10/7/1936 |
"Construction Of Back Channel Dike Between Plew And Hurricane Islands; Photo No. 3228" (more description included); H15-OM-18; image of dike with people at the end of it |
12 |
0 |
21 |
Elizabethtown, IN |
Dike |
10/7/1936 |
"Construction Of Back Channel Dike Between Plew And Hurricane Islands; Photo No. 3228" (more description included); H15-OM-18; image of dike with people at the end of it |
12 |
0 |
22 |
Ohio River |
Misc |
|
Image of a fallen tree in the river; H15-OM-88; OID #182 (on back) |
12 |
0 |
22 |
Ohio River |
Misc |
|
Image of framework on shore, including people; H15-OM-17 |
12 |
0 |
22 |
Ohio River - Paducah, KY |
Boom |
8/11/1921 |
"View across River from Sawmill showing Boom used to harbor logs.; Longstaff and Orm Lumber Co., Paducah, Kentucky"; H15-OM-30; P-O.R.-2 |
12 |
0 |
22 |
Ohio River |
Unloading Plant |
|
"Showing unloading plant and incline used in transferring sand and gravel from barges to storage bins on top of the bank"; H51-OM-31; includes workboats and canoes |
12 |
0 |
22 |
Ohio River |
Paddle Wheeler |
|
"Paddle Wheeler; Ohio River"; H15-OM-90; image of a steamship on the river |
12 |
0 |
22 |
Ohio River |
Misc Lock & Dam |
|
"Guide Wall"; image of a guide wall with a workboat in the background |
12 |
0 |
22 |
Ohio River |
Misc Lock & Dam |
|
"Guide Wall"; image of a guide wall with a workboat in the background |
12 |
0 |
22 |
Ohio River |
Misc Lock & Dam |
|
"Guide Wall"; H15-OM-87; image of a guide wall with a workboat in the background |
12 |
0 |
23 |
Ohio River - Madison, IN |
Ice Gorge |
2/28/1934 |
"Ice gorge, Ohio River, Madison, Indiana… Looking towards Kentucky."; H65-IO-4; barge included in photo |
12 |
0 |
23 |
Ohio River - Madison, IN |
Ice Gorge |
2/28/1934 |
"Ice gorge, Ohio River, Madison, Indiana… View of public landing and wharfboat."; H65-IO-5; barge and building included in photo |
12 |
0 |
23 |
Ohio River |
Ice Gorge |
|
Image of ice gorge closer up; H65-IO-7; 20-4-81 |
12 |
0 |
23 |
Ohio River |
Ice Gorge |
|
Image of ice gorge with bridge in photo; H65-IO-9A; 20-4-83 |
12 |
0 |
23 |
Ohio River - Lewisport, KY |
Ice Conditions |
2/20/1958 |
"Looking upstream showing Ohio River ice conditions at Lewisport, Kentucky.; File No. 30308"; H65-IO-12 |
12 |
0 |
23 |
Ohio River - Lewisport, KY |
Ice Conditions |
2/20/1958 |
"Looking upstream showing Ohio River ice conditions at Lewisport, Kentucky.; File No. 30308"; H65-IO-12 |
12 |
0 |
23 |
Ohio River - Cloverport, KY |
Ice Conditions |
2/20/1958 |
"Looking upstream from Cloverport, Kentucky showing Ohio River ice conditions.; File No. 30310"; H65-IO-13 |
12 |
0 |
23 |
Ohio River - Cloverport, KY |
Ice Conditions |
2/20/1958 |
"Looking upstream from Cloverport, Kentucky showing Ohio River ice conditions.; File No. 30310"; H65-IO-13 |
12 |
0 |
23 |
Ohio River - Between Hawesville (KY) and Cloverport (KY) |
Ice Conditions |
2/20/1958 |
"Looking upstream between Hawesville, Kentucky and Cloverport, Kentucky showing Ohio River ice conditions.; File No. 30311"; H65-IO-14 |
12 |
0 |
23 |
Ohio River - Between Hawesville (KY) and Cloverport (KY) |
Ice Conditions |
2/20/1958 |
"Looking upstream between Hawesville, Kentucky and Cloverport, Kentucky showing Ohio River ice conditions.; File No. 30311"; H65-IO-14 |
12 |
0 |
23 |
Ohio River - Between Hawesville (KY) and Cloverport (KY) |
Ice Conditions |
2/20/1958 |
"Looking upstream between Hawesville, Kentucky and Cloverport, Kentucky showing Ohio River ice conditions.; File No. 30311"; H65-IO-14 |
12 |
0 |
23 |
Ohio River - Cloverport, KY |
Ice Conditions |
2/20/1958 |
"Looking downstream from Cloverport, Kentucky showing Ohio River ice conditions.; File No. 30309"; H65-IO-15 |
12 |
0 |
23 |
Ohio River - Cloverport, KY |
Ice Conditions |
2/20/1958 |
"Looking downstream from Cloverport, Kentucky showing Ohio River ice conditions.; File No. 30309"; H65-IO-15 |
12 |
0 |
23 |
Ohio River - Cloverport, KY |
Ice Conditions |
2/20/1958 |
"Looking downstream from Cloverport, Kentucky showing Ohio River ice conditions.; File No. 30309"; H65-IO-15 |
12 |
0 |
23 |
Ohio River - Madison, IN |
Ice Gorge |
2/28/1934 |
"Ice gorge, Ohio River, Madison, Ind… View looking up stream."; H16-IO-16 |
12 |
0 |
23 |
Ohio River - Madison, IN |
Ice Gorge |
2/28/1934 |
"Madison, Indiana… View of Ice Gorge"; H65-IO-16 |
12 |
36 |
23 |
Ohio River |
Dam 36 |
2/9/1934 |
"Ice pushed maneuver boat over wickets, unable to return and throw same."; H65-IO-17 |
12 |
0 |
23 |
Ohio River - Madison, IN |
Ice Gorge |
2/28/1934 |
"Ice gorge, Ohio River, Madison, Ind… View showing ice lodged around bridge piers."; H65-IO-18 |
12 |
0 |
23 |
Ohio River - Hanover, IN |
Ice Gorge |
2/28/1934 |
"Ice gorge, Ohio River… View looking west, taken from campus of Hanover College, Hanover, Ind."; H65-IO-20; houses visible at bottom of hill |
12 |
0 |
23 |
Ohio River |
Ice Conditions |
2/20/1958 |
"Looking upstream from Markland Lock Coffer Dam showing Ohio River ice conditions.; File No. 30360"; H65-IO-21 |
12 |
0 |
23 |
Ohio River - Hanover, IN |
Ice Conditions |
2/20/1958 |
"Looking downstream from Hanover, Indiana showing Ohio River ice conditions.; File No. 30348"; H65-IO-22; village visible at bottom of hill |
12 |
0 |
23 |
Ohio River - Madison, IN |
Ice Conditions |
2/20/1958 |
"Ohio River ice conditions at Madison, Indiana.; File No. 30340"; H65-IO-23 |
12 |
0 |
23 |
Ohio River - Madison, IN |
Ice Conditions |
2/20/1958 |
"Ohio River ice conditions at Madison, Indiana.; File No. 30339"; H65-IO-24 |
12 |
0 |
23 |
Ohio River |
Ice Conditions |
2/20/1958 |
"Allied Ashland harbored in Kentucky River due to Ohio River ice conditions.; File No. 30356"; H65-IO-25; includes boat in shot |
12 |
0 |
23 |
Ohio River |
Ice Conditions |
2/20/1958 |
"Looking upstream from Beargrass Creek showing Ohio River ice conditions.; File No. 30362"; H65-IO-26 |
12 |
0 |
23 |
Ohio River - Madison, IN |
Ice Conditions |
2/20/1958 |
"Looking upstream from Madison, Indiana bridge showing Ohio River ice conditions.; File No. 30352"; H65-IO-27 |
12 |
0 |
23 |
Ohio River |
Ice Gorge |
1/28/1893 |
"Ice gorge above Four-Mile Bar above Cincinnati; H65-IO-3 |
12 |
0 |
25 |
Ohio River |
Bridge |
8/13/1930 |
"1407; Ohio River Bridge; Brookport - Paducah, KY."; H45-BM-18; shows rail lines with bridge in background |
12 |
0 |
25 |
Ohio River |
Bridge |
8/13/1930 |
"1407; Ohio River Bridge; Brookport - Paducah, KY."; H45-BM-18; shows rail lines with bridge in background |
12 |
0 |
25 |
Ohio River |
Bridge |
8/13/1930 |
"1408; Ohio River Bridge; Metropolis, Ill.; I.C.R.R."; H45-BM-9; shows rail lines with bridge in background |
12 |
0 |
25 |
Ohio River |
Bridge |
8/13/1930 |
"1408; Ohio River Bridge; Metropolis, Ill.; I.C.R.R."; H45-BM-9; shows rail lines with bridge in background |
12 |
0 |
25 |
Ohio River |
Bridge |
8/23/1930 |
"1398; Ohio River Bridge; Henderson, Ky.; L&N R.R."; H45-BM-16; shows boats in river and bridge |
12 |
0 |
25 |
Ohio River |
Bridge |
8/23/1930 |
"1398; Ohio River Bridge; Henderson, Ky.; L&N R.R."; H45-BM-16; shows boats in river and bridge |
12 |
0 |
25 |
Ohio River |
Bridge |
|
Image of a bridge; H45-BM-24 |
12 |
0 |
24 |
Ohio River |
Bank Conditions |
10/23/1939 |
"Revetment of Indiana bank opposite Uniontown, Ky. View of caving bank looking upstream from approximate Station 43+00… File 4413" (more description included); H15-OM-54; is a picture of a bank |
12 |
0 |
24 |
Ohio River |
Bank Conditions |
10/23/1939 |
"Revetment of Indiana bank opposite Uniontown, Ky. View of caving bank looking upstream from approximate Station 50+00… File 4414" (more description included); H15-OM-53; is a picture of a bank |
12 |
0 |
24 |
Ohio River |
Bank Conditions |
11/24/1948 |
"Bank Revetment, Camp Breckenridge Collector Well, Hired Labor Job, W.O. 388-49.; Looking upstream from Station 0 + 00 showing nearly completed riprap.; File No. 22306"; H15-OM-20; photo of bank rocks and workboat, with cars and people in background |
12 |
0 |
24 |
Ohio River |
Bank Conditions |
11/24/1948 |
"Bank Revetment, Camp Breckenridge Collector Well, Hired Labor Job, W.O. 388-49.; Looking upstream from Station 0 + 00 showing nearly completed riprap.; File No. 22306"; H15-OM-20; photo of bank rocks and workboat, with cars and people in background |
12 |
0 |
24 |
Ohio River |
Bank Conditions |
11/15/1940 |
"View of completed paving and grading downstream from Sta. 99+75 to lower end of project at Sta. 106+00.; 5863 (on back); Henderson Revit."; H15-OM-40; photo of bank rocks with workboat visisble in background |
12 |
0 |
24 |
Ohio River |
Bank Conditions |
11/28/1939 |
"Revetment of Indiana bank opposite Uniontown, Kentucky. Partially completed revetment looking upstream from Station 10+00... File 4561" (more description included); H15-OM-9; photo of bank rocks |
12 |
0 |
24 |
Ohio River |
Bank Conditions |
12/18/1939 |
"Revetment of Indiana bank opposite Uniontown, Kentucky. Completed revetment. Station 50-00 to 55-00... File 4678" (more description included); H15-OM-8; photo of bank rocks, with boat in background |
12 |
0 |
24 |
Ohio River |
Bank Conditions |
10/23/1939 |
"Revetment of Indiana bank opposite Uniontown, Kentucky. View of caving bank looking downstream from approximate Station 74+00, prior to construction of revetment... File 4411" (more description included); H15-OM-7 |
12 |
0 |
24 |
Ohio River |
Bank Conditions |
9/29/1939 |
"Revetment of Indiana bank opposite Uniontown, Kentucky. View of caving bank looking downstream from approximate Station 19+00, prior to construction of revetment... File 4329" (more description included); H15-OM-6; photo of bank with a dock |
12 |
0 |
24 |
Ohio River |
Bank Conditions |
12/18/1939 |
"Revetment of Indiana bank opposite Uniontown, Kentucky. Completed revetment Station 0-00 to 5-00. Paving partially covered with spoil... File 4668"; H15-OM-5; photo of river bank |
12 |
0 |
24 |
Ohio River |
Bank Conditions |
11/28/1938 |
"Revetment of Indiana bank opposite Uniontown, Kentucky. Old ferry landing at Station 20+00... File 4562"; H15-OM-4; photo of river bank, including a partially built dock |
12 |
0 |
24 |
Ohio River |
Bank Conditions |
12/18/1939 |
"Revetment of Indiana bank opposite Uniontown, Kentucky. View of completed revetment from Uniontown ferry landing... Files 4688-4687-4686" (more description included); H15-OM-3; large panoramic photo of bank, including two houses and a boat |
12 |
0 |
24 |
Ohio River |
Bank Conditions |
12/18/1939 |
"Revetment of Indiana bank opposite Uniontown, Kentucky. Completed revetment. Station 45+00 to 50+00... File 4677" (more description included); H15-OM-1; photo of river bank, including houses, people, and a horse on bank |
12 |
0 |
24 |
Ohio River |
Bank Conditions |
12/18/1939 |
"Revetment of Indiana bank opposite Uniontown, Kentucky. Completed revetment. View of bank below revetment opposite Station 87+50... File 4684" (more description included); H15-OM-2; photo of a river bank |
12 |
0 |
24 |
Ohio River |
Bank Conditions |
|
"Cannelton Pool Feb 1914; Approximate Ohio River Mile 664"; 15M-104 (on back); picture of a river bank |
12 |
0 |
24 |
Ohio River |
Bank Conditions |
|
"Cannelton Pool Feb 1914; Approximate Ohio River Mile 664"; 15M-105 (on back); picture of a river bank |
12 |
0 |
24 |
Ohio River |
Bank Conditions |
|
"Cannelton Pool Feb 1914; Approximate Ohio River Mile 664"; 15M-106 (on back); picture of a river bank, including wooden structures on bank |
12 |
0 |
24 |
Ohio River |
Bank Conditions |
|
"Cannelton Pool Feb 1914; Approximate Ohio River Mile 664"; 15M-107 (on back); picture of a river bank |
12 |
0 |
24 |
Ohio River |
Bank Conditions |
|
"Cannelton Pool Feb 1914; Approximate Ohio River Mile 664"; 15M-108 (on back); picture of a river bank |
12 |
0 |
24 |
Ohio River |
Bank Conditions |
|
"Gallipolis Pool After 1937 Flood at Gallipolis; Approximate Ohio River Mile 720"; 15M-110 (on back); picture of a river bank |
12 |
0 |
24 |
Ohio River |
Bank Conditions |
12/18/1939 |
"Revetment of Indiana bank opposite Uniontown , Kentucky. View of bank above revetment Station 0+00 to 5+00 A... File 4667" (more description included); H15-OM-55; picture of a river bank taken from river, with house visible in background |
12 |
0 |
24 |
Ohio River |
Bank Conditions |
9/29/1939 |
"Revetment of Indiana bank opposite Uniontown , Kentucky. View of caving bank looking downstream from approximate Station 40+00, prior to construction of revetment... File 4336" (more description included); H15-OM-56; picture of a river bank |
12 |
0 |
24 |
Ohio River |
Bank Conditions |
9/29/1939 |
"Revetment of Indiana bank opposite Uniontown , Kentucky. View looking downstream from approximate Station 5+50, showing bank with rough grading partly completed... File 4332" (more description included); H15-OM-57; picture of a river bank and crane |
12 |
0 |
24 |
Ohio River |
Bank Conditions |
9/29/1939 |
"Revetment of Indiana bank opposite Uniontown , Kentucky. View of caving bank looking downstream from approximate Station 48+00, prior to construction of revetment... File 4330" (more description included); H15-OM-58; picture of a river bank |
12 |
0 |
24 |
Ohio River |
Bank Conditions |
9/29/1939 |
"Revetment of Indiana bank opposite Uniontown , Kentucky. View of caving bank looking downstream from approximate Station 35+00, prior to construction of revetment... File 4334" (more description included); H15-OM-59; picture of a river bank |
12 |
0 |
24 |
Ohio River |
Bank Conditions |
9/29/1939 |
"Revetment of Indiana bank opposite Uniontown , Kentucky. View of caving bank looking downstream from approximate Station 27+00, prior to construction of revetment... File 4331" (more description included); H15-OM-60; picture of a river bank |
12 |
0 |
24 |
Ohio River |
Bank Conditions |
12/18/1939 |
"Revetment of Indiana bank opposite Uniontown , Kentucky. Completed revetment. Station 15+00 to 20+00... File 4671" (more description included); H15-OM-61; picture of a river bank |
12 |
0 |
24 |
Ohio River |
Bank Conditions |
12/18/1939 |
"Revetment of Indiana bank opposite Uniontown , Kentucky. Completed revetment. Station 40+00 to 45+00... File 4676" (more description included); H15-OM-62; picture of a river bank |
12 |
0 |
24 |
Ohio River |
Bank Conditions |
12/18/1939 |
"Revetment of Indiana bank opposite Uniontown , Kentucky. Completed revetment. Station 25+00 to 30+00... File 4673" (more description included); H15-OM-63; picture of a river bank |
12 |
0 |
24 |
Ohio River |
Bank Conditions |
12/18/1939 |
"Revetment of Indiana bank opposite Uniontown , Kentucky. Completed revetment. Station 10+00 to 15+00... File 4670" (more description included); H15-OM-64; picture of a river bank and house |
12 |
0 |
24 |
Ohio River |
Bank Conditions |
11/15/1940 |
Henderson Revet; View of completed protection to ditch at Sta. 87+25; 5865; H15-OM-65; picture of bank rocks with dock visible in corner of photo |
12 |
0 |
24 |
Ohio River |
Bank Conditions |
|
Photo of riprap and shore line, with ships visible in background; H15-OM-66; 5864 (on back) |
12 |
0 |
24 |
Ohio River |
Bank Conditions |
|
Photo of shoreline with barge and dock in background; H15-OM-67; 5866 (on back) |
13 |
0 |
1 |
Cincinnati, OH |
Floating Plant |
7/10/1941 |
"Launch Olive; Length 32'-0" Beam 7'-2" Depth 4'-6""; 40VF-31; picture of a boat |
13 |
0 |
1 |
Cincinnati, OH |
Floating Plant |
7/10/1941 |
"Launch Olive; Length 32'-0" Beam 7'-2" Depth 4'-6""; 40VF-31; picture of a boat |
13 |
0 |
1 |
Cincinnati, OH |
Floating Plant |
7/10/1941 |
"Floating Garage No. 3; Length 62'-6" Beam 25'-7" Depth 3'-0""; 40FV-32; picture of a boat |
13 |
0 |
1 |
Unknown |
Dredge |
|
"Dredge H.S. Taber"; 40VF-38; No. 39A; picture of a boat |
13 |
0 |
1 |
Unknown |
Dredge |
|
"Dredge H.S. Taber"; 40VF-38; No. 39A; picture of a boat |
13 |
0 |
1 |
Louisville, KY |
Floating Plant |
6/28/1946 |
"Floating Plant, Maneuver Boat L.D. No. 311 and Motor Launch "Shawnee", Cincinnati District, in drydock at Louisville Sub-Office for repairs.; File No. 18843"; 40VF-48; picture of a boat with two others in background |
13 |
0 |
1 |
Louisville, KY |
Floating Plant |
6/28/1946 |
"Floating Plant, Motor Launch "Shawnee", Cincinnati District, and Maneuver Boat L.D. No. 311 in drydock at Louisville Sub-Office... (illegible); File No. 18841"; 40VF-49; picture of a boat with others in background |
13 |
0 |
1 |
Cincinnati, OH |
Floating Plant |
8/1/1939 |
"Derrickboat No. 6; Length 74'-0" Beam 34'-0" Depth 5'-0"; 9"; 40VF-50; picture of a boat, including people on the dock |
13 |
0 |
1 |
Cincinnati, OH |
Floating Plant |
11/22/1934 |
"Maneuverboat No. 37-A; Length 78'-0" Beam 24'-0" Depth 4'-6"; 62"; 40VF-51; picture of a boat, including people on it and a roped up canoe |
13 |
0 |
1 |
Ohio River |
Floating Plant |
7/30/1890 |
"Floating Plant . Maneuver Boat.; File No. 22573"; 40VM-2; picture of a boat with men on it |
13 |
0 |
1 |
Ohio River |
Floating Plant |
7/30/1890 |
"Floating Plant . Maneuver Boat.; File No. 22573"; 40VM-2; picture of a boat with men on it |
13 |
0 |
1 |
Unknown |
Dredges |
|
"1893 - Engineer Dipper Dredges, Dredging Channel"; 40VM-16; 22571 (on back); picture of three dredges in channel |
13 |
0 |
1 |
Cumberland River |
Steamboat |
|
"Packet Boat Era; Steamboat Golden Eagle enroute upstream on the Cumberland River"; H40-VM-33; faded picture of a steamboat with people on it |
13 |
0 |
1 |
Unknown |
Steamboat |
|
""Tornado" High and Dry"; 40VM-35; picture of a steamboat |
13 |
0 |
1 |
Louisville, KY |
Floating Plant |
6/28/1946 |
""Shawnee" in Drydock"; H40-VF-48; picture of a boat with two others in background |
13 |
0 |
1 |
Unknown |
Boats |
|
Picture of two men talking in the steering room of a vessel; H40-VM-75 |
13 |
0 |
1 |
Unknown |
Drydocks |
|
Picture of drydocks, including people in shot; H40-VM-76 |
13 |
0 |
1 |
Unknown |
Drydocks |
|
Picture of drydocks, including people in shot; H40-VM-76 |
13 |
46 |
1 |
Owensboro, KY |
Boat |
|
"The "Sprague"; Lock & Dam 46; Owensboro, KY"; H40-VM-108; picture of a boat |
13 |
46 |
1 |
Owensboro, KY |
Boat |
|
"The "Sprague"; Lock & Dam 46; Owensboro, KY"; H40-VM-108; picture of a boat |
13 |
46 |
1 |
Owensboro, KY |
Boat |
|
"The "Sprague"; Lock & Dam 46; Owensboro, KY"; H40-VM-108; picture of a boat |
13 |
46 |
1 |
Owensboro, KY |
Boat |
|
"The "Sprague"; Lock & Dam 46; Owensboro, KY"; H40-VM-108; picture of a boat |
13 |
0 |
1 |
Owensboro, KY |
Boat |
|
"The "Sprague"; H40-VM-110; picture of a boat |
13 |
0 |
1 |
Unknown |
Boat Sinking |
9/27/1917 |
Picture of the "Shawnee" sinking while being aided by two workboats |
13 |
0 |
1 |
Unknown |
Boat Sinking |
9/27/1917 |
Picture of the "Shawnee" sinking while being aided by two workboats |
13 |
37 |
1 |
Ohio River |
Dam 37 |
|
"Plate No. 8"; picture of Maneuver Boat on Dam 37, with people working on it |
13 |
0 |
1 |
Unknown |
Dredging |
|
"1902 - Engineer Dredge "Indiana" Dredging Channel"; 40VF-22556; shows dregding and workers |
13 |
0 |
1 |
Unknown |
Boats |
|
"Case No. 2; Plate No. 13"; H16-OLP-52; shows two ships docked |
13 |
0 |
1 |
Unknown |
Towboat |
11/22/1943 |
"Towboat "Wm Penn""; H40-VO-27A; picture of a towboat with another one in the background |
13 |
0 |
1 |
Unknown |
Louisville Boat Club House |
|
"Louisville Boat Club House"; picture of boat club house with people in front of it next to a roped up gondola |
13 |
0 |
2 |
Unknown |
Boats |
|
Photo of workboat "Lucien S. Johnson", with other boats around it; H40-VO-58 |
13 |
46 |
2 |
Owensboro, KY |
Lock & Dam 46 |
|
"C. 1950; the "Sprague"; L&D 46; Owensboro, KY"; H40-VO-108; picture of a boat |
13 |
0 |
2 |
Unknown |
Boat |
|
Picture of a workboat that appears to be sinking, with rafts filled with rocks in the foreground; 40VO-111; No. 17 (on back) |
13 |
0 |
2 |
Unknown |
Boat |
10/21/1931 |
Picture of boat "Orpaso" with man in it; 40VF-1495 |
13 |
0 |
2 |
Ohio River |
Floating Plant |
7/27/1939 |
"Floating Plant - Towboat (Steam) "OTTAWA" No. 422; File 3935"; 40VO-3935 |
13 |
0 |
2 |
Ohio River |
Derrick |
7/16/1889 |
"Unloading logs from barge by derrick.; File No. 22557"; 40VO-22557; photo includes workers, horse, cart, barge, and two workboats |
13 |
0 |
2 |
Ohio River |
Dredging |
9/6/1932 |
"American Aggregate Corp.; Dredging Outfit; Vevay Bar; Ohio River"; H40-VO-51; shows dredge in middle of river |
13 |
0 |
2 |
Ohio River |
Dredging |
9/6/1932 |
"Old River Dredge; American Aggregate Corp.; Dredging Outfit; Vevay Bar; Ohio River"; H40-VO-52A; shows dredge in middle of river; shows dredge in river, and includes workers, and houses visible in background |
13 |
0 |
2 |
Unknown |
Boat Sinking |
9/27/1917 |
Picture of the "Shawnee" sinking while being aided by two workboats; H40-VO-3 |
13 |
0 |
2 |
Ohio River |
Misc. Tows |
7/8/1947 |
"M/V Commercial Express downbound at Louisville with 487 motor vehicles from Cincinnati, Ohio to Memphis, Tenn. Overall length 525 feet.; File No. 20222"; H40-VO-9; picture of ship with cars on it, with bridge in background |
13 |
0 |
2 |
Unknown |
Towboat |
3/25/1955 |
"Aetna" Picture of towboat "Aetna - Louisville" in river with bridge and houses in background; H40-VO-17C |
13 |
0 |
2 |
Unknown |
Boat |
|
Photo of a workboat with people on it and another workboat behind it; H40-VO-60 |
13 |
0 |
2 |
Unknown |
Barge |
|
Photo of a docked barge; "31"; H40-VO-61 |
13 |
39 |
2 |
Ohio River |
Maneuverboat |
6/5/1951 |
"Maneuverboat No. 39-A.; File No. 25513"; H40-VO-62; picture of docked maneuver boat with lock house in background |
13 |
0 |
2 |
Ohio River |
Misc. Tows |
7/9/1947 |
"Barge in tow of "Sohio Fleetwing" on end of lower guide wall at Lock 49... File No. 20390" (more description included); H40-VO-64; picture shows close up shot of accident site with man in background |
13 |
0 |
2 |
Ohio River |
Misc. Tows |
7/9/1947 |
"Barge in tow of "Sohio Fleetwing" on end of lower guide wall at Lock 49... File No. 20389" (more description included); H40-VO-65; picture shows accident site |
13 |
0 |
2 |
Ohio River |
Misc. Tows |
7/9/1947 |
"Barge in tow of "Sohio Fleetwing" on end of lower guide wall at Lock 49... File No. 20391" (more description included); H40-VO-66; picture shows men walking around accident site |
13 |
0 |
2 |
Unknown |
Boat |
|
Photo shows workboat against dam, with workers facing camera; H40-VO-67 |
13 |
0 |
2 |
Ohio River |
Boat |
4/11/1934 |
Picture of the towboat "? Rumsey" with people on it; H40-VO-69 |
13 |
0 |
2 |
Unknown |
Boat |
7/21/1952 |
"MV Ernest Weir"; H40-VO-22; picture of what looks like a towboat in a river |
13 |
0 |
2 |
Ohio River |
Towboat |
6/27/1942 |
"Towboat "Campbell" coming downstream from Lock 41, Ohio River, with 9 barges, 1 loaded with fuel and 3 with steel.; File No. 8717"; H40-VO-26 |
13 |
0 |
2 |
Ohio River |
Misc Tows |
11/22/1943 |
"View showing Towboat "Wm. Penn" towing 13 barges carrying mixed cargo.; File No. 14015"; H40-VO-27 |
13 |
34 |
2 |
Ohio River |
Lock 34 |
|
View of lock construction including workboat, materials, and machinery; H16-034-20; 34-97 (on back) |
13 |
0 |
2 |
Unknown |
Boat |
3/6/1952 |
"Monongahela"; H40-VO-49B; photo of a ship with cars visible in foreground |
13 |
0 |
2 |
Greenville, OH |
Suction Dredge |
8/21/1933 |
"Section Dredge Columbus of The American Aggregates Corp. Greenville Ohio.; Dredging at Rising Sun, Indiana Bar."; H40-VO-55 |
13 |
0 |
2 |
Ohio River |
Dredging |
9/6/1932 |
"American Aggregate Corp.; Dredging Outfit; Vevay Bar; Ohio River"; H40-VO-52; A-33 |
13 |
0 |
2 |
Ohio River |
Dredging |
9/6/1932 |
"American Aggregate Corp.; Dredging Outfit; Vevay Bar; Ohio River"; H40-VO-50; A-32; picture of a dredge with workers on it |
13 |
0 |
2 |
Unknown |
Ferry |
|
Picture of people on the boat "Ferry"; H40-VO-7 |
13 |
0 |
2 |
Unknown |
Workboat |
|
Photo shows workboat against dam, with workers on it; H40-VO-68 |
13 |
0 |
2 |
Cincinnati, OH |
Towboat |
12/20/1939 |
"Diesel Tow Boat - Lucien S. Johnson - Stern View..." (more description included); H40-VO-59; shows stern side of towboat up close |
13 |
0 |
2 |
Cincinnati, OH |
Towboat |
12/20/1939 |
"Diesel Tow Boat - Lucien S. Johnson - Broadside..." (more description included); H40-VO-56; shows towboat from the side while on land |
13 |
0 |
2 |
Cincinnati, OH |
Towboat |
1/6/1940 |
"Diesel Tow Boat - Lucien S. Johnson - Broadside..." (more description included); H40-VO-57; shows towboat from the side while in the river |
13 |
0 |
3 |
Unknown |
Motorboat |
|
Small photo of a man driving a motorboat; H40-VO-77 |
13 |
0 |
3 |
Unknown |
Motorboat |
|
Small photo of men driving a motorboat; H40-VO-76 |
13 |
0 |
3 |
Unknown |
Motorboat |
|
Small photo of men driving a motorboat, with other boats and structures in the background; H40-VO-78 |
13 |
0 |
3 |
Pittsburgh, PA |
Derrickboat |
8/5/1939 |
"Derrickboat No. 2; No. 15231; H40-VM-13A; picture of derrickboat with dwellings visible in background |
13 |
0 |
3 |
Pittsburgh, PA |
Derrickboat |
8/5/1939 |
Picture of Derrickboat No. 2, with dwellings visible in background; 40VM-13; H13-6 (on back) |
13 |
0 |
3 |
Unknown |
Dredge |
2/6/1946 |
"Dredge Omega"; 40VM-14; H13-7 (on back); picture of a dredge, with people on it |
13 |
0 |
3 |
Unknown |
Workboats |
1/13/1942 |
"U.S. Engineer Fleet at Fernbank"; H40-VM-8A; picture of several workboats and barges during winter |
13 |
0 |
3 |
Unknown |
Snagboat |
|
"1889; Snagboat "E.A. Woodruff"; 28017"; 40VM-15; picture of a snagboat pulling something out of the water, with people aiding |
13 |
0 |
3 |
Unknown |
Stock Barge |
2/6/1946 |
"U.S. Stock Barge "No. 2114" loaded for towing to Cincinnati District"; H40-VM-22; photo is of the stock barge with people on it |
13 |
0 |
3 |
Fort Point Repair Yard |
Stock Barge |
2/6/1946 |
"U.S. Stock Barge "No. 2114" under tow of U.S. Tug "Wilcox" leaving Fort Point Repair Yard"; H40-VM-23; shows stock barge being towed |
13 |
0 |
3 |
Unknown |
Towboat & Barges |
|
Picture of towboat pulling barges with other boat in background; H40-VM-25 |
13 |
0 |
3 |
Unknown |
Towboat & Barges |
|
Picture of towboat pulling barges with other boat in background; H40-VM-25 |
13 |
0 |
3 |
Unknown |
Towboat & Barges |
|
Picture of towboat pulling barges with other boat in background; H40-VM-25 |
13 |
0 |
3 |
Unknown |
Towboat & Barges |
|
Picture of towboat pulling barges; H80-VM-26 |
13 |
0 |
3 |
Unknown |
Towboat & Barges |
|
Picture of towboat pulling barges; H80-VM-26 |
13 |
0 |
3 |
Unknown |
Towboat & Barges |
|
Picture of towboat pulling barges; H80-VM-26 |
13 |
0 |
3 |
Unknown |
Workboat |
|
Picture of two workboats, one the "U.S. Edna"; H40-VM-27 |
13 |
0 |
3 |
Unknown |
Boat |
3/10/1923 |
"Str. Mammoth Cave"; H40-VM-30; picture of a ship with people on it, and a bridge in the background |
13 |
0 |
3 |
Unknown |
Ship |
|
"Gordon C. Greene"; H40-VM-31; partially blurry picture of the ship "Gordon C. Greene" with people on it |
13 |
0 |
3 |
Pittsburgh, PA |
Ship |
1/26/1929 |
"Towboat 'George S. Nutt'; 5372"; H40-VM-40; picture of ship "George S. Nutt" with buildings visible in background |
13 |
0 |
3 |
Unknown |
Lock |
|
Picture of lock with supplies in it; H40-VM-46 |
13 |
0 |
3 |
Unknown |
Towboat & Barges |
|
Picture of towboat pulling barges, with people in photo, and other workboats visible in background; H40-VM-47 |
13 |
0 |
3 |
Unknown |
Ships |
|
Picture of ship "Vesta" with a lot of smoke coming from it, with another ship visible in background; H40-VM-49 |
13 |
0 |
3 |
Unknown |
Ships |
|
Picture of ship with a lot of smoke coming from it, with another ship visible in background; H40-VM-50 |
13 |
0 |
3 |
Unknown |
Sheffield Boat |
|
Picture of several workboats; H40-VM-51; 151 (on back) |
13 |
0 |
3 |
Unknown |
Workboat |
|
Picture of workboat "Col. M.B. Adams" with boats, barges, and houses visible in background; H40-VM-52; 1315 (on back) |
13 |
0 |
3 |
Unknown |
Boat Sinking |
9/27/1917 |
Picture of the boat "Shawnee" sinking while being aided by other boats; H40-VO-53 |
13 |
0 |
3 |
Unknown |
Towboat |
|
Blurry picture of a towboat with people on it; H40-VM-53 |
13 |
0 |
3 |
Unknown |
Workboat |
|
Faded picture of a workboat at work; H40-VM-54 |
13 |
0 |
3 |
Unknown |
Workboat & Riprap |
|
Faded picture of a workboat next to riprap; H40-VM-57; 191 (on back) |
13 |
0 |
3 |
Colbert Shoals |
Workboat |
|
"Colbert Shoals Canal Lock"; H40-VM-59; 183 (on back); picture of workboat with men on it |
13 |
0 |
3 |
Unknown |
Ship |
|
"the "Delta Queen""; H40-VM-74; picture of ship "Delta Queen" |
13 |
0 |
3 |
Unknown |
Boat |
|
Picture of two men talking in the steering room of a vessel; H40-VM-75 |
13 |
0 |
3 |
Unknown |
Drydocks |
|
Picture of workers beside drydock; H40-VM-76 |
13 |
0 |
4 |
Lock |
Ship |
|
Picture of lock in operation, with ship in lock chamber; H40-VM-77 |
13 |
0 |
4 |
Ohio River |
Motor Vessel |
|
"Motor Vessel "PHILIP SPORN" upbound on the Ohio River with 30 barges of coal"; H40-VM-80 |
13 |
0 |
4 |
Unknown |
Workboat |
|
Picture of a workboat with people on it; H40-VM-79 |
13 |
0 |
4 |
Kanawha River |
Winfield Locks & Dam |
8/16/1977 |
"Tow & Barges In Lock Chamber"; H40-VM-81; picture of ship in lock chamber with people on ship and lock walls |
13 |
0 |
4 |
Kanawha River |
Winfield Locks & Dam |
8/16/1977 |
"Dredge Discharge Pipeline"; H40-VM-82; shows worker at end of pipeline with ships in background |
13 |
0 |
4 |
Kanawha River |
Winfield Locks & Dam |
8/16/1977 |
""Business-End" Of Cutter Head Dredge"; H40-VM-83; head on shot of cutter head on dredge |
13 |
0 |
4 |
Kanawha River |
Winfield Locks & Dam |
8/16/1977 |
"Workmen Breaking Dredge Discharge Pipe"; H40-VM-84 |
13 |
0 |
4 |
Kanawha River |
Winfield Locks & Dam |
8/16/1977 |
Picture of a worker sitting; H40-VM-85 |
13 |
0 |
4 |
Unknown |
Towboat & Barges |
|
Picture of towboat pulling barges, with houses visible in background; H40-VM-86 |
13 |
0 |
4 |
Unknown |
Towboat & Barges |
|
Picture of towboat pulling barges, with machinery and boats visible in background; H40-VM-87 |
13 |
0 |
4 |
Unknown |
Towboat & Barges |
|
Picture of towboat pulling barges; H40-VM-88; 60-30-3 (on back); "River Scenes 1" (on back) |
13 |
0 |
4 |
Unknown |
Towboat & Barges |
|
"Sprague"; H40-VM-109; picture of towboat "Sprague" pulling barges |
13 |
0 |
4 |
Ohio River |
Workboat |
4/11/1934 |
Picture of workboat "James Rumsey" with other boats and houses in background; H40-VM-45 |
13 |
0 |
4 |
Ohio River |
Workboat |
|
Picture of workboat "James Rumsey" with other boats and houses in background; H40-VM-44 |
13 |
0 |
4 |
Unknown |
Workboat |
|
"the "Sprague""; H40-VM-110; picture of the "Sprague" with barge and boat in foreground, both labeled "Union Barge Line" |
13 |
0 |
4 |
Nashville, TN |
Towboat |
10/25/1935 |
"Towboat "John C. Irwin" (Diesel).; No. 8144"; H40-VM-44; shows towboat with people on it |
13 |
0 |
4 |
Unknown |
Towboat & Barges |
|
Picture of towboat "Grafton" pulling a large number of barges; H40-VM-78 |
13 |
0 |
4 |
Unknown |
Snagboat |
|
"Snagboat "R.E. DeRussy"...Photo No. 77-HCS-133 F-2; Used in "A History of the Louisville District COE US Army.," p. 116"; H40-VM-73 |
13 |
0 |
4 |
New Albany, IN |
Snagboat |
12/20/1867 |
"Snagboat "R.E. DeRussy"...Photo No. 77-HCS-133 F-1; Used in "A History of the Louisville District COE US Army.," p. 117"; H40-VM-72 |
13 |
0 |
4 |
Unknown |
Steamship |
|
Picture of the steamship "Beaver" with two other steamships beside it; H40-VM-58 |
13 |
0 |
4 |
Unknown |
Drillboat |
|
"Drillboat used by 1911 survey; 20-3-278"; H40-VM-56; picture of drillboat with people on it |
13 |
0 |
4 |
Unknown |
Boats |
|
Picture of boats in a river; "A-5"; H40-VM-55 |
13 |
0 |
4 |
Unknown |
Ferry Boat |
|
"Ferry Boat Cooling Off"; H40-VM-48; Picture of ferry boat "Froman M. Coots" in river during winter |
13 |
0 |
4 |
Salt River |
Towboats |
2/20/1958 |
"Tows harbored in Salt River due to Ohio River ice conditions.; File No. 30322"; H30-SM-7 |
13 |
0 |
4 |
Unknown |
Steamship |
|
Picture of the steamship "De Koven" near river bank with rail cars and houses on shore in background; H40-VM-41 |
13 |
0 |
4 |
Unknown |
Motorboat |
|
Overexposed photo of motorboat "Breckenridge No. 520" tied up at dock; H40-VM-39 |
13 |
0 |
4 |
Unknown |
Steamship |
|
Picture of the steamship "Mammoth Cave" from the front; 40VM-34; H13-16 (on back) |
13 |
0 |
4 |
Cumberland River |
Steamboat |
|
"Packet Boat Era; Steamboat Golden Eagle enroute upstream on the Cumberland River"; H40-VM-33; picture of a steamboat with people on it |
13 |
0 |
4 |
Unknown |
Dump Scow & Scrapper |
|
"1891; Dump Scow & Scrapper"; 40VM-4; 28012 (on back); picture of man on vessel with workboats, bridge, and houses in background |
13 |
0 |
4 |
Galveston Bay |
Dredge, Barge & Towboat |
2/6/1946 |
"U.S. Dredge "Omega" and Stock Barge "No. 2114" in tow of tug "Wilcox" crossing Galveston Bay"; H40-VM-14B; picture of three workboats |
13 |
0 |
5 |
Ohio River |
Misc. Tows |
7/8/1947 |
"M/V Commercial Express downbound at Louisville with 487 motor vehicles from Cincinnati, Ohio to Memphis, Tenn. Overall length 525 feet.; File No. 20222"; 40VO-9; picture of ship with cars on it, with bridge in background |
13 |
0 |
5 |
Unknown |
Towboat & Barges |
|
Picture of towboat "Sprague" pulling numerous barges; 40VO-108 |
13 |
0 |
5 |
Warsaw Bar |
Dredging |
|
"Oct. 1884; Dredging at Warsaw Bar; View showing Florence, Ind."; 40VO-83; 28015 (on back); picture includes dredges in river, with a lot of houses in background |
13 |
0 |
5 |
Unknown |
Sinking Boat |
9/27/1917 |
Picture of the "Shawnee" sinking with other workboats and men around it; houses visible in background; H40-VO-54 |
13 |
0 |
5 |
Ohio River |
Steamship |
10/25/1908 |
"Low water, Ohio River"; H40-UM-35; shows steamship "Tornado" with people standing around it |
13 |
0 |
5 |
Ohio River |
Floating Plant |
4/11/1950 |
"Towboat "DEL-COMMUNE", L.D. No. 636.; File No. 24287"; shows docked towboat with house and part of bridge in background |
13 |
0 |
5 |
Ohio River |
Floating Plant |
5/13/1954 |
"Messenger Launch, L. D. 657.; File No. 28245"; H40-VF-40; picture of a boat with a person driving it |
13 |
0 |
5 |
Ohio River |
Floating Plant |
5/21/1969 |
"Store Barge. L. D. 640.; File No. [scratched out]"; H40-VF-39; picture of a store barge with the workboat "Patoka" pulling it |
13 |
0 |
5 |
Cincinnati, OH |
Floating Plant |
8/1/1939 |
"Towboat Chenoka"; H40-VF-36; picture of towboat "Chenoka" with houses and buildings in background |
13 |
0 |
5 |
Cincinnati, OH |
Floating Plant |
8/1/1939 |
"Towboat Burnett"; H40-VF-35; picture of towboat "Burnett" on a drydock with houses and buildings in background |
13 |
0 |
5 |
Unknown |
Boat |
|
Picture of a small boat; H40-VF-31 |
13 |
0 |
5 |
Cincinnati, OH |
Floating Plant |
8/1/1939 |
"Launch Orlandam; Length 46'-4" Beam 10'-6" Depth 5'-0"; 19"; H14-VF-30; picture of a boat |
13 |
0 |
5 |
Cincinnati, OH |
Floating Plant |
7/10/1941 |
"Derrickboat Mingo; Length 94'-0" Beam 32'-0" Depth 5'-0"; 7"; H40-VF-29; picture of a boat with people on it |
13 |
0 |
5 |
Cincinnati, OH |
Floating Plant |
7/10/1941 |
"Store Barge No. 106; Length 80'-0" Beam 18'-0" Depth 4'-6"; 31"; H40-VF-27; picture of a boat |
13 |
0 |
5 |
Cincinnati, OH |
Floating Plant |
8/1/1939 |
"Launch Aberdeen; Length 28' 0" Beam 7'-6" Depth 2'-10"; 16"; H40-VF-26; picture of a boat |
13 |
0 |
5 |
Cincinnati, OH |
Floating Plant |
8/1/1939 |
"Quarterboat No. 463; Length 60'-0" Beam 22'-0" Depth 4'-0"; 5"; H40-VF-25; picture of a boat |
13 |
0 |
5 |
Cincinnati, OH |
Floating Plant |
8/1/1939 |
"Dipper Dredge Cincinnati"; H40-VF-24; picture of a boat |
13 |
0 |
5 |
Ohio River |
Floating Plant |
6/21/1938 |
"24" pipe line dredge (Diesel - electric) "C. B. HARRIS" No. 421; File 3520"; 40VF-21; picture of a ship |
13 |
0 |
5 |
Unknown |
Ships |
|
Photo of ships in a river (totally unlabeled) |
13 |
0 |
5 |
Unknown |
Ships |
|
Photo of a ship towing barges with another ship visible in background (photo totally unlabeled) |
13 |
0 |
5 |
Cincinnati, OH |
Floating Plant |
7/10/1941 |
"Derrickboat No. 40; Length 74'-9" Beam 34'-0" Depth 5'-4"; 10"; H40-VF-28; picture of a boat |
13 |
0 |
5 |
Cincinnati, OH |
Floating Plant |
7/10/1941 |
"Floating Garage No. 3; Length 62'-6" Beam 25'-7" Depth 3'-0""; H40-VF-32; picture of floating garage with two smaller boats in front of it |
13 |
0 |
5 |
Unknown |
Boat |
|
Picture of the boat "U.S. Olive" with a man in it; H40-VF-33 |
13 |
0 |
5 |
Unknown |
Boat |
|
Picture of a boat with a few canoes tied to it; H40-VF-34 |
13 |
0 |
5 |
Unknown |
Floating Plants |
|
Picture of two floating plants; H40-VF-37 |
13 |
0 |
5 |
Unknown |
Ship |
|
Picture of the ship "H. S. Taber" with people on it; H40-VF-38 |
13 |
0 |
5 |
Unknown |
Floating Plant |
6/28/1946 |
"Floating Plant, Motor Launch "Shawnee". Close-up of portside rudder.; File No. 18840"; H40-VF-42 |
13 |
0 |
5 |
Unknown |
Floating Plant |
6/28/1946 |
"Floating Plant, Motor Launch "Shawnee". Cincinnati District. View of rudders from starboard side.; File No. 18837"; H40-VF-43 |
13 |
0 |
5 |
Unknown |
Floating Plant |
6/28/1946 |
"Floating Plant, Motor Launch "Shawnee". Cincinnati District. Close-up of starboard rudder; File No. 18839"; H40-VF-44 |
13 |
0 |
5 |
Unknown |
Floating Plant |
6/28/1946 |
"Floating Plant, Motor Launch "Shawnee". Cincinnati District. Rudder and tunnel on starboard side.; File No. 18838"; H40-VF-45 |
13 |
0 |
5 |
Ohio River |
Floating Plant |
3/20/1946 |
""Omega" Pipe Line Dredge from Cincinnati District, being repaired in drydock at L.P.C.; File No. 18152"; H40-VF-46 |
13 |
0 |
5 |
Ohio River |
Floating Plant |
3/20/1946 |
""Omega" Pipe Line Dredge from Cincinnati District, being repaired in drydock at L.P.C.; File No. 18153"; H40-VF-47 |
13 |
0 |
5 |
Unknown |
Floating Plant |
6/28/1946 |
"Maneuver Boat L.D. No. 311 and Motor Launch "Shawnee", Cincinnati District, in drydock at Louisville Sub-Office for repairs.; File No. 18843"; H40-VF-48; includes three workboats on drydocks |
13 |
0 |
5 |
Unknown |
Floating Plant |
6/28/1946 |
"Motor Launch "Shawnee", Cincinnati District, and Maneuver Boat L.D. No. 311 in drydock at Louisville Sub-Office for repairs.; File No. 18841"; H40-VF-49; other workboats visible in background |
13 |
0 |
5 |
Cincinnati, OH |
Floating Plant |
8/1/1939 |
"Derrickboat No. 6; Length 74'-0" Beam 34'-0" Depth 5'-0"; 9"; H40-VF-50; picture of a derrickboat with people on and around it |
13 |
0 |
5 |
Cincinnati, OH |
Floating Plant |
11/22/1934 |
"Maneuverboat No. 37-A; Length 78'-0" Beam 24'-0" Depth 4'-6"; 62"; H40-VF-51; picture of a boat with people on it |
13 |
0 |
5 |
Cincinnati, OH |
Floating Plant |
7/10/1941 |
"Oil Barge No. 59; Length 80'-0" Beam 20'-0" Depth 5'-0"; 27"; H40-VF-52 |
13 |
0 |
5 |
Unknown |
Workboat |
|
Picture of a workboat in a river; H40-VO-51 |
13 |
0 |
5 |
Ohio River |
Workboat |
|
"Ohio River, upstream from Evansville, Indiana; New Alcoa Aluminum Plant at Newburgh, Indiana; c 1454"; not numbered |
13 |
0 |
5 |
Cincinnati, OH |
Dredge |
1/24/1935 |
"View of starboard fire box, showing lining along clinker line. U.S. Dredge Mallery."; H40-VO-71; close up detail shot |
13 |
0 |
5 |
Cincinnati, OH |
Dredge |
1/24/1935 |
"View of starboard fire box, showing lining along clinker line. U.S. Dredge Mallery."; H40-VO-70; close up detail shot |
13 |
0 |
5 |
Cincinnati, OH |
Dredge |
1/24/1935 |
"View of port fire box over fire doors. U.S. Dredge Mallery."; H40-VO-73; close up detail shot |
13 |
0 |
5 |
Cincinnati, OH |
Dredge |
1/24/1935 |
"View of port fire box, showing lining missing, exposing tile. U.S. Dredge Mallery."; H40-VO-74; close up detail shot |
13 |
0 |
5 |
Cincinnati, OH |
Dredge |
1/24/1935 |
"View of port fire box, showing lining missing, exposing tile. U.S. Dredge Mallery."; H40-VO-72; close up detail shot |
13 |
0 |
5 |
Cincinnati, OH |
Dredge |
1/24/1935 |
"View of starboard fire box, showing lining missing from front of flame bed. U.S. Dredge Mallery."; H40-VO-75; close up detail shot |
13 |
0 |
5 |
Ohio River |
Derrick |
7/16/1889 |
"Unloading logs from barge by derrick.; File No. 22557"; 40VO-22557; includes derrick boat, machinery, people, horses, and cart |
13 |
51 |
5 |
Ohio River |
Traffic Congestion |
5/12/1964 |
Shows river from above, with four towboats pulling barges; 40VO-746 |
13 |
0 |
5 |
Ohio River |
Floating Plant |
7/27/1939 |
"Towboat (Steam) "OTTAWA" No. 422.; File 3935"; 40VO-3935; picture of a steamboat |
13 |
0 |
5 |
Unknown |
Towboat & Barges |
|
"the "Sprague"; c. 1950"; H40-VO-109; shows the towboat "Sprague" pulling barges |
13 |
0 |
5 |
Louisville, KY |
Louisville Boat Club House |
|
"Louisville Boat Club House"; H15-OM-86; picture of boat club house with people on it next to a gondola |
13 |
0 |
6 |
Ohio River |
Floating Plant |
3/28/1947 |
"Wicket Tripping Assembly on Maneuverboat. Tripping device being lowered into trippping positions.; File No. 19828"; H40-VF-41; is a close up detail shot |
13 |
30 |
6 |
Ohio River |
River Traffic |
|
"Existing Locks & Dams Inadequate To Handle Modern River Traffic"; 40VO-113; photo of lock and dam and surrounding area, including houses |
13 |
0 |
7 |
Unknown |
Lock |
|
View of construction site, including machinery, workers, and materials; H15-OM-68 |
13 |
0 |
7 |
Unknown |
Lock |
|
View of construction site, including machinery, workers, and materials, with houses visible in background; H15-OM-71 |
13 |
0 |
7 |
Unknown |
Lock |
|
View of construction site, including machinery, workers, and materials; H15-OM-70 |
13 |
0 |
7 |
Unknown |
Lock |
|
View of construction site from hillside, including rail lines, materials, and lock house, with workboats and machinery in background; H15-OM-69 |
13 |
0 |
7 |
Ohio River |
Lock & Dam |
|
View of construction site, including machinery, materials, and workers, with houses visible in background; H15-OM-83; M-109 (on back) |
13 |
0 |
8 |
Ohio River |
Bank Conditions |
8/11/1921 |
"View of Sawdust and Bark Fill taken from Barge in River.; Longstaff and Orm Lumber Co., Paducah, Kentucky; P-O.R.-3"; picture of river bank |
13 |
0 |
8 |
Ohio River |
Bank Conditions |
8/11/1921 |
"View of Sawdust and Bark Fill taken from Barge in River.; Longstaff and Orm Lumber Co., Paducah, Kentucky; P-O.R.-3"; H15-OM-81; picture of river bank |
13 |
0 |
8 |
Ohio River |
Bank Conditions |
8/11/1921 |
"View of Sawdust and Bark Fill taken from Sawmill Incline.; Longstaff and Orm Lumber Co., Paducah, Kentucky; P-O.R.-I"; picture of river bank |
13 |
0 |
8 |
Ohio River |
Bank Conditions |
8/11/1921 |
"View of Sawdust and Bark Fill taken from Sawmill Incline.; Longstaff and Orm Lumber Co., Paducah, Kentucky; P-O.R.-I"; H15-OM-82; picture of river bank |
13 |
0 |
9 |
Harrodsburg, IN |
Monroe Reservoir |
10/4/1965 |
"View N-East Showing Cutwright Ramp Completed.; File No. 37798" (more description included); picture of the ramp to a reservoir, including a car |
13 |
1 |
10 |
Barren River |
Lock No. 1 |
9/21/1934 |
"Barren R. View Downstream Of Completed Operation Building…; 2944" (more description included); H36-B1-2 |
13 |
1 |
10 |
Barren River |
Lock & Dam No. 1 |
11/13/1952 |
"General view of Lock & Dam No. 1; File No. 27108"; H36-B1-3 |
13 |
1 |
10 |
Barren River |
Lock and Dam No. 1 |
8/8/1946 |
"Esplanade; Settlement On Land Side Of Lock Wall; File 18981"; H36-B1-1 |
13 |
0 |
11 |
Unknown |
Civil War - Bridge |
|
"Cars U.S. Military RR. Bridge built by soldiers; Orange and Alexandria R.R.; Civil War"; H86-MB-2; photo of a bridge with a train on it, with several people around train and one on the ground |
13 |
0 |
11 |
Unknown |
Civil War - Bridge |
|
"BRADY 10 - Railroad bridge reconstructed during the Civil War by U.S. Army, Corps of Engineers"; H86-MB-2; photo of a bridge with a train on it, with several people around train and one on the ground |
13 |
0 |
11 |
Unknown |
Civil War - Bridge |
|
Photo of a bridge with a train on it, with several people around train and one on the ground; H45-BM-25 |
13 |
0 |
11 |
Appomattox River |
Civil War - Pontoon Bridge |
|
"Pontoon at Broadway Landing; Appomattox River, 1864-1865…"; H86-MB-6; picture of pontoon bridge across river with some buildings visible |
13 |
0 |
11 |
Cumberland River |
Civil War - Bridge |
|
"BRADY 5 - Bridge across the Cumberland River, Civil War. Built by U.S. Engineer Troops"; H86-MB-5; picture of a bridge across a river, with men, horses and a cart in the foreground on the river bank |
13 |
0 |
11 |
Cumberland River |
Civil War - Bridge |
|
Picture of a bridge across a river, with men, horses and a cart in the foreground on the river bank; H86-MB-5 |
13 |
0 |
11 |
Cumberland River |
Civil War - Bridge |
|
Picture of a bridge across a river, with men, horses and a cart in the foreground on the river bank; H45-BM-23 |
13 |
0 |
11 |
Tennessee River |
Civil War - Bridge |
|
"BRADY 17 - Bridge across Tennessee River built by troops October, 1863. Photo from the Brady collection of Civil War pictures"; H86-MB-8; picture of a bridge |
13 |
0 |
11 |
Tennessee River |
Civil War - Bridge |
|
"BRADY 17 - Bridge across Tennessee River built by troops October, 1863. Photo from the Brady collection of Civil War pictures"; H86-MB-8; picture of a bridge |
13 |
0 |
11 |
James River |
Civil War - Pontoon Bridge |
|
"BRADY 13 - Ponton across James River. Photo from the Brady collection of Civil War Pictures."; H86-MB-7; picture of a pontoon bridge with people walking on it, and ships visible in background |
13 |
0 |
11 |
James River |
Civil War - Pontoon Bridge |
|
"BRADY 13 - Ponton across James River. Photo from the Brady collection of Civil War Pictures."; H86-MB-7; picture of a pontoon bridge with people walking on it, and ships visible in background |
13 |
0 |
11 |
James River |
Civil War - Pontoon Bridge |
|
"Pontoon across James River at Deep Bottom, VA.; Civil War; Mathew Brady"; H86-MB-9; photo of pontoon bridge with soldiers and buildings are ends of it |
13 |
0 |
11 |
James River |
Civil War - Pontoon Bridge |
|
"BRADY 6 - Pontoon bridge on James River, closed. Civil War."; H86-MB-1; picture of a pontoon bridge with soldiers on it; includes canoe and two boats |
13 |
0 |
11 |
James River |
Civil War - Pontoon Bridge |
|
"BRADY 6 - Pontoon bridge on James River, open. Civil War."; H86-MB-13; picture of a pontoon bridge that is open, with people and boats in shot |
13 |
0 |
11 |
Aiken's Landing |
Civil War - Pontoon Bridge |
|
"BRADY 8 - Aiken's Landing pontoon bridge, Virginia. Civil War."; H86-MB-3; picture of a pontoon bridge that is open, with people and horse in shot |
13 |
0 |
11 |
Unknown |
Civil War - Pontoon Bridge |
|
"2157"; Picture of a pontoon bridge with people on it, and large ships in the background; H86-MB-15 |
13 |
0 |
11 |
James River |
Civil War - Dutch Gap Canal |
|
"BRADY 9 - Work of cutting Dutch Gap Canal, James River, Virginia. Ordered by General Benjamin J. Butler to avoid Confederate Batteries in the river. Civil War."; H86-MB-16; picture of soldiers on river bank |
13 |
0 |
11 |
James River |
Civil War - Dutch Gap Canal |
|
"BRADY 21 - Dutch Gap Canal, 1865. Cut by Gen. Benjamin F. Butler across a big bend in the river to avoid confederate batteries. James River near Richmond"; H86-MB-17; picture of people in a canoe on a river bank |
13 |
0 |
11 |
Belle Plain |
Civil War - Camp |
|
"BRADY 15 - Camp of 15th N.Y. Engineers, Belle Plain, May 1864. Photo from the Brady Collection of Civil War Pictures"; H86-MB-18; photo of a camp taken from a hillside |
13 |
0 |
11 |
Unknown |
Civil War - Pontoon Train |
|
"Pontoon Train ready for Marching; Civil War; Mathew Brady"; H86-MB-10; photo includes pontoon train and people |
13 |
0 |
11 |
Unknown |
Civil War - Pontoon Train |
|
"Ponton Train ready for Marching; Civil War; Mathew Brady"; 86MB-10; photo includes pontoon train and people |
13 |
0 |
11 |
Tennessee River |
Civil War - Bridge |
|
"Bridge built by troops across Tenn. R. at Chattanooga; B-662; 2156"; 86MB-12; picture of a bridge |
13 |
0 |
11 |
Tennessee River |
Civil War - Bridge |
|
"BRADY 7 - Military bridge built by troops across Tennessee River at Chattanooga, October 1863. Civil War.; B-662; 2156"; H86-MB-12; picture of a bridge |
13 |
0 |
11 |
Tennessee River |
Civil War - Bridge |
|
"BRADY 7 - Military bridge built by troops across Tennessee River at Chattanooga, October 1863. Civil War.; B-662; 2156"; H86-MB-12; picture of a bridge |
13 |
0 |
11 |
Tennessee River |
Civil War - Bridge |
|
"B-662; 2156"; H86-MB-12; Picture of a bridge |
13 |
0 |
11 |
Unknown |
Civil War - Bridge |
|
"BRADY 16 - Military bridge. Civil War. U.S. Engineers"; H86-MB-4; picture of a small bridge with soldiers in the foreground |
13 |
0 |
11 |
Unknown |
Civil War - Bridge |
|
Picture of a small bridge with soldiers in the foreground; H86-MB-4 |
13 |
0 |
11 |
Unknown |
Civil War - Railroad Trestle |
|
"BRADY 11 - Railraod trestle reconstructed by the U.S. Army, Corps of Engineers, in the war between the states. Photo from Brady collection"; H86-MB-11; picture of railroad trestle with person in the foreground |
13 |
0 |
11 |
Unknown |
Civil War - Railroad Trestle |
|
Picture of railroad trestle with person in the foreground; H86-MB-11 |
13 |
0 |
11 |
Unknown |
Civil War - Railroad Trestle |
|
"BRADY 11 - Railraod trestle reconstructed by the U.S. Army, Corps of Engineers, in the war between the states. Photo from Brady collection"; H86-MB-11; picture of railroad trestle with person in the foreground |
13 |
0 |
11 |
Baltimore, MD |
Civil War - Carrollton Viaduct |
|
"Carrollton Viaduct near Baltimore, MD.; 1828-1829; B&O RR.; Civil War"; picture of a viaduct |
13 |
0 |
11 |
Tennessee River |
Civil War - Bridge |
|
"Bridge built by troops across Tennessee River at Chattanooga; Civil War; B-662"; picture of a bridge |
13 |
0 |
11 |
Whiteside, TN |
Civil War - Railroad Trestle |
|
"Trestle Bridge, Whiteside, Tenn.; Civil War; B-532"; picture of a railroad trestle with a person in the foreground |
13 |
0 |
11 |
Tennessee River |
Civil War - Bridge |
|
"Bridge Construction, 1860s; B-608"; picture of a bridge |
13 |
0 |
11 |
Unknown |
Civil War - Bridge |
|
"Cars U.S. Military R.R. Bridge built by soldiers; Orange and Alexandria R.R.; Civil War; B-185"; picture of a bridge with a train on it, with people around it and a person in the foreground |
13 |
0 |
12 |
Dix River |
Dix Dam |
|
View of Dix Dam from hillside, seemingly during construction process; H56-LD-3 |
13 |
0 |
12 |
Dix River |
Dix Dam |
|
View of Dix Dam from the front, seemingly during construction process; H56-LD-4 |
13 |
0 |
12 |
Dix River |
Dix Dam |
|
"Dix Dam; Hydro-Electric Power And Storage Dam; Looking Upstream (Southward) Before Construction Of Spillway And Control Gates (1926); H56-LD-5; aerial view of dam and surrounding area |
13 |
0 |
12 |
Dix River |
Dix Dam |
|
"Dix Dam; Hydro-Electric Power And Storage Dam; Looking Upstream (Southward) Before Construction Of Spillway And Control Gates (1926); H56-LD-5; aerial view of dam and surrounding area |
13 |
0 |
12 |
Dix River |
Dix Dam |
|
"Dix Dam Power Station - Looking Downstream From Right Abutment Of Dam - Sept 1937"; H56-LD-6; view of power station from hillside |
13 |
0 |
12 |
Dix River |
Dix Dam |
|
"Dix Dam; Spillway Control Gates At Left; Collapsible Non-Overflow Section At Right; Looking Upstream (Westward)"; H56-LD-7 |
13 |
0 |
12 |
Dix River |
Dix Dam |
|
"Dix Dam; Spillway Control Gates At Left; Collapsible Non-Overflow Section At Right; Looking Upstream (Westward)"; H56-LD-7 |
13 |
0 |
12 |
Dix River |
Dix Dam |
|
"Dix Dam; Herrington Lake; Looking Upstream Westward From The Hilltop At The Right Abutment Of The Dam Showing Intake Pier."; H56-LD-11 |
13 |
0 |
12 |
Dix River |
Dix Dam |
|
"Dix Dam; From Hilltop At The Right Abutment Looking Northwestward Showing Loose Rock Fill, Downstream Face Of Dam And Roadway On Dam Crest."; H56-LD-12 |
13 |
0 |
12 |
Dix River |
Dix Dam |
|
View of completed dam from one side; H56-LD-13 |
13 |
0 |
12 |
Dix River |
Dix Dam |
|
View of completed dam from hillside; H56-LD-14 |
13 |
0 |
12 |
Dix River |
Dix Dam |
|
View of face of completed dam; H56-LD-15 |
13 |
0 |
12 |
Dix River |
Dix Dam |
12/15/1950 |
"Power house at Dix Dam; File No. 25085"; H56-LD-16 |
13 |
0 |
12 |
Dix River |
Dix Dam |
12/15/1950 |
"Transformer platform, Dix Dam.; File No. 25086"; H56-LD-17 |
13 |
0 |
12 |
Dix River |
Dix Dam |
|
"Dix Dam; No. 535"; H56-LD-8; small view of face of dam during construction, including machinery |
13 |
0 |
12 |
Dix River |
Dix Dam |
|
"Dix Dam; No. 535"; H56-LD-8; small view of face of dam during construction, including machinery |
13 |
0 |
12 |
Dix River |
Dix Dam |
|
"Dix River Dam; No. 712"; H56-LD-1; small view of dam during construction, including machinery, materials, and workers |
13 |
0 |
12 |
Dix River |
Dix Dam |
|
"Dix Dam; No. 543"; H56-LD-10; small view of face of dam during construction, including machinery |
13 |
0 |
12 |
Dix River |
Dix Dam |
|
"Dix River Dam; No. 1006"; H56-LD-2; small view of completed dam from one side of river |
13 |
0 |
12 |
Dix River |
Dix Dam |
|
Small view of dam during construction, including workers, materials, small building, and machinery; H56-LD-9 |
13 |
0 |
13 |
Green River |
Bridge |
8/19/1930 |
"Green River Bridges; I.C.R.R. BR. At Rockport, Ky.; 1389"; H45-BM-1; picture of a bridge taken from a dirt road |
13 |
0 |
13 |
Green River |
Bridge |
8/19/1930 |
"Green River Bridges; I.C.R.R. BR. At Rockport, Ky.; 1389"; H45-BM-1; picture of a bridge taken from a dirt road |
13 |
0 |
13 |
Green River |
Bridge |
8/16/1930 |
"Green River Bridge; Greensburg, Ky.-Hy.; 1375"; H45-BM-3; picture of a bridge with a men, a cart, and a car under it |
13 |
0 |
13 |
Green River |
Bridge |
8/16/1930 |
"Green River Bridge; Greensburg, Ky.-Hy.; 1375"; H45-BM-3; picture of a bridge with a men, a cart, and a car under it |
13 |
0 |
13 |
Green River |
Bridge |
8/14/1930 |
"Green River Bridge; McKinley-Ky. Bridge; 1373"; H45-BM-4; picture of a bridge with a man on it |
13 |
0 |
13 |
Green River |
Bridge |
8/14/1930 |
"Green River Bridge; McKinley-Ky. Bridge; 1373"; H45-BM-4; picture of a bridge with a man on it |
13 |
0 |
13 |
Green River |
Bridge |
8/16/1930 |
"Green River Bridge; Munfordville, Ky.-Hy.; 1377"; H45-BM-5; picture of a bridge with a man on it |
13 |
0 |
13 |
Green River |
Bridge |
8/16/1930 |
"Green River Bridge; Munfordville, Ky.-Hy.; 1377"; H45-BM-5; picture of a bridge with a man on it |
13 |
0 |
13 |
Green River |
Bridge |
8/14/1930 |
"Green River Bridge; Liberty-Dunnville; 1371"; H45-BM-6; picture of a bridge with a man on it |
13 |
0 |
13 |
Green River |
Bridge |
8/14/1930 |
"Green River Bridge; Liberty-Dunnville; 1371"; H45-BM-6; picture of a bridge with a man on it |
13 |
0 |
13 |
Green River |
Bridge |
8/16/1930 |
"Green River Bridge; Munfordville, Ky.-Hy.; 1374"; H45-BM-7; picture of a bridge taken from a hillside |
13 |
0 |
13 |
Green River |
Bridge |
8/16/1930 |
"Green River Bridge; Munfordville, Ky.-Hy.; 1374"; H45-BM-7; picture of a bridge taken from a hillside |
13 |
0 |
13 |
Green River |
Bridge |
8/14/1930 |
"Green River Bridge; Campbellsville, Ky.; 1369"; H45-BM-8; picture of a bridge with a man on it |
13 |
0 |
13 |
Green River |
Bridge |
8/14/1930 |
"Green River Bridge; Campbellsville, Ky.; 1369"; H45-BM-8; picture of a bridge with a man on it |
13 |
0 |
13 |
Green River |
Bridge |
8/16/1930 |
"Green River Bridge; Greensburg, Ky.-Ky.; 1376"; H45-BM-10; picture of a bridge with a man on it |
13 |
0 |
13 |
Green River |
Bridge |
8/16/1930 |
"Green River Bridge; Greensburg, Ky.-Ky.; 1376"; H45-BM-10; picture of a bridge with a man on it |
13 |
0 |
13 |
Barren River |
Bridge |
8/19/1930 |
"Barren River Bridge; Fountain Run Bridge; 1395"; H45-BM-11; picture of a bridge with a man on it, with people playing in the river in the foreground |
13 |
0 |
13 |
Barren River |
Bridge |
8/19/1930 |
"Barren River Bridge; Fountain Run Bridge; 1395"; H45-BM-11; picture of a bridge with a man on it, with people playing in the river in the foreground |
13 |
0 |
13 |
Green River |
Bridge |
8/14/1930 |
"Green River Bridge; Sou. R.R. - McKinley, Ky.; 1372; H15-BM-12; picture of a bridge with a man on it |
13 |
0 |
13 |
Green River |
Bridge |
8/14/1930 |
"Green River Bridge; Sou. R.R. - McKinley, Ky.; 1372; H15-BM-12; picture of a bridge with a man on it |
13 |
0 |
13 |
Green River |
Bridge |
8/14/1930 |
"Green River Bridge; 1370"; H45-BM-13; picture of a bridge with a man on it |
13 |
0 |
13 |
Green River |
Bridge |
8/14/1930 |
"Green River Bridge; 1370"; H45-BM-13; picture of a bridge with a man on it |
13 |
0 |
13 |
Green River |
Bridge |
8/16/1930 |
"Green River Bridge; Greensburg, Ky.-Hy.; 1378"; H45-BM-15; picture of a bridge with a man on it |
13 |
0 |
13 |
Green River |
Bridge |
8/16/1930 |
"Green River Bridge; Greensburg, Ky.-Hy.; 1378"; H45-BM-15; picture of a bridge with a man on it |
13 |
0 |
13 |
Barren River |
Bridge |
8/19/1930 |
"Barren River Bridge; Bowling Green, Ky.-Hy.; 1394"; H45-BM-17; picture of a bridge with a man under it |
13 |
0 |
13 |
Barren River |
Bridge |
8/19/1930 |
"Barren River Bridge; Bowling Green, Ky.-Hy.; 1394"; H45-BM-17; picture of a bridge with a man under it |
13 |
0 |
13 |
Green River |
Bridge |
8/23/1930 |
"Green River Bridge; Calhoun, Ky.-Hy.; 1399"; H45-BM-2; picture of a bridge |
13 |
1 |
14 |
Green River |
Lock and Dam No. 1 |
10/9/1946 |
"General View Of Dam; File No. 19316"; H21-G1-7; picture of dam taken from river bank, with two men in a canoe in front of dam |
13 |
1 |
14 |
Green River |
Lock and Dam No. 1 |
10/9/1946 |
"General View Of Dam; File No. 19316"; H21-G1-7; picture of dam taken from river bank, with two men in a canoe in front of dam |
13 |
1 |
14 |
Green River |
Lock and Dam No. 1 |
10/9/1946 |
"General View Of Lock; File No. 19317"; H21-G1-8; picture of lock and esplanade |
13 |
5 |
14 |
Green River |
Lock & Dam No. 5 |
|
"View Upstream Of New Dam In Operation From Lower River Wall"; H21-G5-1; faded photo of dam with barge in background |
13 |
1 |
14 |
Green River |
Lock 1 |
|
General view of lock taken from riverbank, with houses visible in background; H21-G1-1 |
13 |
1 |
14 |
Green River |
Lock 1 |
|
General view of lock taken from riverbank, with houses visible in background; H21-G1-1 |
13 |
1 |
14 |
Green River |
Lock 1 |
|
"Old Lock"; H21-G1-2; general view of lock and esplanade |
13 |
0 |
15 |
Willow Island |
Dam |
8/7/1890 |
"Willow Island (Dam) Pool Aug 7, 1890; Belmont, W. Va. - ORM 158.4; 1889 - Narrow, Shallow River Before Engineer Navigation Dams Were Built"; 15M-111; picture of a river with a ship and a canoe in it, with houses visible along shore line |
13 |
0 |
15 |
Willow Island |
Dam |
|
"1889 - Narrow shallow river before Engineer navigation dams were built"; H40-4; picture of a river with a ship and a canoe in it, with houses visible along shore line |
13 |
0 |
15 |
Willow Island |
Dam |
|
"1889 - Narrow, Shallow River Before Engineer Navigation Dams Were Built"; LDH #85MM-1; 22569 (on back); picture of a river with a ship and a canoe in it, with houses visible along shore line |
13 |
0 |
15 |
Ohio River |
Bridge |
|
"Old Narrow River; Southern Railway Bridge - Used on a display; Ohio River"; 80HM-73; picture of a bridge with barges and buildings in the foreground |
13 |
0 |
16 |
Salt River |
Ice Conditions |
2/20/1958 |
"Tows harbored in Salt River due to Ohio River ice conditions; File No. 30314"; H30-SM-6; photo of several towboats in river during winter, with bridge in background |
13 |
0 |
17 |
Salt River |
Misc |
|
"Pitts Point - Forks of Salt River"; H30-SM-1; S.R.2; picture of shallow river with houses in background |
13 |
0 |
18 |
Salt River |
Misc |
|
"Mouth of Mill Creek - Salt River"; H30-SM-2; S.R.3; picture of a shallow river with men in a canoe |
14 |
0 |
1 |
Salt River |
Misc |
|
"Keys Riffle - Salt River"; H30-SM-3; S.R.4; picture of a river with a couple rafts in it |
14 |
0 |
2 |
Salt River |
Misc |
|
"Mouth of Salt River - West Point, Ky."; H30-SM-5; S.R.1; picture of a river with a bridge over it and a man in the foreground |
14 |
0 |
3 |
Salt River |
Misc |
|
"Dowdels (sp?) Rocks - Salt River"; H30-SM-4; S.R.5; picture of a river with men in a canoe |
14 |
0 |
4 |
Cincinnati, OH |
Sayler Park |
2/15/1934 |
"Marine Ways, U.S. Engineer Depot, Sayler Park, Cinti., Ohio.; View showing deposit in front of ways."; houses in background |
14 |
0 |
4 |
Cincinnati, OH |
Sayler Park |
2/12/1934 |
"U.S. Engineer Depot. Sayler Park, Cinti., Ohio.; View showing harbor filled-up below ice piers"; photo of numerous workboats crowding river during winter |
14 |
0 |
5 |
Wabash River |
Lock at Grand Rapids |
|
"Lock @ Grand Rapids Completed 1849 by Wabash Navigation Company, Rebuilt by Corps of Engineers; completed 1894; Used in District History Book (Louisville) Published 1975; Page 141"; H71-W1-4; picture of men next to lock |
14 |
0 |
5 |
Wabash River |
Lock at Grand Rapids |
|
"Lock at Grand Rapids, Wabash River, From lower shore crib"; 71W1-1; small view of lock with men standing on guide wall |
14 |
0 |
6 |
White River |
West Fork |
10/31/1922 |
"West Fork; White River; Worthington, Ind.; 20-3-58"; H85-MM-9; small picture of a river with a raft in the foreground and a bridge in the background |
14 |
0 |
6 |
Eel River |
Misc |
10/31/1922 |
"Eel River; Worthington, Ind.; 20-3-57"; H85-MM-15; small picture of a river |
14 |
0 |
6 |
White River |
West Fork |
10/30/1922 |
"West Fork; White River; Martinsville, Ind.; Water 6" to 3' deep.; 20-3-56"; H85-MM-8; small view of a river |
14 |
0 |
6 |
White River |
West Fork |
10/31/1922 |
"West Fork; White River; Spencer, Ind.; 20-3-54"; H85-MM-14; small view of bridge |
14 |
0 |
6 |
White River |
West Fork |
10/31/1922 |
"West Fork; White River; Spencer Ind.; Water 6" deep over ripple; 20-3-55"; H85-MM-13; small view of a river |
14 |
0 |
6 |
White River |
West Fork |
10/31/1922 |
"West Fork; White River; Washington, Ind.; 20-3-61"; H85-MM-12; small view of a river |
14 |
0 |
6 |
White River |
West Fork |
10/30/1922 |
"West Fork; White River; Martinsville Ind.; 20-3-60"; H85-MM-11; small view of a river |
14 |
0 |
6 |
White River |
West Fork |
10/31/1922 |
"West Fork; White River; Spencer Ind.; 20-3-59"; H85-MM-10; small view of a river |
14 |
1 |
7 |
Rough River |
Lock No. 1 |
|
"Hydrograph… 1910"; H26-R1-13; 21-2-247 |
14 |
1 |
7 |
Rough River |
Lock And Dam No. 1 |
12/19/1950 |
"General view of Lock and Dam; File No. 25106"; H26-R1-29; includes house in background |
14 |
1 |
7 |
Rough River |
Lock And Dam No. 1 |
12/19/1950 |
"General view of Lock and Dam; File No. 25106"; H26-R1-29; includes house in background |
14 |
1 |
7 |
Rough River |
Lock And Dam No. 1 |
12/19/1950 |
"General view of Lock and Dam; File No. 25106"; H26-R1-29; includes house in background |
14 |
1 |
7 |
Rough River |
Lock And Dam No. 1 |
12/19/1950 |
"General view of Lock and Dam; File No. 25106"; H26-R1-29; includes house in background |
14 |
1 |
7 |
Rough River |
Lock And Dam No. 1 |
12/19/1950 |
"General view of Lock and Dam; File No. 25106"; H26-R1-29; includes house in background |
14 |
1 |
7 |
Rough River |
Lock And Dam No. 1 |
12/19/1950 |
"General view of Lock and Dam; File No. 25106"; H26-R1-29; includes house in background |
14 |
1 |
7 |
Rough River |
Lock And Dam No. 1 |
10/9/1946 |
"General View Showing Drift On Dam; File No. 19315"; H26-R1-26; includes man on shore, and houses and workboat in background |
14 |
1 |
7 |
Rough River |
Lock And Dam No. 1 |
12/19/1950 |
"General view of Lock and Dam.; File No. 25108; (Match Photo No. 25107)."; H26-R1-27; includes houses in background |
14 |
1 |
7 |
Rough River |
Lock And Dam No. 1 |
12/19/1950 |
"General view of Lock and Dam.; File No. 25107; (Match Photo No. 25108)."; H26-R1-28 |
14 |
1 |
7 |
Rough River |
Lock |
9/27/1895 |
"Rough River Lock, Ky.; No. 8"; picture of men at work |
14 |
1 |
8 |
Rough River |
Lock |
12/16/1896 |
"View No. 22.- View of Lock… showing upper entrance to lock with boat being locked through.; Used in "A History of the Louisville District Corps of Engineers United States Army" Page 146; Packet boat "City of Hartford" locking through"; H26-R1-30 |
14 |
1 |
9 |
Rough River |
Lock |
12/16/1896 |
"View No. 24.- View of lock and dam… looking up stream"; H26-R1-15; includes houses and people in background |
14 |
1 |
10 |
Rough River |
Lock |
10/28/1896 |
"View No. 19.- View of Lock… showing concrete lock masonry complete, and filling behind land wall in progress"; H26-R1-14; includes people, rail lines, machinery, and materials |
14 |
1 |
11 |
Rough River |
Lock |
12/16/1896 |
"View No. 23.- View of Lock… showing lock chamber"; H26-R1-12; faded image of men on guide wall and shore, with houses in background |
14 |
1 |
12 |
Rough River |
Lock |
10/28/1896 |
"View No. 20.- View of Lock… showing concrete lock masonry, upper miter sill in place, and drilling anchor bolt holes for sill and head wall."; H26-R1-11A; includes workers and materials |
14 |
1 |
13 |
Rough River |
Lock |
10/28/1896 |
"View No. 21.- View of Lock… showing progress on dam."; H26-R1-10; includes workers and materials, with house visible in background |
14 |
1 |
14 |
Rough River |
Lock and Dam |
11/28/1896 |
"Showing Flood in Rough River, Ky., after completion of Lock and Dam."; H26-R1-9; includes buildings in background |
14 |
1 |
15 |
Rough River |
Lock |
9/11/1895 |
"No. 1. View showing part of foundation for Lock.; Rough River, Ky."; H26-R1-22; R.R. L 1/1; faded image of workers on construction site |
14 |
1 |
16 |
Rough River |
Lock |
9/11/1895 |
"No. 2. View showing placing of Concrete frames in progress. Setting a bent.; Rough River, Ky."; H26-R1-23; L-1/2; faded image of workers on construction site, includes materials |
14 |
1 |
17 |
Rough River |
Lock |
9/27/1895 |
"No. 3. Birds Eye View of Lock Site from Abutment side of river.; Rough River, Ky."; H26-R1-3; L-1/3; image of construction site from opposite side of river, including workers and materials, with buildings in background |
14 |
1 |
18 |
Rough River |
Lock |
9/27/1895 |
"No. 4. Birds Eye View of Lock Site from Lock shore.; Rough River, Ky."; H26-R1-4; L-1/4; view of construction site, including workers, materials, and buildings |
14 |
1 |
19 |
Rough River |
Lock |
9/27/1895 |
"No. 5. View showing Mixer at work from North.; Rough River, Ky."; H26-K1-24; L-1/5; view of construction site, including workers, materials, building, and rail lines |
14 |
1 |
20 |
Rough River |
Lock |
9/27/1895 |
"No. 6. View showing Mixer at work from South.; Rough River, Ky."; H26-R1-5; L-1/6; view of construction site, including workers, materials, buildings, rail lines, and pulley system |
14 |
1 |
21 |
Rough River |
Lock |
9/27/1895 |
"No. 7. View showing Carpenters at sheeting a section.; Rough River, Ky."; H26-R1-6; L-1/7; includes workers |
14 |
1 |
22 |
Rough River |
Lock |
10/5/1895 |
"No. 9. View showing Concrete frame complete from Abutment side of river.; Rough River, Ky."; H26-R1-8; L-1/9; view of construction side including wood, workers, and buildings |
14 |
1 |
23 |
Rough River |
Lock |
10/5/1895 |
"No. 11. View of Concrete frame in detail showing angle in back of wall.; Rough River, Ky."; H26-R1-7; L-1/11; includes workers |
14 |
1 |
24 |
Rough River |
Lock |
10/5/1895 |
"No. 10. View showing Concrete frame complete looking from upper end of Lock on chamber side.; Rough River, Ky."; H26-R1-25; L-1/10; view of construction site |
14 |
1 |
25 |
Rough River |
Lock |
10/5/1895 |
"No. 12. View of end of Section exposed, showing manner of making juncture of sections, one template for tongue and groove yet in place.; Rough River, Ky."; H26-R1-19; L-1/12; faded image of workers leaning against a wall |
14 |
1 |
26 |
Rough River |
Lock |
10/5/1895 |
"No. 13. View of part of end of exposed section and sheeting being placed for abutting section and iron hollow quoin in place; Rough River, Ky.; H26-R1-18; L-1/13; picture of workers leaning against a wall |
14 |
1 |
27 |
Rough River |
Lock |
10/5/1895 |
"No. 14. View of top of wall, showing framing in place after track was removed.; Rough River, Ky."; H26-R1-17; L-1/14; picture of construction site with a man on it |
14 |
1 |
28 |
Rough River |
Lock |
10/18/1895 |
"No. 15. View showing timber forms being removed from Lock Wall.; Rough River, Ky.; H26-R1-16; L-1/15; picture of construction site with workers on it; includes materials and machinery |
14 |
1 |
29 |
Rough River |
Lock |
11/13/1895 |
"No. 16. View showing back of completed River Wall.; Rough River, Ky."; H26-R1-20; L-1/16; view of completed river wall with workers, canoe, and buildings in shot |
14 |
1 |
30 |
Rough River |
Lock |
|
View of completed guide wall with people walking on it and house visible in background; H26-R1-1; L-1/17 |
14 |
1 |
31 |
Rough River |
Lock |
11/13/1895 |
"No. 18. View showing Abutment completed and grading about it in progress.; Rough River, Ky."; H26-R1-21; L-1/18; includes workers on construction site with materials |
14 |
0 |
32 |
Kentucky River |
Dam |
|
"Jessamine Reservoir Project; Kentucky River, KY; Dam Site Area; Plate 10"; aerial photo on dam site with labels on photo |
14 |
0 |
32 |
Kentucky River |
Bridge |
|
"Jessamine Reservoir - Highway Bridge Over Kentucky River Near Cleveland, Ky., On U.S. Route No. 25; Plate 12"; picture of a bridge |
14 |
0 |
32 |
Red River |
Bridge |
8/22/1939 |
"Jessamine Reservoir - Highway Bridge Over Red River On State Route No. 89; Plate 14"; picture of a bridge |
14 |
0 |
32 |
Boonesboro, KY |
Road |
8/24/1939 |
"Jessamine Reservoir - U.S. Route No. 227 Near Boonesboro, Ky.; Plate 13"; picture of a road |
14 |
0 |
32 |
Kentucky River |
Bridge |
10/6/1939 |
"Jessamine Reservoir - L. & N. R.R. Bridges Over Kentucky River Near Ford, Ky.; Plate 11"; picture of two bridges |
14 |
0 |
32 |
Clay City |
Road |
8/23/1939 |
"Jessamine Reservoir - State Route No. 15 Through Clay City; Plate 15"; picture of a road through a town, including cars, buildings and people |
14 |
0 |
33 |
Ohio River |
Misc |
|
"February 1941; View of upstream side of model showing three types of hinged wickets and sills used in the Louisville District… File 6189" (more description included); H85-MM-5 |
14 |
0 |
33 |
Ohio River |
Misc |
4/6/1949 |
"Army Day Exhibit. Model of Louisville and Portland Canal in window of DURAND'S Women's Apparel, 313 W. Walnut Street, Louisville, Kentucky; File No. 22728"; H85-MM-2 |
14 |
0 |
33 |
Unknown |
Misc |
|
View of a city street with Seelbach's European Hotel in the foreground; includes donkeys, people, buildings, and a trolley car; 80HM-42 |
14 |
0 |
33 |
Unknown |
Misc |
|
"1924; Blue print machine in District Office recd. From Huntington Dist."; H85-MM-4; 21-2-77 |
14 |
0 |
33 |
Unknown |
Misc |
|
"General Godfrey Weitzel, Louisville District Engineer, 1867-1881; Credit: Cincinnati Historical Society; Used in "A History of the Louisville District Corps of Engineers United States Army" Page 124"; H80-HM-34 |
14 |
0 |
33 |
Unknown |
Misc |
|
View of a city street, including buildings and car; 80HM-46 |
14 |
0 |
33 |
Unknown |
Misc |
|
View of a five story building in a city, with people and a horse drawn carriage in the front; 80HM-43 |
14 |
0 |
33 |
Unknown |
Misc |
|
View of rail lines with train cars on them, with buildings in the background; 80HM-45 |
14 |
0 |
33 |
Unknown |
Misc |
|
View of the front of a building in a town; 80HM-48 |
14 |
0 |
34 |
Unknown |
Church |
|
"Calivary Church"; 80HM-39; view of a church during construction |
14 |
0 |
34 |
Unknown |
Misc |
|
"Main Street, West from 7th St."; 80HM-47; view of a street in a city, including horses, carts, buildings, and people |
14 |
0 |
35 |
Unknown |
Misc |
|
View of a six story building in a city, with people on the street; H80-HM-51 |
14 |
0 |
36 |
Unknown |
Misc |
|
"1889 Main Street Buildings"; 80HM-52; view of buildings on a city street, with horse drawn carts in the front |
14 |
0 |
37 |
Ohio River |
Markland Locks & Dam |
|
"Proposed Markland Locks & Dam; Ohio River"; sketch of proposed site |
14 |
0 |
38 |
Unknown |
Misc |
|
"William H. McAlpine; District Engineer 1918-1919"; H80-HM-8; portrait |
14 |
0 |
38 |
Unknown |
Misc |
|
"Major Lester F. Rhodes; District Engineer 1939-1940"; H80-HM-59; portrait |
14 |
0 |
39 |
Unknown |
Misc |
|
"Major General Alexander Macomb; Chief Engineer, Corps, 1821-1828… Used in "A History of the Louisville District Corps of Engineers United States Army" Page 51" (more description included); H80-HN-7; portrait |
14 |
0 |
39 |
Unknown |
Misc |
|
Unlabeled Portrait; H80-HM-57 |
14 |
0 |
40 |
Unknown |
Misc |
|
"General Wm. C. Westmoreland; Chief Of Staff"; H80-HM-55; portrait |
14 |
0 |
40 |
Unknown |
Misc |
|
"Honorable Stanley Resor; Secretary Of The Army"; H80-HM-54; portrait |
14 |
0 |
41 |
Unknown |
Misc |
|
"Honorable Melvin R. Land; Secretary Of Defense"; H80-HM-56; portrait |
14 |
0 |
41 |
Unknown |
Lock |
|
General view of construction site for a lock, including rail lines and materials; 80HM-61 |
14 |
0 |
42 |
Unknown |
Misc |
|
"Colonel Willard Roper, District Engineer 1963-1966"; H80-HM-60; portrait |
14 |
0 |
42 |
Unknown |
Flood |
|
Photo of a city that is flooded with people in a raft in the foreground, and houses in the background |
14 |
0 |
43 |
Unknown |
Lock |
9/17/1927 |
"Tow Sam B. Suit; W. 4th St. near Baymiller"; H15-OM-77; view of construction side for a lock, with Towboat "Sam B. Suit" in the river |
14 |
0 |
43 |
Unknown |
Lock |
|
View of ship being locked through; 80HM-62 |
14 |
0 |
43 |
Unknown |
Misc |
|
"The Battle Of Bunker Hill"; 80HM-68; illustrated explanation of COE history |
14 |
0 |
43 |
Unknown |
Misc |
|
"Realignment Of U.S. Engineers"; 80HM-72; No. 8B; map |
14 |
0 |
43 |
Unknown |
Misc |
12/28/1932 |
"Accidents; Removing "City of Memphis"; 1795"; 80HM-1795; photo of men next to a ship's wheel |
14 |
0 |
43 |
Unknown |
Misc |
|
Image of workers removing barrels from a vessel on a conveyor belt; 80HM-313 |
14 |
0 |
44 |
Unknown |
Misc |
|
"1889 - Central Park"; H80-HM-50; small view of central park, including fountain, people, and houses |
14 |
0 |
44 |
Unknown |
Misc |
|
"1889 - Grand Stand Race Course"; H80-HM-49; small view |
14 |
0 |
44 |
Unknown |
Misc |
|
"Richard M. Nixon; President of the United States"; H80-HM-53; portrait |
14 |
0 |
44 |
Unknown |
Flat Bottom Boat |
|
"Sketch of a Flat bottom Boat; such as are used to descend the Ohio and the Mississippi; Victor Collot, "A Journey In North America In 1796""; 80HM-3 |
14 |
0 |
44 |
Unknown |
Watertower or Lighthouse |
|
"Watertower or Lighthouse Misc"; 80HM-20 |
14 |
0 |
44 |
Unknown |
Misc |
|
Picture of a city church during construction (almost complete), with two people in front of it; 80HM-38 |
14 |
0 |
44 |
Unknown |
Misc |
|
Picture of a city church during construction, with people in front of it; 80HM-39 |
14 |
0 |
44 |
Unknown |
Misc |
|
"Main Street, East From Fourth Street"; 80HM-41; picture of a crowded city street, including people, carriages, and buildings |
14 |
0 |
44 |
Unknown |
Misc |
|
Picture of the inside of a store (antique shop?); 80HM-40 |
15 |
13 |
1 |
Kentucky River |
Lock No. 13 |
|
"1919"; #134; panorama view of Lock No. 13, including lock, dam, workboats and houses |
15 |
1 |
1 |
Kentucky River |
Lock No. 1 |
4/11/1921 |
"Looking down-stream from Lock side"; view includes lock and houses on hillside |
15 |
1 |
1 |
Kentucky River |
Lock No. 1 |
4/11/1921 |
"Looking up-stream"; view includes lock, dam, and houses |
15 |
1 |
1 |
Kentucky River |
Lock No. 1 |
4/15/1918 |
"Lower Gate, river leaf"; #4; small view |
15 |
1 |
1 |
Kentucky River |
Lock No. 1 |
4/2/1918 |
"Lower Gate, River Leaf"; #3; small view including worker |
15 |
1 |
1 |
Kentucky River |
Lock No. 1 |
4/5/1918 |
"Lower Gate - River Leaf After Straightening"; #6; small view including workers and workboat |
15 |
1 |
1 |
Kentucky River |
Lock No. 1 |
4/2/1918 |
"Lower Gate, River Leaf"; #5; small view including workers |
15 |
1 |
1 |
Kentucky River |
Lock No. 1 |
4/5/1918 |
"Lower Gate, river leaf. Read to re-mount"; small view including houses, workers, and workboat |
15 |
1 |
1 |
Kentucky River |
Lock No. 1 |
4/5/1918 |
"Lower Gate, River Leaf, straightened"; #7; small view inlcuding workers, workboat, and houses |
15 |
4 |
1 |
Kentucky River |
Lock No. 4 |
|
"1919 - 2nd Cinti, O, Dist; Osgood, R.R. Crane"; #10; small view of men with machinery |
15 |
14 |
1 |
Kentucky River |
Lock No. 14 |
6/1/1919 |
"No. 8; Concrete wall block 16 hours after filling with water" |
15 |
8 |
1 |
Kentucky River |
Dam No. 8 |
|
"1919; Flow Of Water Over Apron"; #72; small view |
15 |
8 |
1 |
Kentucky River |
Dam No. 8 |
|
"1919; Flow Over No. 8 Dam"; #93; small view |
15 |
8 |
1 |
Kentucky River |
Lock No. 8 |
9/9/1920 |
"Reconstruction of Upper Slope of Dam.; Preparing to concrete the upper slope"; #75; small view including workers |
15 |
8 |
1 |
Kentucky River |
Lock No. 8 |
9/8/1920 |
"No. 78; Reconstruction of Upper Slope of Dam.; Dam, apron and abutment previous to beginning work"; #74; small view of dam |
15 |
8 |
1 |
Kentucky River |
Lock No. 8 |
9/17/1920 |
"No. 82; Reconstruction of Upper Slope of Dam.; Surfacing upper slope with concrete"; #76; small view including workers |
15 |
8 |
1 |
Kentucky River |
Lock No. 8 |
9/26/1920 |
"No. 106; Reconstruction of Upper Slope of Dam.; Upper slope concrete - completed."; #77; small view |
15 |
8 |
1 |
Kentucky River |
Lock No. 8 |
9/26/1920 |
"No. 107; Reconstruction of Upper Slope of Dam.; Upper slope of dam - completed."; #78; small view |
15 |
9 |
1 |
Kentucky River |
Lock No. 9 |
10/10/1919 |
"No. 121; Construction of Lower Guide Wall.; Lower guide wall foundation crib completed."; #83; small view including barge and houses |
15 |
9 |
1 |
Kentucky River |
Lock No. 9 |
10/2/1919 |
"No. 102; Same as No. 101, except is closer view - "Whirley" and broken boom that killed E. Bentley - was standing where Mr. Vaughn appears."; #81; small view including man, and houses |
15 |
9 |
1 |
Kentucky River |
Lock No. 9 |
10/2/1919 |
"No. 104; The break in "Whirley" Boom-Tip... That caused the death of Ernest Bentley." (more description included); #82; small view |
15 |
9 |
1 |
Kentucky River |
Lock No. 9 |
7/16/1920 |
"No. 238; Construction of Lower Guide Wall. Laying concrete footing on lower guide wall crib."; #84; small view including workers, barges and workboats |
15 |
9 |
1 |
Kentucky River |
Lock No. 9 |
4/14/1921 |
"No. 329; Upper Guide Pile Clusters Completed."; #86; small view including men, steamship and workboat |
15 |
9 |
1 |
Kentucky River |
Lock No. 9 |
3/20/1921 |
"No. 317; Renewal of Upper Portions of Upper Guard Piers in Concrete. Condition of upper triangular guard piers"; #85; small view |
15 |
9 |
1 |
Kentucky River |
Lock No. 9 |
9/23/1919 |
"No. 85; Construction of Lower Guide Wall. Constructing lower guide wall foundation."; #80; small view including person, house, and workboat |
15 |
1 |
1 |
Kentucky River |
Lock No. 1 |
8/8/1919 |
"No. 21; Lower Guard Wall, 230 feet long; completed"; #14; small view |
15 |
1 |
1 |
Kentucky River |
Lock No. 1 |
8/8/1919 |
"No. 23; Repairs made at lower end of Abutment crib; also showing flow of water over dam and apron."; #16; small view |
15 |
1 |
1 |
Kentucky River |
Lock No. 1 |
8/8/1919 |
"No. 22; Lower Guard Wall, rear view, completed."; #15; small view including dog |
15 |
1 |
1 |
Kentucky River |
Lock No. 1 |
8/8/1919 |
"No. 29; Oak sheathing on down-stream face of lower gate completed. Work done by diver in greater part."; #13; small view including workers |
15 |
4 |
1 |
Kentucky River |
Dam No. 4 |
8/14/1919 |
"No. 48; General views - Hemp Mill - Only Water Power Plant on Kentucky River."; #18; small view including plant, water tower and houses |
15 |
4 |
1 |
Kentucky River |
Lock No. 4 |
8/14/1919 |
"No. 52; Service Buildings; Sawmill (under construction), Power House, Machine Shop, Blacksmith Shop and Storehouse"; #20; small view including people |
15 |
4 |
1 |
Kentucky River |
Lock No. 4 |
8/14/1919 |
"No. 49; Service Buildings; Machine and Blacksmith Shops"; #19; small view |
15 |
10 |
1 |
Kentucky River |
Lock No. 10 |
8/6/1919 |
"No. 40; Dredge Carrollton and Towboat Comet No. 2 Dredging Lower Guard Wall Foundation"; #17; small view including workboats and people |
15 |
1 |
1 |
Kentucky River |
Lock No. 1 |
8/8/1919 |
"No. 24; Repairing Upper Guard Crib damaged by ice. Completed Aug. 11, 1919."; #21; small view including workers |
15 |
1 |
1 |
Kentucky River |
Lock No. 1 |
8/8/1919 |
"No. 26; Derrickboat No. 3, Lowering Concrete Mixer Tower To Pass Under Bridges."; #23; small view including workers and workboat |
15 |
1 |
1 |
Kentucky River |
Lock No. 1 |
8/8/1919 |
"No. 39; Derrick Boat No. 3, Preparing To Lower The Mixer Tower"; #24; small view including workers and workboat |
15 |
1 |
1 |
Kentucky River |
Lock No. 1 |
8/8/1919 |
"No. 25; Repairing Upper Guard Crib damaged by ice. Completed Aug. 11, 1919."; #22; small view including workers |
15 |
1 |
1 |
Kentucky River |
Lock No. 1 |
1/17/1920 |
"No. 137; Scour of River Wall at Upper Gate"; #28; small view |
15 |
1 |
1 |
Kentucky River |
Lock No. 1 |
1/17/1920 |
"No. 136; Dismounted Land Leaf Of Lower Gate.- Derrick Boat No. 3"; #27; small view including worker and workboats |
15 |
1 |
1 |
Kentucky River |
Lock No. 1 |
1/17/1920 |
"No. 134; Dismounted Leaf of Lower Gate."; #25; small view including people and houses |
15 |
1 |
1 |
Kentucky River |
Lock No. 1 |
1/17/1920 |
"No. 135; Dismounted Land Leaf Of Lower Gate"; #26; small view including people and houses |
15 |
1 |
1 |
Kentucky River |
Lock No. 1 |
1/17/1920 |
"No. 138; Lever Used to Mount The Gate Leaf..." (more description included); #29; small view including people and workboat |
15 |
1 |
1 |
Kentucky River |
Lock No. 1 |
1/19/1920 |
"No. 144; Scour of River Wall caused by flood of January, 1920"; #31; small view including workboat |
15 |
1 |
1 |
Kentucky River |
Lock No. 1 |
1/17/1921 |
"No. 309; ...heavy fastenings on the lower gate to hold it in closed position during floods."; #32; small view including men, dog and houses |
15 |
1 |
1 |
Kentucky River |
Lock No. 1 |
1/17/1920 |
"No. 139; ... Land Leaf of Lower Gate Dismount... Flood of Jan'y. 1920; Land leaf of lower gate remounted"; #30; small view including workers and house |
15 |
1 |
1 |
Kentucky River |
Lock No. 1 |
4/22/1921 |
"No. 333; Repair Damage by Ice to Upper Guard Wall and Piers. Repairs completed."; #33; small view |
15 |
2 |
1 |
Kentucky River |
Lock No. 2 |
4/5/1921 |
"Looking across river from abutment side. Houses are not directly back of lock as usually placed."; #34; medium view including houses and lock |
15 |
2 |
1 |
Kentucky River |
Lock No. 2 |
4/5/1921 |
"Looking up-stream"; #35; medium view including lock and houses |
15 |
2 |
1 |
Kentucky River |
Lock No. 2 |
4/22/1921 |
"No. 330; New Lower Gate. Condition of Old Gate"; #36; small view of old gates including man and workboat in photo |
15 |
3 |
1 |
Kentucky River |
Lock No. 3 |
4/5/1921 |
"Looking across river from abutment side."; #38; medium view including lock and houses |
15 |
3 |
1 |
Kentucky River |
Lock No. 3 |
4/5/1921 |
"Looking up-stream"; #39; medium view of lock |
15 |
3 |
1 |
Kentucky River |
Lock No. 3 |
4/5/1921 |
"Looking down-stream from abutment side."; #40; medium view including lock and houses |
15 |
2 |
1 |
Kentucky River |
Lock No. 2 |
8/30/1921 |
"No. 357; Renewal of Lower Gate. Old Lower Gate removed."; #37; small view including workboat |
15 |
3 |
1 |
Kentucky River |
Lock No. 3 |
9/10/1918 |
"Abutment Crib"; #41; small view |
15 |
3 |
1 |
Kentucky River |
Lock No. 3 |
9/10/1918 |
"Abutment Crib"; #42; small view |
15 |
3 |
1 |
Kentucky River |
Lock No. 3 |
9/10/1918 |
"Abutment Crib"; #43; small view |
15 |
3 |
1 |
Kentucky River |
Lock No. 3 |
9/10/1918 |
"Abutment Crib"; #44; small view |
15 |
3 |
1 |
Kentucky River |
Lock No. 3 |
9/10/1918 |
"Abutment Crib; Straight down the Wall from Top of Abutment"; #45; small view including men |
15 |
3 |
1 |
Kentucky River |
Lock No. 3 |
9/25/1919 |
"No. 91; New Upper and Lower Gates. Upstream face of lower gate (old)"; #46; small view including men and old gates |
15 |
3 |
1 |
Kentucky River |
Dam No. 3 |
10/11/1919 |
"No. 111; Raising Crest, 43% Done. Raining"; #48; small view including workboat |
15 |
3 |
1 |
Kentucky River |
Dam No. 3 |
10/11/1919 |
"No. 112; Raising the Crest, 43% Completed, Snapshot in Light Rain."; #49; small view including workers and machinery |
15 |
3 |
1 |
Kentucky River |
Lock No. 3 |
9/25/1919 |
"No. 93; Upper and Lower Gates. Upstream face of upper gate (old)."; #47; small view |
15 |
4 |
1 |
Kentucky River |
Lock No. 4 |
4/1/1921 |
"Looking down-stream - general view. Coal tipple and storage pile in center of photograph; material yard to left of coal tipple."; #52; medium view from hillside including houses, lock, dam, ships and water tower |
15 |
4 |
1 |
Kentucky River |
Lock No. 4 |
4/1/1921 |
"Looking across river from below abutment. Coal and material yards at left; service buildings back of flag-pole near upper left corner of slope paving."; #53; medium view including lock, dam, houses, and buildings |
15 |
4 |
1 |
Kentucky River |
Lock No. 4 |
4/1/1921 |
"Looking across river toward abutment. Building at abutment end of dam is hemp manufacturing plant of Kentucky River Mills; only water-power plant on Kentucky River."; #54; medium view including lock, dam, plant, man, and houses |
15 |
7 |
1 |
Unknown |
No. 7 |
|
"1917; Setting No. 7 - Gate - Derrick No. 5 and the "Whirley""; #69; small view including people, workboats, steamship and house |
15 |
4 |
1 |
Kentucky River |
Lock No. 4 |
|
"1919; 2nd Cinti, O, Dist; Osgood, R.R. Crane"; #56; small view of workers and machinery |
15 |
4 |
1 |
Kentucky River |
Lock No. 4 |
8/14/1919 |
"No. 49; Service Buildings; Machine and Blacksmith Shops"; #55; small view |
15 |
4 |
1 |
Kentucky River |
Lock No. 4 |
12/6/1921 |
"No. 379; Miscellaneous - Chanoine Wickets for Dam #30, Ohio River, under construction"; #58; small view including workers and building |
15 |
4 |
1 |
Kentucky River |
Lock No. 4 |
3/21/1920 |
"No. 179; Service Buildings; Sawmill, carpenter shop and power house completed."; #57; small view including men and buildings |
15 |
5 |
1 |
Kentucky River |
Lock No. 5 |
4/1/1921 |
"Looking up-stream from below abutment."; #59; medium view including lock, dam, and houses |
15 |
5 |
1 |
Kentucky River |
Lock No. 5 |
4/1/1921 |
"Looking down-stream from abutment side."; #60; medium view from hillside, including lock, dam and houses |
15 |
5 |
1 |
Kentucky River |
Lock No. 5 |
3/21/1920 |
"No. 178; Reconstruction of Lower Gate. In yard at Lock No. 4. Lower gate (land leaf) for Lock No. 5 - completed."; #63; small view including house |
15 |
5 |
1 |
Kentucky River |
Lock No. 5 |
12/8/1920 |
"No. 295; Reconstruction of Lower Gate. Derrickboats Nos. 4 and 5 mounting new lower gate."; #64; small view including worker and workboat |
15 |
5 |
1 |
Kentucky River |
Lock No. 5 |
3/21/1920 |
"No. 177; Reconstruction of Lower Gate. In yard at Lock No. 4. Lower gate (river leaf) for Lock No. 5 - completed."; #62; small view |
15 |
5 |
1 |
Kentucky River |
Lock No. 5 |
9/26/1919 |
"No. 96; Reconstruction of Lower Gate. Land leaf of lower gate (old)."; #61; small view including workers |
15 |
6 |
1 |
Kentucky River |
Lock No. 6 |
3/21/1921 |
"Looking up-stream from below abutment."; #65; medium view including lock, dam, ship and houses |
15 |
6 |
1 |
Kentucky River |
Lock No. 6 |
4/6/1921 |
"Looking down-stream from above abutment."; #66; medium view including lock, ship, and houses |
15 |
6 |
1 |
Kentucky River |
Lock No. 6 |
9/8/1919 |
"No. 76; Upper Triangular Guard Pier. Upper triangular guard pier rebuilt in concrete - completed."; #67; small view |
15 |
7 |
1 |
Kentucky River |
Lock No. 7 |
4/9/1921 |
"Looking down-stream from abutment side."; #68; medium view including lock, and houses |
15 |
8 |
1 |
Kentucky River |
Lock No. 8 |
3/21/1921 |
"Looking up-stream from below lock."; #70; medium view including lock, dam, ship, people and house |
15 |
8 |
1 |
Kentucky River |
Lock No. 8 |
4/6/1921 |
"Looking toward abutment."; #71; medium view including houses and lock |
15 |
9 |
1 |
Kentucky River |
Lock No. 9 |
3/20/1921 |
"Looking up-stream from below abutment."; #79; medium view including lock, dam, ships, bridge, and houses |
15 |
10 |
1 |
Kentucky River |
Lock No. 10 |
|
"No. 17; "Williams' Quarry" - Derrickboat No. 5 and Towboat Gregory."; #12; small view |
15 |
0 |
1 |
Kentucky River |
Misc |
|
"No. 13; 1919; Kentucky River, Pool No. 11 at Irvine, Gasoline boat "Nelson C." with tow of log rafts. All this type of boat work ahead of the tow and in back-motion."; #11; small view including people, workboat and buildings |
15 |
14 |
2 |
Kentucky River |
Lock No. 14 |
5/26/1920 |
"No. 212; Derrickboat No. 4, and Concrete Mixer No. 25"; #171; small view including workboats and houses |
15 |
14 |
2 |
Kentucky River |
Lock No. 14 |
5/26/1920 |
"No. 216; Repairing washout of slope paving caused by flood of January 23, 1920"; #172; small view including workers and watertower |
15 |
14 |
2 |
Kentucky River |
Lock No. 14 |
5/26/1920 |
"No. 218; New Road On Abutment Side"; #173; small view including person |
15 |
12 |
2 |
Kentucky River |
Dam No. 12 |
|
"1919; Dam No. 12 partly raised"; #112; small view of dam including person |
15 |
12 |
2 |
Kentucky River |
Lock No. 12 |
2/17/1919 |
"Lock No. 12; Damaged by "Onward.""; #114; small view of lock gates |
15 |
12 |
2 |
Kentucky River |
Lock No. 12 |
2/17/1919 |
"Lock No. 12; Lower Gate Damaged by "Onward""; #113; small view of lock gates |
15 |
12 |
2 |
Kentucky River |
Lock No. 12 |
2/17/1919 |
"Lock No. 12; Lower Gate Damaged by "Onward""; #111; small view of gates close up |
15 |
12 |
2 |
Kentucky River |
Lock No. 12 |
8/5/1919 |
"No. 5; Forms for hollow reinforced concrete wall blocks, showing forms ready to pour and also inside forms and reinforcing."; #118; small view |
15 |
12 |
2 |
Kentucky River |
Lock No. 12 |
8/5/1919 |
"No. 4; Mounting forms and plant for making reinforced Concrete Wall Blocks."; #117; small view including people and houses |
15 |
12 |
2 |
Kentucky River |
Lock No. 12 |
8/5/1919 |
"No. 3; Foundation Crib and Piles sunk and filled with stone."; #116; small view of dam |
15 |
12 |
2 |
Kentucky River |
Lock No. 12 |
2/17/1919 |
"Lower Gate Damaged by "Onward""; #115; small view of gates close up |
15 |
12 |
2 |
Kentucky River |
Dam No. 12 |
10/14/1919 |
"No. 113; Crest submerged"; #122; small view of dam |
15 |
12 |
2 |
Kentucky River |
Lock No. 12 |
8/27/1919 |
"No. 72; Repairing Upper Valves and Painting Upper Gate. Head-bay dam raised for repairing upper valves."; #120; small view of gates |
15 |
12 |
2 |
Kentucky River |
Lock No. 12 |
8/5/1919 |
"No. 6; Forms for hollow reinforced concrete wall blocks, showing forms ready to pour and also inside forms and reinforcing."; #119; small view including workers |
15 |
12 |
2 |
Kentucky River |
Lock No. 12 |
8/27/1919 |
"No. 73; Repairing Upper Valves and Painting Gate. Corrosion of upper gate below pool. Gate cleaned and painted - pitting not deep."; #121; small view close up |
15 |
12 |
2 |
Kentucky River |
Lock No. 12 |
9/13/1920 |
"No. 260; Construction of Movable Crest. Forms in place and filled for masonry of A-frame crest, submerged by rise, without damage."; #126; small view of dam |
15 |
12 |
2 |
Kentucky River |
Lock No. 12 |
10/30/1919 |
"No. 126; Reconstruction of Movable Crest. Poiree needle crest before replacing with A-frame"; #125; small view |
15 |
12 |
2 |
Kentucky River |
Dam No. 12 |
10/14/1919 |
"No. 116; Crest submerged"; #124; small view |
15 |
12 |
2 |
Kentucky River |
Dam No. 12 |
10/14/1919 |
"No. 115; Crest submerged; Raining"; #123; small view |
15 |
12 |
2 |
Kentucky River |
Lock No. 12 |
9/10/1920 |
"No. 267; Reconstruction of Movable Crest. Placing concrete for A-frame crest of Dam 12."; #127; small view including workers and workboats |
15 |
12 |
2 |
Kentucky River |
Lock No. 12 |
10/27/1920 |
"No. 277; Reconstruction of Movable Crest. A-frame crest in operation, looking up-stream."; #129; small view |
15 |
12 |
2 |
Kentucky River |
Lock No. 12 |
10/27/1920 |
"No. 279; Reconstruction of Movable Crest. A-frame crest in operation; looking toward abutment."; #130; small view |
15 |
12 |
2 |
Kentucky River |
Lock No. 12 |
10/19/1920 |
"No. 269; Reconstruction of Movable Crest. A-frame crest in operation, view looking up-stream."; #128; small view including person |
15 |
12 |
2 |
Kentucky River |
Lock No. 12 |
2/8/1921 |
"No. 311; Rip-rap Bank Below Lower Guide Wall. Rip-rap completed."; #131; small view including barge, workboat and houses |
15 |
12 |
2 |
Kentucky River |
Dam No. 12 |
7/17/1922 |
"No. 424; Repairs to Crest Completed"; #132; small view of dam taken from one side |
15 |
14 |
2 |
Kentucky River |
Lock No. 14 |
|
"Concrete Blocks on Wall"; #144; small view including worker and bridge |
15 |
0 |
2 |
Kentucky River |
Heidelberg Bridge |
|
"Ky-Riv-1919; Heidelberg Bridge, L&N"; #145; small view of bridge |
15 |
14 |
2 |
Kentucky River |
Lock No. 14 |
|
"1919; Rock Fault And Guard Wall Under Construction"; #146; small view |
15 |
14 |
2 |
Kentucky River |
Lock No. 14 |
|
"1919; Barged Derrick No. 26"; #147; small view including workboat, workers, bridge and watertower |
15 |
14 |
2 |
Kentucky River |
Lock No. 14 |
|
"1919; Concrete Block 16 Hours After Filling With Water"; #148; small view |
15 |
14 |
2 |
Kentucky River |
Dam No. 14 |
|
"1919; 2-10" Stop Logs On Crest"; #149; small view of dam |
15 |
14 |
2 |
Kentucky River |
Lock No. 14 |
8/5/1919 |
"Lower Guard Wall completed except coping… (illegible)"; #150; small view of guard wall |
15 |
14 |
2 |
Kentucky River |
Lock No. 14 |
8/5/1919 |
"No. 7; Derrickboat No. 4 loading concrete wall blocks on a barge for wall at Lock 13."; #151; small view of workboat |
15 |
14 |
2 |
Kentucky River |
Lock No. 14 |
8/5/1919 |
"No. 27; Lower Guard Wall Complete Except Coping"; #152; small view of guard wall |
15 |
4 |
2 |
Kentucky River |
Lock No. 4 |
8/14/1919 |
"No. 52; Sawmill (under construction), Power House, Machine Shop, Blacksmith Ship and Storehouse, Lock 4"; #153; small view |
15 |
14 |
2 |
Kentucky River |
Lock No. 14 |
|
"1919; Barge 26 - "Whirley"; "Whirley" and Sand Pump"; #154; small view including workers, barges and houses |
15 |
14 |
2 |
Kentucky River |
Lock No. 14 |
1/23/1920 |
"No. 144A; Repairing Washout of Slope Paving. Looking down from lower gate."; #155; small view including workers, bridge and watertower |
15 |
14 |
2 |
Kentucky River |
Lock No. 14 |
1/28/1920 |
"No. 139, No. 140, No. 141, No. 142, No. 143; Panoramic View Through 180 Degrees Showing Washout Of Jan 23, 1920."; panoramic view including houses, people, water tower, and bridge |
15 |
14 |
2 |
Kentucky River |
Lock No. 14 |
1/29/1920 |
"No. 146; Washout of Jan 23, 1920"; #157; small view including people and houses |
15 |
14 |
2 |
Kentucky River |
Lock No. 14 |
1/29/1920 |
"No. 147; Repairing washout of Slope Paving. Washout of slope paving caused by flood of January 23, 1920; looking up-stream from lower guide wall."; #158; small view including people and houses |
15 |
14 |
2 |
Kentucky River |
Dam No. 14 |
|
Panoramic view of Dam No. 14, including lock, dam and houses; #159 |
15 |
14 |
2 |
Kentucky River |
Lock No. 14 |
1/29/1920 |
"No. 148; Repairing Washout of Slope Paving. Washout of slope paving caused by flood of January 23, 1920; looking up-stream from end of lower guide wall."; #160; small view including workers |
15 |
14 |
2 |
Kentucky River |
Lock No. 14 |
|
"Jan 1920; View From The Abutment"; #161; small view including dam and houses |
15 |
14 |
2 |
Kentucky River |
Lock No. 14 |
5/26/1920 |
"No. 219; New Road on Abutment Side"; #162; small view |
15 |
14 |
2 |
Kentucky River |
Lock No. 14 |
5/26/1920 |
"No. 220; Reconstruction of Movable Crest. Crest of dam previous to changing to A-frame type."; #163; small view of dam |
15 |
14 |
2 |
Kentucky River |
Lock No. 14 |
10/22/1920 |
"No. 274; Reconstruction of Movable Crest. Placing concrete for A-frame crest."; #164; small view including workers |
15 |
14 |
2 |
Kentucky River |
Lock No. 14 |
10/27/1920 |
"No. 280; Reconstruction of Movable Crest. Concrete for A-frame crest completed; looking up-stream."; #165; small view of dam |
15 |
14 |
2 |
Kentucky River |
Lock No. 14 |
10/27/1920 |
"No. 281; Reconstruction of Movable Crest. Concrete for A-frame crest: looking toward abutment"; #166; small view of dam |
15 |
14 |
2 |
Kentucky River |
Lock No. 14 |
6/15/1921 |
"No. 8; Upper Guide Pile Clusters. Clusters under construction."; #167; small view including workboat and houses |
15 |
14 |
2 |
Kentucky River |
Lock No. 14 |
6/21/1921 |
"No. 349; Repairs to upper wall valves. Head-bay girder and needles in place for unwatering upper valves for repair."; #168; small view of wall |
15 |
14 |
2 |
Kentucky River |
Lock No. 14 |
6/21/1921 |
"No. 351; Repairs to upper wall valves. Valves under repair behind the head-bay dam."; #169; small view including workers and houses |
15 |
14 |
2 |
Kentucky River |
Lock No. 14 |
1/28/1920 |
"No. 152; Repairing Washout of Slope Paving. Washout of slope paving caused by flood of January 23, 1920; washout of paving and rip-rap protection below the lower guide wall."; #170; small view including lock, dam and houses |
15 |
10 |
2 |
Kentucky River |
Lock No. 10 |
6/2/1920 |
"No. 225; Abutment Wall Banked With Rock To Stop Sliding"; #91; small view |
15 |
10 |
2 |
Kentucky River |
Lock No. 10 |
8/6/1919 |
"No. 40; Dredge Carrollton And Towboat Comet No. 2 Dredging Lower Guard Wall Foundation"; #89; small view including ship and workboat |
15 |
10 |
2 |
Kentucky River |
Lock 10 |
|
"Dumping scow of Rock at Lock 10"; #88; small view including workboat |
15 |
10 |
2 |
Kentucky River |
Lock No. 10 |
1/31/920 |
"No. 155; Protecting Sliding Abutment. Sliding abutment protection wall."; #90; small view |
15 |
10 |
2 |
Kentucky River |
Lock No. 10 |
6/2/1920 |
"No. 229; Rust On Upper Side Of Upper Gate Land Leaf"; No. 94; small view of rusty gate |
15 |
10 |
2 |
Kentucky River |
Lock No. 10 |
7/29/1920 |
"No. 248; Construction of Lower Guide Wall; Concreting footing course of the lower guide wall."; #95; small view including workboat |
15 |
10 |
2 |
Kentucky River |
Lock No. 10 |
6/2/1920 |
"No. 227; Cleaning Upper Gates & Repairing Upper Wall Valves. Repairing upper wall valves and cleaning gate behind the head-bay dam."; #93; small view including workers |
15 |
10 |
2 |
Kentucky River |
Lock No. 10 |
6/2/1920 |
"No. 226; Headbay Girder And Dam In Place"; #92; small view |
15 |
10 |
2 |
Kentucky River |
Lock No. 10 |
5/5/1921 |
"No. 337; Upper Guide Pile Clusters. Clusters under construction."; #98; small view including workboat |
15 |
10 |
2 |
Kentucky River |
Lock No. 10 |
9/12/1921 |
"No. 363; Upper Guide Pile Clusters - work completed."; #99; small view |
15 |
10 |
2 |
Kentucky River |
Lock No. 10 |
4/6/1921 |
"No. 324; Road on Abutment Side. Condition of road before reconstruction."; #97; small scenic view |
15 |
10 |
2 |
Kentucky River |
Lock No. 10 |
4/6/1921 |
"No. 322; Road on Abutment Side. Condition of road before reconstruction."; #96; small view |
15 |
10 |
2 |
Kentucky River |
Lock No. 10 |
12/12/1921 |
"No. 382; Road on Abutment Side - Road Completed"; #101; small view |
15 |
10 |
2 |
Kentucky River |
Lock No. 10 |
9/12/1921 |
"No. 364; Construction of Lower Guide Wall. Wall Completed."; #100; small view including guide wall, canoe and barge |
15 |
13 |
2 |
Kentucky River |
Lock No. 13 |
|
"1919 - Lock No 13 - Ky Riv."; #135; small view including ship, houses, and lock |
15 |
13 |
2 |
Kentucky River |
Lock No. 13 |
8/5/1919 |
"No. 2; Lower Guard Wall, completed except...(illegible) tilt of hollow re-inforced Concrete Blocks"; #136; small view including workers |
15 |
13 |
2 |
Kentucky River |
Lock No. 13 |
8/5/1919 |
"No. 31; Lower Guard Wall completed, except coping (rear view)."; #137; small view including people |
15 |
13 |
2 |
Kentucky River |
Dam No. 13 |
|
"1919; No. 64B; Reconstruction of Movable Crest. Dam and Poiree needles before replacing by A-frame crest."; #138; small view |
15 |
13 |
2 |
Kentucky River |
Lock No. 13 |
10/19/1920 |
"No. 269; Reconstruction of Movable Crest. A-frame crest in operation, view looking up-stream"; #139; small view including person, dam and workboat |
15 |
13 |
2 |
Kentucky River |
Lock No. 13 |
10/19/1920 |
"No. 271; Reconstruction of Movable Crest. A-frame crest in operation, view looking down-stream."; #140; small view including canoe and workboat |
15 |
11 |
2 |
Kentucky River |
Lock No. 11 |
8/20/1919 |
"No. 59; Raising Dam 6 Feet in Concrete. Dam, Poiree needle crest and abutment."; #104; small view |
15 |
11 |
2 |
Kentucky River |
Lock No. 11 |
8/17/1920 |
"No. 257; Raising Dam Six Feet in Concrete. Placing forms for replacing movable crest with concrete."; #106; small view including workers and workboat |
15 |
11 |
2 |
Kentucky River |
Lock No. 11 |
11/25/1919 |
"No. 131; Construction of Lower Guard Wall. Laying concrete footing on lower guard crib."; #105; small view including workboats, barge and people |
15 |
11 |
2 |
Kentucky River |
Lock No. 11 |
8/21/1920 |
"No. 265; Raising Dam Six Feet in Concrete. Placing last yard of concrete in masonry dam crest."; #108; small view including workboat |
15 |
11 |
2 |
Kentucky River |
Lock No. 11 |
8/18/1920 |
"No. 258; Raising Dam Six Feet in Concrete. Placing concrete in dam crest."; #107; small view including workboat, houses and barges |
15 |
13 |
2 |
Kentucky River |
Lock No. 13 |
3/18/1921 |
"Looking up-stream from below abutment. Note failing retaining wall below abutment."; #133; medium view including lock, dam and houses |
15 |
14 |
2 |
Kentucky River |
Lock No. 14 |
3/17/1921 |
"Looking up-stream from L. & N. R. R. bridge"; #142; medium view including ship, lock, dam, and houses |
15 |
14 |
2 |
Kentucky River |
Lock No. 14 |
3/17/1921 |
"Looking up-stream from below abutment"; #143; medium view including ship, lock, dam, and houses |
15 |
10 |
2 |
Kentucky River |
Lock No. 10 |
3/19/1921 |
"Looking up-stream from below abutment"; #87; medium view including workboat, ship, lock, dam and houses |
15 |
11 |
2 |
Kentucky River |
Lock No. 11 |
3/19/1921 |
"Looking up-stream from below abutment"; #102; medium view including houses, workboat, ship, lock, and dam |
15 |
11 |
2 |
Kentucky River |
Lock No. 11 |
8/6/1919 |
"No. 18; Crib foundation for lower guard wall; framed, sunk, piles driven and nearly filled with stone."; #103; small view |
15 |
12 |
2 |
Kentucky River |
Lock No. 12 |
3/18/1921 |
"Looking up-stream from below abutment."; medium view including houses, lock, dam, workboat, and ship |
15 |
13 |
2 |
Kentucky River |
Lock No. 13 |
7/15/1921 |
"No. 354; Lower Guard Wall - completed"; #141; small view |
15 |
12 |
2 |
Kentucky River |
Lock No. 12 |
3/18/1921 |
"Looking up-stream from below abutment."; #110; medium view including houses, lock, dam, workboat, and ship |
15 |
0 |
3 |
Ohio River |
Flint Island Dike |
8/20/1892 |
"#979; 683 miles from Pittsburg; "A History of the Louisville District Corps of Engineers United States Army"; by R. Johnson; published 1974 or 1975; page 47"; H15-OM-101; picture of a dike |
15 |
0 |
4 |
Ohio River |
French Island Dike |
9/8/1892 |
"No. 989; 761 miles from Pittsburg"; 28016 (on back); picture of a dike |
15 |
0 |
5 |
Ohio River |
Misc |
10/5/1892 |
"No. 996; View up Ohio River, back of Tradewater Isl."; view of river including canoe and raft |
15 |
0 |
6 |
Ohio River |
Caseyville Upper Dike and Battery Rock |
10/8/1892 |
"#1001; 860 miles from Pittsburg"; 28022; view of dike and battery rock from river bank |
15 |
0 |
7 |
Cincinnati, OH |
Kentucky Dike |
1/28/1893 |
"Ice Gorge at Four Mile Bar above Cincinnati O.; View downstream showing rest of Kentucky dike" |
15 |
0 |
8 |
Ohio River |
Ice Gorge at Wolf Creek |
1/31/1893 |
"#1020A; 671 miles from Pittsburg"; view of ice gorge |
14 |
0 |
8 |
Ohio River |
Ice Gorged at Wolf Creek |
1/27/1893 |
"#1019; 673 miles from Pittsburg"; view of ice gorged below Wolf Creek, including wood and raft on shore |
15 |
0 |
9 |
Ohio River |
Cincinnati Harbor |
1/26/1893 |
"#1031; Cincinnati Harbor; View upstream from Cantilever Bridge"; view of bridge during winter, including ships, ice, buildigs, and barges |
15 |
0 |
10 |
Brown Island |
Wrecking Sunken Coal Boats |
3/20/1883 |
"#632; Wrecking sunken Coal Boats at Brown Island"; 28009 (on back); view of river including ship and workboat |
15 |
0 |
10 |
Ohio River |
Marietta Dike |
7/17/1891 |
"#915; U.S. Dredge "Ohio"; Removing logs at Marietta Dike"; view of river including ship, workboat and barge |
15 |
0 |
10 |
Unknown |
Maneuver Boat |
7/30/1890 |
"#837; Maneuvering Boat"; 40VM-2; picture of a maneuver boat with men on it |
15 |
0 |
10 |
Ohio River |
Warsaw Bar |
|
"Oct. 1884; #344; Dredging at Warsaw Bar; View showing Florence, Ind."; view of river including workboats, barges, and houses in background |
15 |
0 |
10 |
Unknown |
Dredge |
8/31/1882 |
"#106; Chartered Dredge Tender, "Resolute"; H40-VO-93; 28014 (on back); view of dredge with men on it |
15 |
0 |
10 |
Unknown |
Dredge |
|
"Oct. 1881; #16; Chartered Dredge Tender "Tron City""; view of dredge with men on it |
15 |
0 |
10 |
Ohio River |
Dump Scow and Scraper |
|
"Nov. 1881; #21; Dump scow and Scraper"; 28012 (on back); view of workboat with man on it, with houses, bridge, and workboats in background |
15 |
0 |
11 |
Ohio River |
Dredge |
10/24/1882 |
"#125; U.S. Dredge "Oswego" at Rowland's Race"; photo of dredge with men on it |
15 |
0 |
11 |
Ohio River |
Dredges |
2/3/1893 |
"#1023; Ohio River Dredges in Winter, Mouth of Little Blue River. After Breakup of Wolf Creek Gorge.; 673 miles from Pittsburg."; 28021 (on back); photo of two dredges in winter |
15 |
0 |
11 |
Ohio River |
Dredges |
1/15/1893 |
"#1016; Ohio River Dredges in Winter Quarters, Mouth of Little Blue River.; 673 miles from Pittsburg."; H40-VO-80; 28027 (on back); photo of ship, dredges and barge in winter |
15 |
0 |
11 |
Ohio River |
Dredges |
1/16/1893 |
"#1018; Ohio River Dredges in Winter Quarters, Mouth of Little Blue River.; 673 miles from Pittsburg."; H40-VO-81; photo of dredges and man in winter, with buildings visible in background |
15 |
0 |
11 |
Ohio River |
Dredges |
2/2/1893 |
"#1022; Ohio River Dredges in Winter Quarters, Mouth of Little Blue River. Prepared for Breakup of Wolf Creek Gorge.; 673 miles from Pittsburg."; H40-VO-89; 28018 (on back); photo of dredges, ship, and barge |
15 |
0 |
11 |
Ohio River |
Dredge |
4/23/1889 |
"#705; U.S. Dredge "Oswego" on drydock at Allegheny, Pa."; photo of dredge in drydock with men around it and houses visible in corner |
15 |
0 |
11 |
Ohio River |
Dredge |
6/20/1887 |
"#538; U.S. Dredge "Oswego" at Steubenville Bridge destroying wrecked barges."; photo of dredge, workboat, canoes, men and bridge |
15 |
0 |
11 |
Ohio River |
Dredging |
6/30/1893 |
"#1064; Dredging at Mill Creek Bar.; 140 miles from Pittsburg."; H40-VO-97; 22559 (on back); photo of dredge, barge and men at work |
15 |
0 |
11 |
Ohio River |
Dredge |
3/20/1888 |
"#633; U.S. Dredge "Ohio" at Brown's Island Removing wrecks of Coal Boats. View downstream."; 28023 (on back); photo of ship, barge, and workboats |
15 |
0 |
12 |
Ohio River |
Davis Island Dam |
6/8/1891 |
"#892; Tows passing Davis Island Dam."; 22562 (on back); photo of towboats at work |
15 |
0 |
12 |
Ohio River |
Navigable Pass |
6/8/1891 |
"#889; Coal Tows descending through Navigable Pass"; 28024 (on back); view of towboat, with workboat in background |
15 |
0 |
12 |
Ohio River |
Workboat |
|
Photo of men on workboat alongside a dam |
15 |
0 |
12 |
Ohio River |
Dam |
|
View of dam area with several ships, and a lot of people in shot; H40-5 |
15 |
0 |
12 |
Ohio River |
Dam |
|
View of dam area with several ships, and a lot of people in shot; has marker on photo |
15 |
0 |
12 |
Ohio River |
Dam |
|
View of dam area with several ships, and a lot of people in shot |
15 |
0 |
12 |
Ohio River |
Dam |
|
View of dam area with several ships, and a lot of people in shot |
15 |
0 |
12 |
Ohio River |
Dam |
|
View of dam area with several ships, and a lot of people in shot |
15 |
0 |
12 |
Ohio River |
Dam |
|
View of dam area with several ships, and a lot of people in shot |
15 |
0 |
12 |
Ohio River |
Davis Island |
|
"Davis Island; Ohio River; 1881; Construction; Gen. View Cofferdam"; H15-OM-72; N-13; Old Number 28026 (on back); view of site from river bank, including people, workboats, and buildings |
15 |
0 |
12 |
Ohio River |
Towboat |
|
View of towboat pulling barges, with building in corner of photo; H40-VO-99; 22563 (on back) |
15 |
0 |
12 |
Ohio River |
Towboat |
|
"Towboat "Brown's Lane"; #12"; H40-VO-84; 22564 (on back); view of towboat pulling barges, with ship, bridge and workboat in background |
16 |
0 |
1 |
Ohio River |
Davis Island Dam |
7/31/1891 |
"#849; View from Davis Island"; 28019 (on back); view of dam from on side, including workboat, buildings and watertower in background |
16 |
0 |
1 |
Ohio River |
Davis Island Dam |
7/31/1890 |
"#842; View downstream from Right Bank."; view of lock and dam with rail lines and buildings in shot |
16 |
0 |
1 |
Ohio River |
Davis Island Dam |
10/7/1885 |
"#450; Celebration at Opening of Davis Island Dam."; 22575 (on back); photo of two steamships and a large crowd |
16 |
0 |
1 |
Ohio River |
Davis Island Dam |
10/7/1885 |
"#459; Celebration at Opening of Davis Island Dam."; photo of two steamships, a large crowd, and part of a building |
16 |
0 |
1 |
Ohio River |
Davis Island Dam |
10/7/1885 |
"#457; Celebration at Opening of Davis Island Dam."; photo of two steamships and a crowd |
16 |
0 |
2 |
Ohio River |
Misc |
1/24/1893 |
"#1028; View downstream from Suspension Bridge."; 28025; view of barges and bridge during winter |
16 |
0 |
3 |
Ohio River |
Dredging |
10/11/1892 |
"#1002; Dredging at The Sisters.; 897 miles from Pittsburg."; view of river with workboat in background |
16 |
0 |
4 |
Ohio River |
Misc |
9/11/1892 |
"#991; View downstream at Henderson, Ky.; 794 miles from Pittsburg."; view of river with barges in foreground, and ship and bridge in background |
16 |
0 |
0 |
Frankfort, KY |
Floating Plant |
|
"Frankfort Elevator Coal Co. - Floating Plant"; small view of river, including bridge, trolley car, workboats and houses |
16 |
0 |
0 |
Frankfort, KY |
Coal Digger & Floating Plant |
|
"Frankfort Elevator Coal Co. - Coal Digger and Floating Plant"; small view of river, including workboats and houses |
16 |
0 |
0 |
Frankfort, KY |
Coal Digger & Floating Plant |
|
"Frankfort Elevator Coal Co. - Coal Digger and Floating Plant"; small view of river, including workboats and houses |
16 |
0 |
0 |
Frankfort, KY |
Coal Digger & Floating Plant |
|
"Frankfort Elevator Coal Co. - Coal Digger and Floating Plant"; small view of river, including workboats and houses |
16 |
0 |
0 |
Frankfort, KY |
Office & Scales |
|
"Office and Scales"; small view of Frankfort Elevator Coal Co. building, including a person and a car |
16 |
0 |
0 |
Frankfort, KY |
Storage Bins |
|
"Storage Bins"; small view of Frankfort Elevator Coal Co. storage building |
16 |
0 |
0 |
Frankfort, KY |
Storage Yard |
|
"Frankfort Elevator Coal Co. - Storage Yard"; small view or storage yard with house visible in background |
16 |
0 |
0 |
Beattyville, KY |
Loading Tipple |
|
"The Beattyville Ky Co's River Coal Loading Tipple"; small view |
16 |
0 |
0 |
Beattyville, KY |
Loading Tipple |
|
"Irvine Coal and Feed Co's Loading Tipple near Beattyville, Ky"; #10A; small view including workboat and house in background |
16 |
0 |
0 |
Beattyville, KY |
Loading Tipple |
|
"The Beattyville Co's Coal Loading Tipple wrecked by flood"; #9A; small faded view including workboat |
16 |
0 |
0 |
Beattyville, KY |
Loading Tipple |
|
"Irvine Coal and Feed Co's Loading Tipple near Beattyville Ky."; small view including workboats, person and shack |
16 |
0 |
0 |
Beattyville, KY |
Loading Tipple |
|
"Irvine Coal and Feed Co's Coal Loading Tipple near Beattyville Ky."; small view including workboats and shack |
16 |
0 |
0 |
West Irvine, KY |
Log Elevator |
|
"Mobray and Robinson Saw Mill at West Irvine, Ky. - Log Elevator"; small view including water tower and house |
16 |
0 |
0 |
West Irvine, KY |
Log Elevator |
|
"Mobray and Robinson Saw Mill at West Irvine, Ky. - Log Elevator"; small view including water tower and house |
16 |
0 |
0 |
Unknown |
Loading Track & Trestle |
|
"L&N R.R. Co's Cross Tie Loading Track and Trestle"; #15A; small view including wood and rail car |
16 |
0 |
0 |
West Irvine, KY |
Cross Tie Hoist |
|
"L&N R.R. Co's West Irvine, Ky Cross Tie Hoist"; small view including bridge |
16 |
0 |
0 |
West Irvine, KY |
Cross Tie Hoist |
|
"L&N R.R. Co's West Irvine, Ky Cross Tie Hoist"; #17A; small view including water tower |
16 |
0 |
0 |
West Irvine, KY |
Cross Tie Hoist |
|
"L&N R.R. Co's West Irvine, Ky Cross Tie Hoist"; #18A; small view including workboat, water tower and houses |
16 |
0 |
0 |
West Irvine, KY |
Tie Loading Track & Trestle |
|
"L&N R.R. Co's Tie Loading Track & Trestle"; 19A; small view |
16 |
0 |
0 |
Beattyville, KY |
Terminal |
|
"Aetna Refining Co's Beattyville Terminal for Storing and Loading Crude Oil"; #20A; small view with houses in background |
16 |
0 |
0 |
Beattyville, KY |
Terminal |
|
"Aetna Refining Co's Beattyville Ky Terminal for Storing and Loading Crude Oil"; #21A; small view with houses in background |
16 |
0 |
0 |
Beattyville, KY |
Terminal |
|
"Aetna Refining Co's Beattyville Ky Terminal for Storing and Loading Crude Oil"; #22A; small view with houses in background |
16 |
0 |
0 |
Beattyville, KY |
Terminal |
|
"Aetna Refining Co's Beattyville Ky Terminal for Storing and Loading Crude Oil"; #23A; small view with houses in background |
16 |
0 |
0 |
Beattyville, KY |
Terminal |
|
"Aetna Refining Co's Tanks - Beattyville Ky. - Terminal for Storing and Loading Crude Oil"; #24A; small view |
16 |
3 |
0 |
Kentucky River |
Lock No. 3 |
9/10/1918 |
"Abutment Crib"; small view from one side of river |
16 |
3 |
0 |
Kentucky River |
Lock No. 3 |
9/10/1918 |
"Abutment Crib"; small view from one side of river, including lock and dam |
16 |
3 |
0 |
Kentucky River |
Lock No. 3 |
9/10/1918 |
"Abutment Crib"; small view close up, taken from river |
16 |
3 |
0 |
Kentucky River |
Lock No. 3 |
9/10/1918 |
"Abutment Crib"; small view close up, taken from river |
16 |
3 |
0 |
Kentucky River |
Lock No. 3 |
9/10/1918 |
"Abutment Crib - straight down the Wall from Top of Abutment"; small view including people |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
|
"Jan 1918; Lock Gates"; small view of gate installment process, including workboat and person |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
|
"Jan 1918; Lock Gates"; small view of gate installment process including two workboats and houses in background |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
|
"Jan 1918; Lock Gates"; small view including workboats and people |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
|
"Jan 1918; Lock Gates"; small view of gate installment process including two workboats and houses in background |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
|
"Jan 1918; Lock Gates"; small view of gate installment process including workboat |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
|
"Jan 1918; Lock Gates"; small view of men with houses in background |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
|
"Jan 1918; Lock Gates"; small view of men with houses in background |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
|
"Jan 1918; Lower Gate"; small view of gate during installment process |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
|
"Jan 1918; Lock Gate"; small view of workboat |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
|
"Jan 1918; Lock Gate"; small view of workboat |
16 |
0 |
0 |
Unknown |
Derrick Boat No. 5 |
|
"Derrick Boat No. 5"; small view of workboat, including person and houses in background |
16 |
0 |
0 |
Unknown |
Steamer |
|
"1918 - Steamer "Gregory""; small view of steamship, including people |
16 |
0 |
0 |
Unknown |
Towboat |
|
"Aetna Refining Co's Tow of 8000 Bbls of Crude Oil"; #42A; small view of towboat "Advance" towing several barges |
16 |
0 |
0 |
Unknown |
Barge No. 3 |
|
"Campbells Creek Coal Co. - Barge No. 3 - 26' x 126'-8" x 7'-8""; small view of barge close up |
16 |
0 |
0 |
Unknown |
Barges |
|
"1919 - Campbells Creek, Barges No's 1, 3, 5, & 7"; small view of barge close up, with ship visible in back corner |
16 |
0 |
0 |
Unknown |
Barge No. 1 |
|
"March 1919 - Campbells Creek Coal Co's Barge No. 1"; #3B; small view of barge up close |
16 |
0 |
0 |
Unknown |
Barges |
|
"March 1919 - Campbells Creek Coal Co's Barges No. 1, 3, 5, and 7"; #4B; small view of barges from opposite side of river, with buildings visible in background |
16 |
0 |
0 |
Unknown |
Towboat |
|
"March 1919 - Nitro Plant - Towboat "Winifred""; small view of towboat, including houses and barge |
16 |
0 |
0 |
Unknown |
Barge No. 4 |
|
"March 1919 - Nitro Plant - Barge No. 4"; small view of barge up close, with buildings visible in background |
16 |
0 |
0 |
Unknown |
Barges |
|
"March 1919 - Nitro Plant - Fleet of Barges"; #7B; small view of several barges, including people |
16 |
0 |
0 |
Unknown |
Barges |
|
"March 1919 - Nitro Plant - Fleet of Barges"; #8B; small view of several barges, including people |
16 |
0 |
0 |
Unknown |
Barge No. 8 |
|
"March 1919 - Nitro Plant - Barge No. 8"; #9B; small view of barge up close, including people, and houses in background |
16 |
0 |
0 |
Unknown |
Barge No. 246 |
|
"March 1919 - Iron City Sand Co. Barge No. 246. Bought 1919"; small view of barge up close |
16 |
0 |
0 |
Unknown |
Barge No. 348 |
|
"March 1919 - Iron City Sand Co. Barge No. 348 - Bought 1919"; small view of barge up close |
16 |
0 |
0 |
Unknown |
Barge No. 345 |
|
"March 1919 - Iron City Sand Co. Barge No. 345 - Bought in 1919"; #12B; small view of barge up close, with workboat in background |
16 |
0 |
0 |
Unknown |
Barge No. 347 |
|
"March 1919 - Iron City Sand Co. Barge No. 347 - Bought in 1919 - Typical Rake"; #13B; small view of barge up close, with workboats in background |
16 |
0 |
0 |
Unknown |
Barges |
|
"March 1919 - Iron City Sand Co. - Barge No. (All.9?) [illegible]"; #14B; small view of barges up close with workboat visible in background |
16 |
0 |
0 |
Pomeroy, OH |
Marine Ways |
|
"March 1919 - Pomeroy, Ohio Marine Ways - Crab"; #15B; small view |
16 |
0 |
0 |
Pomeroy, OH |
Marine Ways |
|
"March 1919 - Pomeroy, Ohio Marine Ways - Crab"; #16B; small view |
16 |
0 |
0 |
Pomeroy, OH |
Marine Ways |
|
"March 1919 - Pomeroy, Ohio Marine Ways - Crab"; #17B; small view |
16 |
0 |
0 |
Pomeroy, OH |
Marine Ways |
|
"March 1919 - Pomeroy, Ohio Marine Ways - Crabs"; #18B; small view including workboat and small buildings |
16 |
0 |
0 |
Pomeroy, OH |
Marine Ways |
|
"March 1919 - Pomeroy, Ohio Marine Ways, Ways and Cradles"; #19B; small view including workboats and barges |
16 |
0 |
0 |
Pomeroy, OH |
Marine Ways |
|
"March 1919 - Pomeroy, Ohio Marine Ways, Ways and Cradle"; #20B; small view including workboats and barges |
16 |
0 |
0 |
Unknown |
Ways and Cradle |
|
"March 1919 - Campbell's Creek Coal Co's Ways and Cradle"; #21B; small view including barges and canoe |
16 |
0 |
0 |
Unknown |
Crab |
|
"March 1919 - Campbell's Creek Coal Co's Crab"; #22B; small view |
16 |
0 |
0 |
Kentucky River |
Slide |
|
"March 1919 - Kentucky River - Slide above Worthville, KY"; #23B; small view of river bank |
16 |
0 |
0 |
Kentucky River |
Slide |
|
"March 1919 - Kentucky River - Slide at Cleveland Ky."; small view of river with houses in background |
16 |
0 |
0 |
Kentucky River |
Slide |
|
"March 1919 - Kentucky River - Slide below Eagle Creek"; #25B; small view of river bank |
16 |
0 |
0 |
Kentucky River |
Slide |
|
"March 1919 - Kentucky River - Slide opposite John Calloses"; #26B; small view of river bank |
16 |
0 |
0 |
Kentucky River |
Slide |
|
"March 1919 - Kentucky River - Slide above Worthville Bridge"; #27B; small view of river bank |
16 |
0 |
0 |
Kentucky River |
Slide |
|
"March 1919 - Kentucky River - Slide above Ball's Landing"; small view of river bank |
16 |
0 |
0 |
Kentucky River |
Slide |
|
"March 1919 - Kentucky River - Slide near Moxley"; #29B; small view of river bank |
16 |
0 |
0 |
Kentucky River |
Slide |
|
"March 1919 - Kentucky River - Slide above Moxley"; small view of river bank |
16 |
0 |
0 |
Kentucky River |
Slide |
|
"March 1919 - Kentucky River - Slide 1/4 Mile below Pott Riffle"; #31B; small view of river bank |
16 |
0 |
0 |
Kentucky River |
Slide |
|
"March 1919 - Kentucky River - Slide below Monterey"; #32B; small view of river bank |
16 |
0 |
0 |
Kentucky River |
Slide |
|
"March 1919 - Kentucky River - Slide below Carr's"; small view of river bank |
16 |
0 |
0 |
Kentucky River |
Slide |
|
"March 1919 - Kentucky River - Slide 3/4 miles above Mussel Shoals"; #34B; small view of river bank |
16 |
0 |
0 |
Kentucky River |
Slide |
|
"March 1919 - Kentucky River - Slide above Gratz"; #35B; small view of river bank |
16 |
0 |
0 |
Kentucky River |
Slide |
|
"March 1919 - Kentucky River - Slide - Riddles Landing"; #36B; small view of river bank |
16 |
0 |
0 |
Kentucky River |
Slide |
|
"March 1919 - Kentucky River - Slide 1/2 mile above Lillard's"; #37B; small view of river bank |
16 |
0 |
0 |
Unknown |
Derrickboats 1 & 4 |
|
"1919 - National Contract Co's Derrickboats 1 & 4"; #38B; small view of workboats including men |
16 |
0 |
0 |
Unknown |
Derrickboat #21 |
|
"April 1919 - Bates and Rogers Derrickboat #21"; #41B; small view of workboat up close |
16 |
0 |
0 |
Unknown |
Derrickboats |
|
"1919 - National Contract Co's Derrickboats Nos 1 & 2"; #40B; small view of workboats |
16 |
0 |
0 |
Unknown |
Derrickboat #1 |
|
"1919 - National Contract Co's Derrickboat #1"; #39B; small view of workboat including men |
16 |
0 |
0 |
Unknown |
Derrickboat #22 |
|
"April 1919 - Bates and Rogers Derrickboat #22"; #42B; small view of workboat up close |
16 |
0 |
0 |
Unknown |
Derrickboat No. 21 |
|
"April 1919 - Bates and Rogers Derrickboat No. 21"; #43B; small view of workboat |
16 |
0 |
0 |
Unknown |
Derrickboat No. 22 |
|
"April 1919 - Bates and Rogers - Derrickboat No. 22"; #44B; small view of workboat |
16 |
0 |
0 |
Unknown |
Derrickboat No. 22 |
|
"April 1919 - Bates and Rogers - Derrickboat No. 22"; #45B; small view of workboat up close |
16 |
0 |
0 |
Unknown |
Derrickboat No. 21 |
|
"April 1919 - Bates and Rogers - Derrickboat No. 21"; #46B; small view of workboat up close |
16 |
0 |
0 |
Unknown |
Derrickboat No. 21 |
|
"April 1919 - Bates and Rogers - Derrickboat No. 21"; #47B; small view |
16 |
0 |
0 |
Unknown |
Derrickboat No. 21 |
|
"April 1919 - Bates and Rogers - Derrickboat No. 21"; #48B; small view of workboat |
16 |
0 |
0 |
Frankfort, KY |
Liberty Day |
|
"1919 - Frankfort, KY - Liberty Day - Parade"; #49B; small view of parade passing over a bridge with a ship and buildings in background |
16 |
0 |
0 |
Frankfort, KY |
Liberty Day |
|
"1919 - Frankfort, KY - Baby Tank - "Go-Getter""; #50B; small view of baby tank on river bank with a crowd around it and buildings in corner |
16 |
0 |
0 |
Frankfort, KY |
Liberty Day |
|
"1919 - Frankfort, KY - Liberty Day - Baby Tank "Go-Getter""; #51B; small view of crowd around tank with cars visible on street |
16 |
0 |
0 |
Frankfort, KY |
Liberty Day |
|
"1919 - Frankfort, KY - Liberty Day - Procession on Bridge"; #52B; small view of parade passing over a bridge with a ship and buildings visible in background |
16 |
0 |
0 |
Frankfort, KY |
Liberty Day |
|
"1919 - Frankfort, KY - Liberty Day - Tank"; #53B; small view of crowd on river bank, with boat and raft in river |
16 |
0 |
0 |
Frankfort, KY |
Liberty Day |
|
"1919 - Frankfort, KY - Liberty Day - Procession on Bridge"; #54B; small view of parade passing over a bridge with ship and buildings visible in background |
16 |
0 |
0 |
Frankfort, KY |
Liberty Day |
|
"1919 - Frankfort, KY - Liberty Day - Tank"; #55B; small view of tank "Go-Getter" on river bank with crowd near it, and boat in background |
16 |
0 |
0 |
Frankfort, KY |
Liberty Day |
|
"1919 - Frankfort, KY - Liberty Day - Tank"; #56B; small view of tank "Go-Getter" on river bank crowd around it |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
|
"1919 - Kentucky River - Lock No. 14 - Part of Panoramic View - Dam"; small view of dam |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
|
"1919 - Kentucky River - Lock No. 14 - Part of Panoramic View - Grounds"; small view of lock area, including houses, lock, dam and river bank |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
|
"1919 - Kentucky River - Lock No. 14 - L and N Bridge and Lower Guide Wall"; #59B; small view |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
|
"1919 - Kentucky River - Lock No. 14 - Dam - Two 10" Stop Logs on Crest"; #60B; small view on dam, looking upstream |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
|
"1919 Lock No. 14 - Concrete Blocks on Wall"; small view of lock with man on guide wall and bridge in background |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
|
"1919 Lock No. 14 - Concreting footing course on Lower Guard Wall Crib"; small view of lock and dam, including workboat, barge and people |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
|
"1919 Kentucky River - Lock No. 14 - Rock Fault and Lower Guard Wall under construction"; #62B; small view |
16 |
13 |
0 |
Kentucky River |
Lock No. 13 |
|
"1919 Kentucky River - Lock No. 13 - Dam and Abutment - Part of Panorama View"; small view from one side of river with house on other side |
16 |
13 |
0 |
Kentucky River |
Lock No. 13 |
|
"1919 - Kentucky River - Lock No. 13 - Abutment - Part of Panorama View"; #65B; small view of abutment from one side of river |
16 |
13 |
0 |
Kentucky River |
Lock No. 13 |
|
"1919 - Kentucky River - Lock No. 13 - Lock Side - Part of Panorama View"; small view including person and boat |
16 |
13 |
0 |
Kentucky River |
Lock No. 13 |
|
"1919 - Kentucky River - Lock No. 13 - Lock Side - Part of Panorama View"; #67; small view with workboat in background |
16 |
13 |
0 |
Kentucky River |
Lock No. 13 |
|
"1919 - Kentucky River - Lock No. 13 - Lock Side - Part of Panorama View"; small view from one side of river, showing lock, dam, houses and workboat |
16 |
13 |
0 |
Kentucky River |
Lock No. 13 |
|
"1919 - Kentucky River - Lock No. 13 - Lock Side - Part of Panorama View"; #69B; small view from one side of river, including workboats and houses |
16 |
13 |
0 |
Kentucky River |
Lock No. 13 |
|
"1919 - Kentucky River - Lock No. 13 - Dam - Crest partly down"; #70B; small view of dam from one side of river |
16 |
13 |
0 |
Kentucky River |
Lock No. 13 |
|
"1919 - Kentucky River - Lock No. 13 - Dam - Crest partly down"; #71B; small view of dam from one side of river, including house on opposite site |
16 |
12 |
0 |
Kentucky River |
Lock No. 12 |
|
"1919 - Kentucky River - Lock No. 12 - General View"; small view of lock and dam, with ship and houses in background |
16 |
12 |
0 |
Kentucky River |
Lock No. 12 |
|
"1919 - Kentucky River - Lock No. 12 - Damage to Lower Gate By Str "Onward""; small view of lock gates |
16 |
12 |
0 |
Kentucky River |
Lock No. 12 |
|
"1919 - Kentucky River - Lock No. 12 - Damage to Lower Gate By Str "Onward""; small view of lock gates |
16 |
12 |
0 |
Kentucky River |
Lock No. 12 |
|
"1919 - Kentucky River - Lock No. 12 - Damage to Lower Gate By Str "Onward""; #75B; small view of lock gates up close |
16 |
12 |
0 |
Kentucky River |
Lock No. 12 |
|
"1919 - Kentucky River - Lock No. 12 - Damage to Lower Gate by Str. "Onward""; #76B; small view of lock gates up close |
16 |
10 |
0 |
Kentucky River |
Lock No. 10 |
|
"1919 - Kentucky River - Lock No. 10 - Auxiliary Abutment Movement"; #77B; small view of abutment with markings showing its movement |
16 |
8 |
0 |
Kentucky River |
Dam No. 8 |
|
"1919 - Kentucky River - Dam No. 8 - Flow of Water over Dam"; small view with water flowing over it |
16 |
8 |
0 |
Kentucky River |
Dam No. 8 |
|
"1919 - Kentucky River - Dam No. 8 - Flow of Water over Dam"; small view with water flowing over it |
16 |
0 |
0 |
Yellow Rock Tunnel |
Wreck |
|
"1919 - Yellow Rock Tunnel - Wreck of 6 Oil Tank Cars"; #80B; small view of tank cars that have fallen off rail tracks, with workers on site |
16 |
0 |
0 |
Ford, KY |
Misc |
|
"1919 - Ford, Ky. - General View"; view of town including houses |
16 |
0 |
0 |
Ravenna, KY |
Railroad Yard |
|
"1919 - Ravenna, Ky. - L. and N. R.R. Yard"; small view of rail yard including trains, rail lines, and buildings |
16 |
0 |
0 |
Kentucky River |
Pool No. 5 |
|
"1919 - Kentucky River - Pool No. 5 - Q and C Bridge at Tyrone, Ky."; #83B; small view of bridge |
16 |
0 |
0 |
Kentucky River |
Pool No. 9 |
|
"1919 - Kentucky River - Pool No. 9 - Tower"; small view of canyon along river bank |
16 |
0 |
0 |
Kentucky River |
Pool No. 6 |
|
"1919 - Kentucky River - Pool No. 6 - Candle Stick"; #85B; view of canyon wall |
16 |
0 |
0 |
Kentucky River |
Pool No. 6 |
|
"1919 - Kentucky River - Pool No. 6 - Devils Pulpit"; #86B; view of canyon wall |
16 |
0 |
0 |
Kentucky River |
Pool No. 8 |
|
"1919 - Kentucky River - Pool No. 8 - Cliffs near Marble Creek"; #87B; small view of canyon cliffs |
16 |
0 |
0 |
Kentucky River |
Pool No. 8 |
|
"1919 - Kentucky River - Pool No. 8 - Cliffs below Lock No. 9"; #88B; small view of canyon and river |
16 |
0 |
0 |
Kentucky River |
Pool No. 8 |
|
"1919 - Kentucky River - Pool No. 8 - Cliffs below Lock No. 9"; #89B; small view of canyon wall |
16 |
0 |
0 |
Kentucky River |
Pool No. 1 |
|
"1919 - Kentucky River - Pool No. 1 - Coal Yard at Moxley"; small view of hill with houses at the top |
16 |
0 |
0 |
Kentucky River |
Pool No. 14 |
|
"1919 - Kentucky River - Pool No. 14 - Beattyville Coal Co's River Tipple"; small view including barge |
16 |
0 |
0 |
Kentucky River |
Pool No. 2 |
|
"1919 - Kentucky River - Pool No. 2 - Study in Reflection"; #92B; view of river |
16 |
0 |
0 |
Kanawha River |
Misc |
|
"1919 - Pt. Pleasant, W. Va. - View up Kanawha River"; small view of river including workboats, bridge, and buildings |
16 |
0 |
0 |
Pt. Pleasant, WV |
Monuments |
|
"1919 - Pt. Pleasant, W. Va. - Battle of 1774 Monuments"; small view of buildings and obelisk |
16 |
4 |
0 |
Kentucky River |
Lock No. 4 |
|
"1919 - Kentucky River - Lock No. 4 - Mounting Spud Wells on B.S. Maneuverboat No. 1"; small view including workboat, barge, workers and houses |
16 |
4 |
0 |
Kentucky River |
Lock No. 4 |
|
"1919 - Kentucky River - Lock No. 4 - Mounting Spud Wells on B.S. Maneuverboat No. 1"; small view including workboat, barge, workers, and houses |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
|
"1919 - Kentucky River - Lock No. 14 - "Whirley" and Sand Pumps"; small view of men at work with bridge and water tower in background |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
|
"1919 - Kentucky River - Lock No. 14 - "Whirley" and Sand Pumps"; small vew of men at work on barges, with house in background |
16 |
0 |
0 |
Kentucky River |
Pool No. 1 |
|
"1919 - Kentucky River - Pool No. 1 - Derrick of the "Mingo""; #99B; small view of workboat with a person on it |
16 |
0 |
0 |
Kentucky River |
Pool No. 1 |
|
"1919 - Kentucky River - Pool No. 1 - Snagboats, "Mingo" and "Iroquois""; small view of workboats |
16 |
4 |
0 |
Kentucky River |
Lock No. 4 |
|
"1919 - Kentucky River - Lock No. 4 - Osgood, R.R. Crane"; #101B; small view of men on and near a crane |
16 |
12 |
0 |
Kentucky River |
Lock No. 12 |
|
"1919 - Kentucky River - Lock No. 12 - Bush, Rogers and Lunsford"; small view of men and children posing |
16 |
0 |
0 |
Beattyville, KY |
Loading Tipple |
|
"The Beattyville Ky Co's River Coal Loading Tipple"; #8A; small faded view including barge |
16 |
8 |
0 |
Kentucky River |
Misc |
|
Small picture of a man holding a stick to the ground; Ky. R. L8/24 3 |
16 |
4 |
0 |
Kentucky River |
Lock No. 4 |
|
"1919 - Group of Workmen"; small view of workers in front of a building |
16 |
4 |
0 |
Kentucky River |
Lock No. 4 |
|
"1919 - Group of Workmen"; #104B; small view of workers in front of a building |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
|
"1919 - Group of Workmen; Ernest Bentley, Saunders King, Speed C. Cole, M. B. Tipton, W. A. Davis, J. E. Branson"; small view of workers and two children with workers' names printed on photo |
16 |
0 |
0 |
Kentucky River |
Pool No. 1 |
|
"1919 - Capt Wright and 24 lb Spoonbill"; small view of man holding a large fish |
16 |
4 |
0 |
Kentucky River |
Lock No. 4 |
|
"1919 - Launch "Pearl""; #107B; small view of a boat |
16 |
4 |
0 |
Kentucky River |
Lock No. 4 |
|
"1919 - Kentucky's damaged smoke stacks"; #108B; small view of ship "Kentucky" |
16 |
0 |
0 |
Kentucky River |
Pool No. 12 |
|
"July 1919 - "Nelson C" and L&N Train"; small view of river, including workboat and train |
16 |
13 |
0 |
Kentucky River |
Lock No. 13 |
|
"July 1919 - "Gregory" in upper entrance"; #110B; small view of river, including ship "Gregory" and houses on shore |
16 |
10 |
0 |
Kentucky River |
Lock No. 13 |
|
"July 1919 - "Gregory" and scow of rock"; #111B; small view of river, including workboat "Gregory" and barge |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
8/5/1919 |
"Lower Guard Wall; Completed except coping. Built of hollow reinforced concrete blocks"; No. 1; small view of guard wall |
16 |
13 |
0 |
Kentucky River |
Lock No. 13 |
8/5/1919 |
"Lower Guard Wall; Completed except coping. Built of hollow reinforced concrete blocks"; No. 2; small view of guard wall, including people |
16 |
12 |
0 |
Kentucky River |
Lock No. 12 |
8/5/1919 |
"Foundation crib, and piles sunk and filled with stone"; No. 3; small view of dam |
16 |
12 |
0 |
Kentucky River |
Lock No. 12 |
8/5/1919 |
"Mounting forms, and plant for making reinforced concrete wall blocks"; No. 4; small view of site during construction, including barge, people, and houses in background |
16 |
12 |
0 |
Kentucky River |
Lock No. 12 |
8/5/1919 |
"Forms for hollow reinforced concrete wall blocks, showing formes ready to pour and also inside forms and reinforcing"; No. 5; small view of site during construction, including barge and workboat in background |
16 |
12 |
0 |
Kentucky River |
Lock No. 12 |
8/5/1919 |
"Forms for hollow reinforced concrete wall blocks, showing formes ready to pour and also inside forms and reinforcing"; No. 6; small view of site during construction, including people and materials |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
8/5/1919 |
"Derrickboat No. 4, loading concrete wall blocks on barge for Wall at Lock No. 13"; No. 7; small view of workboat, with house visible in background |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
6/1/1919 |
"Concrete Wall block 16 hours after filling with water"; No. 8; small view of wall block up close |
16 |
0 |
0 |
Kentucky River |
Pool No. 13 |
8/6/1919 |
"Stone Quarry at Yellow Rock"; No. 9; small view |
16 |
0 |
0 |
Frankfort, KY |
Pool No. 4 |
|
"1919 - Str. "Advance" - down, with tow of 2 barges, carrying 7,000 barrels of crude oil, and 1 flat with 100 tons of coal"; No. 10; small view of two workboats in a river, with houses visible on shore |
16 |
0 |
0 |
Valley View, KY |
Pool No. 9 |
|
"1919 - Small Towboat "Dixie," with Tow of coal"; No. 11; small view of towboat and barges, including bridge and houses |
16 |
0 |
0 |
Kentucky River |
Pool No. 6 |
|
"1919 - Str, "Martha" with tow of Fluorspar"; No. 12; small view of towboat and barge, including people |
16 |
0 |
0 |
Irvine, KY |
Pool No. 11 |
|
"1919 - Gasoline Towboat "Nelson C" with Tow of log rafts"; No. 13; small view of towboat and log rafts, including people and houses |
16 |
0 |
0 |
Kentucky River |
Pool No. 5 |
|
"1919 - Typical slide of the banks; hundreds of them occurring annually"; No. 14; small view of river bank |
16 |
0 |
0 |
Kentucky River |
Pool No. 8 |
|
"July 1919 - Towboat, "Advance," with 7,000 bbls of crude oil"; No. 15; small view of towboat and barges, including people |
16 |
12 |
0 |
Kentucky River |
Dam No. 12 |
|
"July 1919 - Movable Crest, partially raised"; No. 16; small view of dam |
16 |
0 |
0 |
Kentucky River |
Pool No. 9 |
|
"July 1919 - "Williams" Quarry. Derrickboat No. 5, and Towboat "Gregory""; No. 17; small view of workboats |
16 |
11 |
0 |
Kentucky River |
Lock No. 11 |
8/6/1919 |
"Crib foundation for Lower Guard Wall; sunk, piles driven and nearly filled with stone"; 18; small view |
16 |
10 |
0 |
Kentucky River |
Lock No. 10 |
8/6/1919 |
"Dredge "Carrollton" excavating foundation for lower Guard Wall. 6,400 Cu Yds, removed"; 19; small view, including workboats |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
8/8/1919 |
"Oak sheathing on downstream face of lower gate completed. Work done by diver in greater part."; 20; small view of gates |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
8/8/1919 |
"Lower Guard Wall, 230 feet long, completed"; 21; small view |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
8/8/1919 |
"Lower Guard Wall, Rear view - Completed"; 22; small view, including dog |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
8/8/1919 |
"Repairs made at lower end of Abutment Crib; also showing flow of water over dam and apron"; 23; small view from one side of river |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
8/8/1919 |
"Repairing Upper Guard Crib, damaged by ice, Completed Aug 11, 1919"; 24; small view including people |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
8/8/1919 |
"Repairing Upper Guard Crib, damaged by ice, Completed Aug 11, 1919"; 25; small view including people |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
8/8/1919 |
"Derrickboat No. 3, lowering Concrete Mixer Tower, to pass under bridges"; 26; small view, including people and workboat |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
8/5/1919 |
"Lower Guard Wall completed, except the coping"; 27; small view, including guard wall and dam |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
8/5/1919 |
"Lower Guard Wall completed except the coping. Same as No. 27 with different exposure"; 28; small view including guard wall and dam |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
8/5/1919 |
"Lower Guard Wall completed except the coping. Different view from Nos 27 and 28"; 29; small view |
16 |
13 |
0 |
Kentucky River |
Lock No. 13 |
8/5/1919 |
"Lower Guard Wall completed except coping"; 30; small view, including guard wall, workboat and houses |
16 |
13 |
0 |
Kentucky River |
Lock No. 13 |
8/5/1919 |
"Lower Guard Wall completed except coping. Rear View"; 31; small view, including guard wall and workboat |
16 |
12 |
0 |
Kentucky River |
Lock No. 12 |
8/6/1919 |
"Lower Guard Wall, foundation crib completed, sunk and filled"; 32; small view, including house in background |
16 |
0 |
0 |
Kentucky River |
Pool No. 4 |
|
"1919 - Str. "Advance" at Frankfort towing 7,000 bbls. Crude Oil"; 33; small view of towboat and barges, with boats and houses in background |
16 |
0 |
0 |
Kentucky River |
Pool No. 4 |
|
"1919 - Str. "Advance" at Frankfort Towing 7,000 bbls. Crude Oil; Different view from No. 33"; 34; small view including towboat, barges, boat and part of a bridge |
16 |
0 |
0 |
Kentucky River |
Pool No. 4 |
|
"1919 - Str. "Advance" at Frankfort Towing 7,000 bbls. Crude Oil; Different view from Nos 33 and 34"; 35; small view including towboat, barges, boats and houses |
16 |
0 |
0 |
Kentucky River |
Pool No. 12 |
|
"1919 - Pumping a barge of sand at Ross Creek, U.S. Towboat "Gregory""; 36; small view including men at work |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
|
"1919 - Derrickboat No. 4 loading wall blocks - 8 Ton block"; 37; small view, including workboat and person |
16 |
0 |
0 |
Kentucky River |
Pool No. 10 |
8/6/1919 |
"Mouth of Red River"; 38; small view of river |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
8/8/1919 |
"Concrete Mixer and Derrick Boat No. 3; Preparing to lower the tower"; 39; small view including workboat |
16 |
10 |
0 |
Kentucky River |
Lock No. 10 |
8/6/1919 |
"Dredge Carrollton and Towboat "Comet No. 2" dredging lower Guard Wall foundation"; 40; small view including workboats and guard wall |
16 |
11 |
0 |
Kentucky River |
Lock No. 11 |
8/6/1919 |
"Foundation crib for Lower Guard Wall, sunk and partially filled with stone"; 41; small view |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
8/7/1919 |
"Lower Guard Wall, completed"; 42; small view |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
8/8/1919 |
"Dwelling and Office"; 43; small view of buildings |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
8/8/1919 |
"Repairing Upper Guard Crib, damaged by ice"; 44; small view including person |
16 |
0 |
0 |
Worthville, KY |
Train |
8/8/1919 |
"L&N Locomotive. (Taken to finish roll of films)"; 45; small view of train |
16 |
0 |
0 |
Lexington, KY |
Concrete Tower |
9/18/1919 |
"Concrete Tower at Phoenix Garage. Snapshot at late Twilight"; 46; small view |
16 |
0 |
0 |
Frankfort, KY |
Bridge |
8/14/1919 |
"L&N R.R. Bridge"; small view of bridge, with some houses visible |
16 |
4 |
0 |
Kentucky River |
Lock No. 4 |
8/14/1919 |
"Hemp Mill at Dam No. 4"; 48; small view of mill and water tower from dam site |
16 |
4 |
0 |
Kentucky River |
Lock No. 4 |
8/14/1919 |
"Power House, Machine Shop, and Blacksmith Shop"; 49; small view of buildings |
16 |
4 |
0 |
Kentucky River |
Lock No. 4 |
8/14/1919 |
"Power House, Machine Shop, and Blacksmith Shop. Same as No. 29, with different exposure"; 50; small view of buildings |
16 |
4 |
0 |
Kentucky River |
Lock No. 4 |
8/14/1919 |
"Saw Mill, Power House, Machine Shop, Blacksmith Shop, and Storehouse"; 51; small view of buildings |
16 |
4 |
0 |
Kentucky River |
Lock No. 4 |
8/14/1919 |
"Saw Mill, Power House, Machine Shop, Blacksmith Shop, and Storehouse. Same as No. 51 - with different exposure"; 52; small view of buildings |
16 |
4 |
0 |
Kentucky River |
Lock No. 4 |
8/17/1919 |
"Straightening D/B #5 Clamshell - heating with torches"; 53; small view including men at work |
16 |
4 |
0 |
Kentucky River |
Lock No. 4 |
8/17/1919 |
"Derrickboat No. 5, lifting "Monroe" to lock wall for repairs"; 54; small view including workboat lifting boat, and people |
16 |
4 |
0 |
Kentucky River |
Lock No. 4 |
8/17/1919 |
"Launch "Monroe" on lock wall for repair"; 55; small view of boat while being lifted, with people and house in background |
16 |
4 |
0 |
Kentucky River |
Lock No. 4 |
8/17/1919 |
"Bottom and Stern of the launch "Monroe'"; No. 56; small view of boat being lifted, with men aiding |
16 |
4 |
0 |
Kentucky River |
Lock No. 4 |
8/17/1919 |
"Side view of the launch "Monroe""; No. 57; small view of boat with mill in background |
16 |
4 |
0 |
Kentucky River |
Lock No. 4 |
8/17/1919 |
"Snagboat "Kentucky" and fleet ready to start for Lock No. 6"; No. 58; small view of ship and workboat |
16 |
11 |
0 |
Kentucky River |
Lock No. 11 |
8/20/1919 |
"Dam, Movable Crest, and Abutment"; 59; small view |
16 |
12 |
0 |
Kentucky River |
Lock No. 12 |
8/20/1919 |
"Big Sandy, Maneuver Boat No. 1"; 60; small view of workboat |
16 |
0 |
0 |
Kentucky River |
Pool No. 11 at Irvine |
8/20/1919 |
"Mowbray and Robinson Rafts just below bend at Irvine"; 61; small view |
16 |
0 |
0 |
Kentucky River |
Pool No. 11 at Irvine, KY |
8/20/1919 |
"L&N R.R. Bridge; Highway Bridge in distance, at Irvine, Ky"; 62; small view of bridges from river |
16 |
0 |
0 |
Kentucky River |
Pool No. 11 at Irvine, KY |
8/20/1919 |
"Estill County Highway Bridge"; 63; small view of bridge |
16 |
12 |
0 |
Kentucky River |
Lock No. 12 |
8/20/1919 |
"Interior Form for building Wall Blocks"; 64; small view of materials up close |
16 |
0 |
0 |
Kentucky River |
Bridge |
8/27/1919 |
"Napfor, Ky; Water and Pier of Lincoln Coal Co's Bridge"; 65; very small view |
16 |
0 |
0 |
Kentucky River |
Bridge and Coal Tipple |
8/27/1919 |
"Napfor, Ky; Lincoln Coal Co's Bridge, and Coal Tipple"; 66; very small view including people |
16 |
0 |
0 |
Kentucky River |
Bridge and Coal Tipple |
8/27/1919 |
"Napfor, Ky; Lincoln Coal Co's Bridge, and Coal Tipple"; 67; very small view |
16 |
0 |
0 |
Kentucky River |
Bridge and Coal Tipple |
8/27/1919 |
"Napfor, Ky; Lincoln Coal Co's Bridge, and Coal Tipple"; 68; very small view including people |
16 |
0 |
0 |
Kentucky River |
Crossing |
|
"Lincoln Coal Co's Crossing"; 69; very small view |
16 |
0 |
0 |
Kentucky River |
Pool No. 10 |
8/21/1919 |
"Hillside two miles above Red River"; 70; small view of river bank |
16 |
12 |
0 |
Kentucky River |
Lock No. 12 |
8/27/1919 |
"Putting in the Head-bay, Dam"; 71; small view of men at work on dam |
16 |
12 |
0 |
Kentucky River |
Lock No. 12 |
8/27/1919 |
"Head-bay Dam in place"; 72; small view of completed head-bay up close |
16 |
12 |
0 |
Kentucky River |
Lock No. 12 |
8/27/1919 |
"Corrosion of Upper Gate below pool"; 73; small view of gate up close |
16 |
0 |
0 |
Kentucky River |
Barge and Towboat |
9/1/1919 |
"Frankfort, Ky; Excursion Barge, "Summer Girl" and Towboat "Hub""; 74; small view of ship and boat, with building visible in back corner |
16 |
0 |
0 |
Kentucky River |
Boats |
8/29/1919 |
"Frankfort, Ky; Kentucky and Tow passing the Office"; 75; small view of ships and boats in the river with building visible in corner of photo |
16 |
6 |
0 |
Kentucky River |
Lock No. 6 |
9/8/1919 |
"Upper Triangular Guard Pier, rebuilt in Concrete"; 76; small view |
16 |
6 |
0 |
Kentucky River |
Lock No. 6 |
9/8/1919 |
"View of the Lock"; 77; small view |
16 |
6 |
0 |
Kentucky River |
Dam No. 6 |
9/8/1919 |
"Dam, Apron and Abutment"; 78; small view of dam from one side of river |
16 |
6 |
0 |
Kentucky River |
Dam No. 6 |
9/8/1919 |
"Dam, Apron and Abutment"; 79; small view of dam from the front |
16 |
8 |
0 |
Kentucky River |
Dam No. 8 |
9/9/1919 |
"Preparing to Concrete the upper slope"; No. 80; small view including people |
16 |
8 |
0 |
Kentucky River |
Dam No. 8 |
9/9/1919 |
"Preparing to Concrete the upper slope; Same as No. 80, with different exposure"; No. 81; small view including people |
16 |
8 |
0 |
Kentucky River |
Dam No. 8 |
9/17/1919 |
"Surfacing upper slope with concrete"; 82; small view including people |
16 |
8 |
0 |
Kentucky River |
Lock No. 8 |
9/17/1919 |
"A Lock House"; 83; small view of lock house |
16 |
9 |
0 |
Kentucky River |
Lock No. 9 |
9/23/1919 |
"Constructing Lower Guide Wall"; No. 84; small view including workboats, and people |
16 |
9 |
0 |
Kentucky River |
Lock No. 9 |
9/23/1919 |
"Constructing Lower Guide Wall"; No. 85; small view including workboat, barges and people, with house visible in background |
16 |
9 |
0 |
Kentucky River |
Lock No. 9 |
9/23/1919 |
"The Valley View, L&N R.R. Bridge"; No. 86; small view of bridge from lock |
16 |
4 |
0 |
Kentucky River |
Lock No. 4 |
9/25/1919 |
"Launch "Monroe""; No. 87; small view of boat |
16 |
0 |
0 |
Kentucky River |
Pool No. 3 |
9/25/1919 |
"Mouth of Elkhorn Creek"; No. 88; small scenic view, including buildings in distance |
16 |
0 |
0 |
Kentucky River |
Pool No. 3 |
9/25/1919 |
"Head of Slack Water in Elkhorn Creek"; No. 89; small view of creek, including three men |
16 |
0 |
0 |
Kentucky River |
Pool No. 3 |
9/25/1919 |
"Head of Slack Water in Elkhorn Creek"; No. 90; small view of creek, including three men |
16 |
3 |
0 |
Kentucky River |
Lock No. 3 |
9/25/1919 |
"Up Stream face of Lower Gate"; No. 91; small view of gates with three men on them |
16 |
3 |
0 |
Kentucky River |
Lock No. 3 |
9/25/1919 |
"Bonnet on Old Lower Gate"; No. 92; small view |
16 |
3 |
0 |
Kentucky River |
Lock No. 3 |
9/25/1919 |
"Up-stream face of Upper Gate"; small view of gates with houses visible in background |
16 |
5 |
0 |
Kentucky River |
Lock No. 5 |
9/26/1919 |
"Spill over the Dam"; small view of dam from one side, with houses visible in background |
16 |
5 |
0 |
Kentucky River |
Lock No. 5 |
9/26/1919 |
"Spill over the Dam"; small view of dam from one side, with men in foreground, and buildings in the background |
16 |
5 |
0 |
Kentucky River |
Lock No. 5 |
9/26/1919 |
"Land Leaf of Lower Gate"; small view, including people |
16 |
5 |
0 |
Kentucky River |
Lock No. 5 |
9/26/1919 |
"Top of Lower Gate"; small view |
16 |
5 |
0 |
Kentucky River |
Lock No. 5 |
9/26/1919 |
"Land Leaf of Upper Gate, 3/8" opening at Top of valves"; No. 98; small view |
16 |
0 |
0 |
Frankfort, KY |
Pool No. 4 |
9/26/1919 |
"Blanton's Wharf"; view of Frankfort from river, including barges, boats and buildings |
16 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/2/1919 |
"Plant at Lower Guide Wall where Ernest Bentley was killed"; small view, including workboat, barges, machinery, and house |
16 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/2/1919 |
"The Whirley and broken boom that killed Ernest Bentley who was standing on the Crib, where Mr. Vaughn appears"; small view including workboat, barge, people, and house |
16 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/2/1919 |
"Same as No. 101, except is a closer view"; small view of workboat, materials, and barges with houses in background |
16 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/2/1919 |
"Near view of the broken boom-tip"; No. 103; small view including man |
16 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/2/1919 |
"The break in the "Whirley" boom-tip… that caused the death of Ernest Bentley" (more description included); No. 104; small view close up |
16 |
8 |
0 |
Kentucky River |
Dam No. 8 |
9/26/1919 |
"Removing forms from the Crest"; small view, including two workers |
16 |
8 |
0 |
Kentucky River |
Dam No. 8 |
9/26/1919 |
"Crest completed. Abutment End."; No. 106; small view up close |
16 |
8 |
0 |
Kentucky River |
Dam No. 8 |
9/26/1919 |
"Crest completed. Abutment Side"; No. 107; small view up close |
16 |
8 |
0 |
Kentucky River |
Dam No. 8 |
9/26/1919 |
"Crest completed. Lock End"; small view up close |
16 |
8 |
0 |
Kentucky River |
Dam No. 8 |
9/26/1919 |
"Crest completed. Lock End"; No. 109; small view up close |
16 |
8 |
0 |
Kentucky River |
Dam No. 8 |
9/26/1919 |
"Crest completed. Lock End"; No. 110; small view up close |
16 |
3 |
0 |
Kentucky River |
Dam No. 3 |
10/11/1919 |
"Raising the Crest, 43% completed. Snap Shot in the rain"; small view including workboat |
16 |
3 |
0 |
Kentucky River |
Dam No. 3 |
10/11/1919 |
"Raising the Crest, 43% completed. Snapshot in light rain"; small view including person |
16 |
12 |
0 |
Kentucky River |
Dam No. 12 |
10/14/1919 |
"Movable Crest, Submerged; Snapshot in light rain"; small view of dam |
16 |
12 |
0 |
Kentucky River |
Dam No. 12 |
10/14/1919 |
"Movable Crest, Submerged; Bulb expos, in light rain"; No. 114; small view of dam |
16 |
12 |
0 |
Kentucky River |
Dam No. 12 |
10/14/1919 |
"Movable Crest Submerged. Snap in rain"; No. 115; small view of dam |
16 |
12 |
0 |
Kentucky River |
Dam No. 12 |
10/14/1919 |
"Movable Crest Submerged, close up, end view. Snap in rain"; small view of dam from one side |
16 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/2/1919 |
"The broken "Whirley" boom that caused the death of Ernest Bentley"; No. 117; small view up close |
16 |
9 |
0 |
Kentucky River |
Dam No. 12 |
10/14/1919 |
"Spill over the Dam"; No. 118; small view of dam |
16 |
12 |
0 |
Kentucky River |
Lock No. 12 |
10/7/1919 |
"View up the River"; No. 119; small view |
16 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/10/1919 |
"The old Chicago cube mixer, re-built"; No. 120; small view including men |
16 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/10/1919 |
"Lower Guide Wall foundation crib completed"; small view including barges and house |
16 |
12 |
0 |
Kentucky River |
Lock No. 12 |
10/21/1919 |
"Damage to Movable Crest - Lock Side"; No. 122; small view of dam |
16 |
12 |
0 |
Kentucky River |
Lock No. 12 |
10/21/1919 |
"Damage to Movable Crest - Abutment Side"; No. 123; small view of dam |
16 |
12 |
0 |
Kentucky River |
Dam No. 12 |
10/21/1919 |
"Damage to Movable Crest - End View"; No. 124; small view of dam |
16 |
0 |
0 |
Unknown |
Derrickboat No. 2 |
10/22/1919 |
"Photograph of a photograph; Showing Derrickboat No. 2, of the Louisville District"; No. 125 |
16 |
12 |
0 |
Kentucky River |
Dam No. 12 |
10/30/1919 |
"Crest repaired, raised, and pool 1/3 full"; No. 126; small view of dam |
16 |
0 |
0 |
Kentucky River |
Pool No. 10 |
11/18/1919 |
""Comet No. 2" towing Carrollton, D.B. No. 1, and barge from Lock No. 11 to Nolan's Creek"; No. 127; small view of boats in river |
16 |
0 |
0 |
Kentucky River |
Pool No. 10 |
11/18/1919 |
"Slip 3 miles below Red River"; No. 128; small view of river bank |
16 |
10 |
0 |
Kentucky River |
Lock No. 10 |
11/18/1919 |
"The Lower Gate"; No. 129; small view of gate up close |
16 |
0 |
0 |
Ford, KY |
Pool No. 10 |
11/18/1919 |
"L&N R.R. Bridge at Ford, Ky"; No. 130; small view of a bridge with a train having just passed over it |
16 |
11 |
0 |
Kentucky River |
Lock No. 11 |
11/25/1919 |
"Laying concrete footing on lower Guard Crib"; No. 131; small view, including workboats, and people |
16 |
0 |
0 |
Frankfort, KY |
Inaugural Parade |
12/9/1919 |
"Gov. Morrow's Inaugural Parade - Colors of 1st Division passing"; No. 132; small view of street with procession going through it; includes flags, people and buildings |
16 |
0 |
0 |
Frankfort, KY |
Inaugural Parade |
12/9/1919 |
"Gov. Morrow's Inaugural Parade - Henderson "Clean sweep" Brigade passing"; No. 133; small view of street with procession on it, including flags, people, and buildings |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
1/17/1920 |
"Dismounted leaf (land) of Lower Gate"; No. 134; small view of leaf with people on it, and houses in background |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
1/17/1920 |
"Dismounted land leaf of Lower Gate - Diver is down"; No. 135; small view of leaf with people around it, and houses in background |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
1/17/1920 |
"Dismounted land leaf of Lower Gate. Derrick Boat No. 3"; No. 136; small view, including workboat, ship and person |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
1/17/1920 |
"Scour of River Wall at Upper Gate"; No. 137; small view |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
11/2/1919 |
"Rise of Nov 2nd 1919"; very small faded view of river |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
11/2/1919 |
"Rise of Nov 2nd 1919"; very small faded view of river, including people |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
11/2/1919 |
"Rise of Nov 2nd 1919"; very small faded view of river |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
11/2/1919 |
"Rise of Nov 2nd 1919"; very small faded view of river, including people |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
1/17/1920 |
"Lever used to mount the Gate leaf (land)... Steel shoe" (more description included); No. 138; small view including workboats and men |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
1/17/1920 |
"Land leaf of Lower Gate, remounted"; No. 139; small view of lower gate, including men, with house in background |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
1/17/1920 |
"Condition of Upper Guard Crib after flood"; small view up close |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
1/18/1920 |
"Diver Philip Bornwasser and helper John Jones"; small view of two men, one in diving gear |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
1/19/1920 |
"Condition of Triangular Guard Pier, after flood"; No. 142; small view, with houses visible in background |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
1/19/1920 |
"Condition of Triangular Guard Pier, after flood"; No. 143; small view, with houses visible in background |
16 |
1 |
0 |
Kentucky River |
Lock No. 1 |
1/19/1920 |
"Surface of River Wall scoured by flood"; No. 144; small view with ship in background |
16 |
0 |
0 |
Kentucky River |
Fleet |
1/25/1920 |
"Frankfort, Ky. Kentucky River - Fleet of the Elevator Coal Co. - River at flood stage"; small view of boats in the river |
16 |
0 |
0 |
Kentucky River |
Buildings |
1/25/1920 |
"Frankfort, Ky.; Post Office and U.S. Engineer Office - top floor - River at flood stage"; No. 146; small view of buildings and church |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
1/28/1920 |
"Panoramic view through 180 degrees showing washout of Jan'y 23, 1920"; No's 139-A, 140-A, 141-A, 142-A, and 143-A; panoramic view out of five connected photos, including bridge, esplanade, scattered materials, people, water tower and houses |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
1/29/1920 |
"Washout of Jan'y 23, 1920"; small view including bridge, people, esplanade, scattered materials, and water tower |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
1/29/1920 |
"Washout of Jan'y 23, 1920"; small view of scattered materials |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
1/29/1920 |
"Washout of Jan'y 23, 1920"; No. 146; small view including people, houses, and scattered materials |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
1/29/1920 |
"Washout of Jan'y 23, 1920"; No. 147; small view including people, houses, and scattered materials |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
1/29/1920 |
"Washout of Jan'y 23, 1920"; No. 147; small view including people and scattered materials |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
1/29/1920 |
"Washout of Jan'y 23, 1920"; No. 149; small view from one side of river, including lock, dam, people and houses |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
1/29/1920 |
"View from the Abutment side showing the Washout of Jan'y 23, 1920"; No. 150; small view, including people, scattered materials, and houses |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
1/29/1920 |
"View from the L&N R.R. Bridge showing the washout of Jan'y 23, 1920"; No. 151; small view of lock and dam looking upstream, with houses and people visible in background |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
1/28/1920 |
"View from the L&N R.R. Bridge showing washout of Jan'y 23, 1920"; small view of lock and dam looking upstream, with houses visible in background |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
1/29/1920 |
"View from the L&N R.R. Bridge of the channels at Sturgeon Cr."; No. 153; small view including houses; photo is written on, indicating "old channel" and "dredged channel" |
16 |
10 |
0 |
Kentucky River |
Lock No. 10 |
1/31/1920 |
"View of Lock No. 10 from the Abutment side"; small view, including houses in background |
16 |
10 |
0 |
Kentucky River |
Lock No. 10 |
1/31/1920 |
"The sliding Abutment Protection wall"; No. 155; small view |
16 |
0 |
0 |
Paris, KY |
Crane |
1/31/1920 |
"L&N R.R. coal handling crane"; No. 156; small view of crane |
16 |
0 |
0 |
Paris, KY |
Crane |
1/31/1920 |
"L&N R.R. coal handling crane"; No. 157; small view of crane |
16 |
10 |
0 |
Kentucky River |
Lock No. 10 |
1/31/1920 |
"County road 1/2 mile above the lock. The lowest part is in front of the house"; small view, including small bridge and house in distance |
16 |
10 |
0 |
Kentucky River |
Lock No. 10 |
1/31/1920 |
"County road at Horseford Branch, the lowest point on the U.S. Reservation"; No. 159; small view of road |
16 |
10 |
0 |
Kentucky River |
Lock No. 10 |
1/31/1920 |
"County road just below the U.S. Reservation, showing the sliding bank"; No. 160; small view |
16 |
10 |
0 |
Kentucky River |
Lock No. 10 |
1/31/1920 |
"Slide affecting the County road just below U.S. Reservation"; No. 161; small view of road and river |
16 |
10 |
0 |
Kentucky River |
Lock No. 10 |
1/31/1920 |
"Slide affecting the County road just below U.S. Reservation"; No. 162; small view of road and river, with house in background |
16 |
10 |
0 |
Kentucky River |
Lock No. 10 |
1/31/1920 |
"Slide affecting the County road just below U.S. Reservation"; small view of road and river |
16 |
0 |
0 |
Jeffersonville, IN |
Howard Shipyard |
2/11/1920 |
"5 Oil Barges constructed for the Great Northern Refining Co."; No. 164; small view of barges in river |
16 |
0 |
0 |
Jeffersonville, IN |
Howard Shipyard |
2/11/1920 |
"2 Oil Barges under construction for G. N. R. Co."; small view of barge during construction |
16 |
0 |
0 |
Jeffersonville, IN |
Howard Shipyard |
2/11/1920 |
"3 Steel tugs, tunnel stern, under construction"; No. 166; small view of men at work constructing workboats |
16 |
0 |
0 |
Jeffersonville, IN |
Howard Shipyard |
2/11/1920 |
"Steel tug under construction"; No. 167; small view of workboat under construction, with people on it |
16 |
0 |
0 |
Madison, IN |
Marine Ways |
2/27/1920 |
"1 3/8" Chain and Pulling Gear"; No. 168; small view up close, with building visible in background |
16 |
0 |
0 |
Madison, IN |
Marine Ways |
2/27/1920 |
"Bow view of U.S. Towboat "Gregory""; No. 169; small view of towboat from front |
16 |
0 |
0 |
Madison, IN |
Marine Ways |
2/27/1920 |
"Bow view of Towboat "Gregory""; No. 170; small view of towboat from front |
16 |
0 |
0 |
Madison, IN |
Marine Ways |
2/27/1920 |
"Stern view of Towboat "Gregory""; small view of towboat, including people |
16 |
0 |
0 |
Madison, IN |
Marine Ways |
2/27/1920 |
"Side view of Towboat "Gregory""; small view of towboat from side |
16 |
0 |
0 |
Madison, IN |
Marine Ways |
3/8/1920 |
"View of a "Cradle""; small view |
16 |
0 |
0 |
Madison, IN |
Rail Lines |
3/8/1920 |
"P. R.R. Grade up the hill"; No. 174; view of rail lines up a hill, with houses in shot |
16 |
0 |
0 |
Carrollton, KY |
Ship |
3/8/1920 |
"Oldest ship afloat - 128 yrs.; Convictship "Success" in Kentucky River Ice Harbor"; No. 175; small view of old ship from side, with houses in background |
16 |
0 |
0 |
Carrollton, KY |
Ferry Boat |
3/8/1920 |
"Gasoline actuated Ferry Boat"; No. 176; small view of boat from side |
16 |
4 |
0 |
Kentucky River |
Lock No. 4 |
3/21/1920 |
"Lower Gate for Lock No. 5 - Completed"; No. 177; small view |
16 |
4 |
0 |
Kentucky River |
Lock No. 4 |
3/21/1920 |
"Lower Gate for Lock No. 5 - Completed"; No. 178; small view, with house in background |
16 |
4 |
0 |
Kentucky River |
Lock No. 4 |
3/21/1920 |
"Saw Mill and Carpenter Shop"; small view of buildings with two men in foreground |
16 |
4 |
0 |
Kentucky River |
Lock No. 4 |
3/21/1920 |
"Derrickboat No. 4 - 16" x 18" x 67' Boom"; No. 180; small view of workboat |
16 |
4 |
0 |
Kentucky River |
Lock No. 4 |
3/21/1920 |
"Workmen and Rotten Capstan foundations of the Kentucky"; small view of workboat with workers on it posing |
16 |
0 |
0 |
Cincinnati, OH |
Marine Ways |
3/27/1920 |
"Old Queen City Marine Ways"; No. 182; small view of buildings |
16 |
0 |
0 |
Cincinnati, OH |
Marine Ways |
3/25/1920 |
"Queen City Marine Ways - Pulling Crab and Chain"; No 183; small view up close |
16 |
0 |
0 |
Cincinnati, OH |
Marine Ways |
3/27/1920 |
"Queen City Marine Ways - Pulling Crab"; small view |
16 |
0 |
0 |
Cincinnati, OH |
Marine Ways |
3/25/1920 |
"Queen City Marine Ways - Pulling Crab and Foundations"; No. 185; small view |
16 |
0 |
0 |
Cincinnati, OH |
Marine Ways |
3/25/1920 |
"Queen City Marine Ways - Pulling Crab Foundation"; No. 186; small view |
16 |
0 |
0 |
Cincinnati, OH |
Water Front |
3/27/1920 |
"The Water Front - Public Landing"; No. 187; small view of shore line, including people, cars, and buildings |
16 |
0 |
0 |
Cincinnati, OH |
Bridge |
3/27/1920 |
"Cincinnati-Newport Bridge - L&N R.R. Bridge above"; small view of bridge with another bridge visible behind it |
16 |
0 |
0 |
Cincinnati, OH |
Bridge |
3/27/1920 |
"Suspension Bridge - C&O Bridge below"; small view of bridge with another bridge visible behind it |
16 |
0 |
0 |
Jeffersonville, IN |
Derrickboat |
3/31/1920 |
"Steel Derrickboat hull, for Louisville Dist."; small view, with building in background |
16 |
0 |
0 |
Cincinnati, OH |
Misc |
4/13/1920 |
"East End under 3" of Snow"; small view of city during winter from across river; includes church, buildings, and train |
16 |
0 |
0 |
Frankfort, KY |
Towboat |
4/19/1920 |
"First trip of the Great Southern Railway Co's Towboat "Van""; small view of towboat pulling barges, with buildings and other boats in shot |
16 |
0 |
0 |
Frankfort, KY |
Towboat |
4/19/1920 |
"Great Southern Railway Co's Towboat "Van""; 196; small view of towboat pulling barges, with bridge, buildings, and other boats in shot |
16 |
0 |
0 |
Paducah, KY |
Marine Railway |
4/29/1920 |
"Paducah Marine Railway. Taken in rain."; small view including building and workboat |
16 |
0 |
0 |
Paducah, KY |
Tugboat |
4/29/1920 |
"I.C. R.R. Tug - "Cooper" on the ways"; small view of workboat, with building visible in corner |
16 |
0 |
0 |
Paducah, KY |
Pulling Crab |
4/29/1920 |
"Pulling Crab of the Marine Railway"; No. 199; small view |
16 |
0 |
0 |
Mound City, IL |
Steamer |
4/29/1920 |
"Excursion steamer "East St. Louis" - formerly the "Virginia" and also the "Steel City""; small view of a steamship |
16 |
0 |
0 |
Mound City, IL |
Steamer |
4/29/1920 |
"The "Kentucky" on Marine Railway; showing starboard side"; small view, including the "Kentucky" and another workboat, with building in background |
16 |
0 |
0 |
Mound City, IL |
Steamer |
4/29/1920 |
"The "Kentucky" on Marine Railway; showing starboard side"; No. 202; small view, including the "Kentucky" and another workboat in background |
16 |
0 |
0 |
Mound City, IL |
Steamer |
4/29/1920 |
"The "Kentucky" on Marine Railway; showing wheel, and a railway cradle"; small view |
16 |
0 |
0 |
Mound City, IL |
Steamer |
4/29/1920 |
"Steamer "Kentucky" on Marine Railway; showing portside"; small view of steamer with people on and in front of it; another workboat visible in background |
16 |
0 |
0 |
Mound City, IL |
Steamer |
4/29/1920 |
"Steamer "Kentucky" on Marine Railway; showing portside"; small view of steamer with people on and in front of it |
16 |
0 |
0 |
Mound City, IL |
Steamer |
4/29/1920 |
"Rotten "top timbers" in Str. "Kentucky's" hull"; small view up close |
16 |
0 |
0 |
Yellow Rock, KY |
Misc |
5/7/1920 |
"The skiff is where Pryor and Mullins state Albert Fowler's boat was sunk on Sept 17, 1919"; No. 207; small view of river bank with small boat on it; person standing on shore and buildings in background |
16 |
0 |
0 |
Yellow Rock, KY |
Misc |
5/7/1920 |
"Roscoe Newton claims Fowler's boat was sunk at open spot to right of the tree, on Sept 17, 1919"; small view of river bank with houses in shot |
16 |
4 |
0 |
Kentucky River |
Lock No. 4 |
5/19/1920 |
"U.S. Towboat, "Gregory""; small view of a towboat with houses visible in background |
16 |
4 |
0 |
Kentucky River |
Lock No. 4 |
5/19/1920 |
"U.S. Snagboat "Kentucky" and Dredge "Carrollton""; No. 210; small view of ships from one side of river; houses visible in background |
16 |
4 |
0 |
Kentucky River |
Lock No. 4 |
5/19/1920 |
"U.S. Dredge "Carrollton""; No. 211; small view of towboat with people on it and houses visible in background |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
5/28/1920 |
"Derrickboat No. 4, and Concrete Mixer No. 25"; No. 212; small view from river, with houses and water tower in background |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
5/25/1920 |
"Derrickboat No. 4, raising Concrete Mixer (No. 25) Tower and Boom"; No. 213; small view |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
5/26/1920 |
"Derrickboat No. 4, Towed by Estell II"; No. 214; small view of two boats |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
5/26/1920 |
"Repair of Washout - Forms for Concrete paving"; No. 215; small view including people, bridge, and water tower |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
5/26/1920 |
"Repair of Washout - Fill completed - Forms for concrete"; small view including people at work, materials and water tower |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
5/26/1920 |
"Old and New Channels at Sturgeon Creek"; small view of river, including houses along it; photo is written on, labeling "original channel" and "dredged channel" |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
5/26/1920 |
"New Road on Abutment side"; No. 218; small view of dirt road, including person at end of it |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
5/26/1920 |
"New Road on Abutment side"; No. 219; small view of dirt road, with bridge visible in background |
16 |
14 |
0 |
Kentucky River |
Lock No. 14 |
5/26/1920 |
"Flow of water over the dam"; No. 220; small view of dam |
16 |
10 |
0 |
Kentucky River |
Lock No. 10 |
6/2/1920 |
"Towboat "Gregory""; No. 221; small view of towboat in river |
16 |
10 |
0 |
Kentucky River |
Lock No. 10 |
6/2/1920 |
"Derrickboat No. 3"; No. 222; small view of derrickboat in river |
16 |
10 |
0 |
Kentucky River |
Lock No. 10 |
6/2/1920 |
"Abutment Wall, banked with rock to stop sliding"; No. 225; small view |
16 |
10 |
0 |
Kentucky River |
Lock No. 10 |
6/2/1920 |
"Headbay girder, and dam in place"; No. 226; small view |
16 |
10 |
0 |
Kentucky River |
Lock No. 10 |
6/2/1920 |
"Repairing upper wall valves and scraping gate"; No. 227; small view, including men at work |
16 |
10 |
0 |
Kentucky River |
Lock No. 10 |
6/2/1920 |
"Worn out and broken valve "spiders""; No. 228; small view |
16 |
10 |
0 |
Kentucky River |
Lock No. 10 |
6/2/1920 |
"Rust on upper side of upper gate - land leaf"; No. 229; small view of gate up close |
16 |
10 |
0 |
Kentucky River |
Lock No. 10 |
6/2/1920 |
"Rust on upper side of upper gate - River leaf"; small view of gate up close |
16 |
13 |
0 |
Kentucky River |
Dam No. 13 |
6/8/1920 |
"Crest after being submerged on June 3, by a sudden rise"; No. 231; small view of dam |
16 |
13 |
0 |
Kentucky River |
Dam No. 13 |
6/8/1920 |
"Crest after being submerged by a sudden rise"; No. 232; small view of dam from side, with houses visible on opposite side |
16 |
13 |
0 |
Kentucky River |
Dam No. 13 |
6/8/1920 |
"Crest after being submerged June 3 by a sudden rise"; No. 233; small view of dam, with houses visible in background |
16 |
0 |
0 |
Bellepoint, KY |
Pool No. 14 |
6/14/1920 |
"Bellepoint Lumber Co's rafts obstructing navigation"; No. 234; small view |
16 |
0 |
0 |
Whiteash, KY |
Pool No. 14 |
6/15/1920 |
"Coal loading plant of the Beattyville Co."; No. 235; small view, including barge and person |
16 |
4 |
0 |
Kentucky River |
Lock No. 4 |
6/16/1920 |
"Dredge "Frankfort""; No. 236; small view of dredge, with buildings visible in background |
16 |
4 |
0 |
Kentucky River |
Lock No. 4 |
6/16/1920 |
"Dredge "Frankfort""; No. 237; small view of dredge, with buildings, houses and water tower visible in background |
16 |
9 |
0 |
Kentucky River |
Lock No. 9 |
6/16/1920 |
"Laying Concrete footing on lower Guide Wall Crib"; No. 238; small view of men at work, including workboats and barges in shot |
16 |
10 |
0 |
Kentucky River |
Lock No. 10 |
7/25/1920 |
"Boonesborough; Burial Ground of first settlers - now a slaughtering place and hog-pen"; No. 241; small view including people |
16 |
10 |
0 |
Kentucky River |
Lock No. 10 |
7/25/1920 |
"Boonesborough; Boones' Tree; A 6' Sycamore; small view of tree with a woman in front of it |
16 |
10 |
0 |
Kentucky River |
Lock No. 10 |
7/29/1920 |
"Derrickboat No. 3 and Stone Crusher at Williams Quarry"; No. 245; small view of workboat at barge |
16 |
10 |
0 |
Kentucky River |
Lock No. 10 |
7/29/1920 |
"Concreting the footing course of the Lower Guide Wall"; No. 247; small view including workboats, and houses |
16 |
10 |
0 |
Kentucky River |
Lock No. 10 |
7/29/1920 |
"Concreting the footing course of the Lower Guide Wall"; No. 248; small view including workboats and people |
16 |
0 |
0 |
Kentucky River |
Pool No. 6 |
8/13/1920 |
"The Little Candlestick"; No. 249; small view of a cliff |
16 |
0 |
0 |
Kentucky River |
Pool No. 6 |
8/13/1920 |
"Home of Jack Chinn at Mundy's"; No. 250; small view of a house |
16 |
0 |
0 |
Kentucky River |
Pool No. 6 |
8/13/1920 |
""Upper Mine" - Calcite"; No. 251; small view |
16 |
0 |
0 |
Kentucky River |
Pool No. 6 |
8/13/1920 |
"Brooklyn Bridge"; No. 252; small view of a bridge with houses visible in background |
16 |
0 |
0 |
Kentucky River |
Pool No. 7 |
8/13/1920 |
"High Bridge - Q&C R.R."; small view of a bridge |
16 |
0 |
0 |
Kentucky River |
Pool No. 13 |
8/13/1920 |
"Swallow Rock"; No. 254; small view of rock wall |
16 |
0 |
0 |
Kentucky River |
Pool No. 9 |
8/14/1920 |
"Southern Refining Co's pumping station"; No. 255; small view, including barge and workboat |
16 |
0 |
0 |
Kentucky River |
Pool No. 9 |
8/14/1920 |
"Clay's Ferry Barge"; small view of a bridge |
16 |
11 |
0 |
Kentucky River |
Dam No. 11 |
8/17/1920 |
"Placing Forms for the dam crest"; No. 257; small view of dam with workboat alongside it and men at work |
16 |
11 |
0 |
Kentucky River |
Dam No. 11 |
8/18/1920 |
"Placing Concrete in the dam crest"; No. 258; small view including workboat, barges, and houses |
16 |
12 |
0 |
Kentucky River |
Dam No. 12 |
9/13/1920 |
"Drift gorge against concrete forms for crest. -No damage-"; No. 259; small view |
16 |
12 |
0 |
Kentucky River |
Dam No. 12 |
9/13/1920 |
"Drift gorge against concrete forms for crest. -No damage-"; No. 260; small view |
16 |
12 |
0 |
Kentucky River |
Dam No. 12 |
9/13/1920 |
"Drift gorge against concrete forms for crest. -No damage-"; small view |
16 |
12 |
0 |
Kentucky River |
Dam No. 12 |
9/12/1920 |
"Masonry completed except for 40 ft"; No. 262; small view of dam looking upstream |
16 |
12 |
0 |
Kentucky River |
Dam No. 12 |
9/20/1920 |
"Removing forms from crest masonry"; No. 263; small view of dam from one side of river, including workboat and people |
16 |
11 |
0 |
Kentucky River |
Dam No. 11 |
8/20/1920 |
"144 Lin ft of crest masonry completed"; No. 264; small view including workboat |
16 |
11 |
0 |
Kentucky River |
Dam No. 11 |
8/21/1920 |
"Crest Completed"; No. 265; small view of dam, including workboat and people |
16 |
12 |
0 |
Kentucky River |
Dam No. 12 |
9/10/1920 |
"Began placing concrete of new crest"; No. 266; small view including workboat and barge, and houses in background |
16 |
12 |
0 |
Kentucky River |
Dam No. 12 |
9/10/1920 |
"Placing concrete on new crest"; No. 267; small view including dam, ship and workers |
16 |
13 |
0 |
Kentucky River |
Dam No. 13 |
10/19/1920 |
"A-frame crest in operation"; No. 268; small faded view of dam |
16 |
13 |
0 |
Kentucky River |
Dam No. 13 |
10/19/1920 |
"A-frame crest in operation - Downstream view"; No. 269; small faded view of dam, with workboat alongside dam and person walking on it |
16 |
13 |
0 |
Kentucky River |
Dam No. 13 |
10/19/1920 |
"A-frame crest in operation. Downstream and end view"; No. 270; small view of dam with workboat alongside it and men at work |
16 |
13 |
0 |
Kentucky River |
Dam No. 13 |
10/19/1920 |
"A-frame crest in operation. Up stream view"; No. 271; small view of dam including workboat and barge |
16 |
14 |
0 |
Kentucky River |
Dam No. 14 |
10/22/1920 |
"Concreting masonry of A-frame crest"; No. 272; small view of lock and dam looking upstream, with workboats on far side of dam |
16 |
14 |
0 |
Kentucky River |
Dam No. 14 |
10/22/1920 |
"Placing concrete for A-frame crest"; No. 273; small view of dam being worked on by workboats and people |
16 |
14 |
0 |
Kentucky River |
Dam No. 14 |
10/22/1920 |
"Placing concrete for A-frame crest"; No. 274; small view of dam being worked on be people and workboat |
16 |
14 |
0 |
Kentucky River |
Dam No. 14 |
10/22/1920 |
"The Tower of the Mixer"; small view, including people |
16 |
0 |
0 |
Kentucky River |
Pool No. 11 |
10/27/1920 |
"Barge No. 29 sunk in No. 11 pool, near Irvine on Oct 26, 1920"; No. 276; small view, including barge, canoe, and people at work |
17 |
12 |
0 |
Kentucky River |
Dam No. 12 |
10/27/1920 |
"A-frame crest in operation. Downstream view"; No. 277; small view of dam |
17 |
12 |
0 |
Kentucky River |
Dam No. 12 |
10/27/1920 |
"A-frame crest in operation. End view"; No. 278; small view of dam, including workboat |
17 |
12 |
0 |
Kentucky River |
Dam No. 12 |
10/27/1920 |
"A-frame crest in operation. Downstream and end view"; No. 279; small view of dam, including workboat |
17 |
14 |
0 |
Kentucky River |
Dam No. 14 |
10/27/1920 |
"Completed concrete for A-frame crest"; No. 280; small view of the dam |
17 |
14 |
0 |
Kentucky River |
Dam No. 14 |
10/27/1920 |
"Completed concrete for A-frame crest"; No. 281; small view of the dam |
17 |
0 |
0 |
Kentucky River |
Pool No. 14 |
10/27/1920 |
"Mouth of South Fork at Beattyville, Ky."; No. 282; small view, including workboat and bridge |
17 |
0 |
0 |
Kentucky River |
Pool No. 14 |
10/28/1920 |
"Beattyville from "Nina Web" Inn."; No. 283; small view of town, including bridge and houses |
17 |
3 |
0 |
Kentucky River |
Dam No. 3 |
11/15/1920 |
"Cofferdam for raising crest completed"; No. 284; small view of dam being worked on by men; includes workboat |
17 |
3 |
0 |
Kentucky River |
Dam No. 3 |
11/19/1920 |
"Completing by jet the excavation for raising the crest"; No. 285; small view of man at work on dam |
17 |
3 |
0 |
Kentucky River |
Dam No. 3 |
11/19/1920 |
"Excavation for raising crest completed"; No. 286; small view of dam during construction |
17 |
3 |
0 |
Kentucky River |
Dam No. 3 |
11/22/1920 |
"Pouring concrete in crest. Later the mixer broke past repair and work stopped by a rise"; No. 287; small view of construction site |
17 |
0 |
0 |
Airedale, KY |
Pool No. 14 |
11/29/1920 |
"Old L&N R.R. Bridge wrecked for its steel"; No. 288; small view of bridge, half in water |
17 |
0 |
0 |
Airedale, KY |
Pool No. 14 |
11/29/1920 |
"Old L&N R.R. Bridge wrecked for its steel"; No. 289; small view of bridge, half in water |
17 |
0 |
0 |
Airedale, KY |
Pool No. 14 |
11/29/1920 |
"Old L&N R.R. Bridge wrecked for its steel"; No. 290; small view of bridge, half in water |
17 |
4 |
0 |
Kentucky River |
Lock No. 4 |
12/1/1920 |
"U.S. Launch "Ion" under construction"; small view of workboat in river, with houses in background |
17 |
4 |
0 |
Kentucky River |
Lock No. 4 |
12/1/1920 |
"U.S. Launch "Ion" under construction. Interior."; small view of workboat inside |
17 |
4 |
0 |
Kentucky River |
Lock No. 4 |
12/6/1920 |
"Derrickboat Nos 4 and 5, lifting Barge No. 72 to blocking"; small view of workboats lifting barge |
17 |
4 |
0 |
Kentucky River |
Lock No. 4 |
12/6/1920 |
"Wood Barge No. 69, under construction"; No. 294; small view |
17 |
5 |
0 |
Kentucky River |
Lock No. 5 |
12/8/1920 |
"Mounting the new lower gate"; small view of workboats lifting gate |
17 |
3 |
0 |
Kentucky River |
Lock No. 3 |
1/3/1921 |
"Old lower gate"; No. 296; small view of men standing on old gate with boats and houses in background |
17 |
3 |
0 |
Kentucky River |
Lock No. 3 |
1/3/1921 |
"Heel of old lower gate"; No. 297; small view of old gate up close, with houses visible in background |
17 |
0 |
0 |
Frankfort, KY |
Boats |
1/3/1921 |
""Mary Jane" towing Carrollton and scows"; No. 298; small view, including houses |
17 |
0 |
0 |
Frankfort, KY |
Tow and Barges |
1/3/1921 |
"The "Ion" towing two steel barges, partly loaded"; No. 299; small view, including houses |
17 |
0 |
0 |
Frankfort, KY |
Boats |
1/3/1921 |
"Tug of War - The "Ion" pushing the "Mary Jane" backward about 2 1/2 miles per hour, across current"; small view |
17 |
0 |
0 |
Frankfort, KY |
Boats |
1/3/1921 |
"Tug of War - The "Ion" pushing the "Mary Jane" backward upstream about 2 miles per hour."; No. 301; small view |
17 |
0 |
0 |
Frankfort, KY |
Boats |
1/4/1921 |
"Tug of War - The "Ion" pushing the "Mary Jane" backward upstream about 2 miles per hour."; No. 302; small view, including workboats and buildings |
17 |
0 |
0 |
Frankfort, KY |
Workboat |
1/12/1921 |
"The "Ion" at full speed"; small view of workboat with person on it, with bridge and buildings in shot |
17 |
0 |
0 |
Frankfort, KY |
Crane |
1/12/1921 |
"Showing the casting that broke and caused the wrecking of the "Ohio" crane"; No. 304; small view up close |
17 |
0 |
0 |
Frankfort, KY |
Crane |
1/12/1921 |
"The "Ohio" crane damaged by wreck"; small view of a trane with crane parts on one of the cars |
17 |
0 |
0 |
Frankfort, KY |
Crane |
1/12/1921 |
"The "Ohio" crane damaged by wreck"; small view of a trane with crane parts on one of the cars |
17 |
0 |
0 |
Frankfort, KY |
Crane |
1/12/1921 |
"The "Ohio" crane damaged by wreck"; small view of a trane with crane parts on one of the cars; houses in background |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
1/17/1921 |
"New fastenings on the lower gate"; small view of men standing on gate, with buildings in background |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
1/17/1921 |
"Fastenings on the lower gate, to hold in closed position"; small view of men standing on gate, with buildings in background |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
2/7/1921 |
"Rip Rap below the Guide Wall and rig used to place it"; No. 310; small view including workboat and houses |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
2/8/1921 |
"Rip Rap below the Guide Wall and rig used to place it"; No. 311; small view including workboat, barge, workers and houses |
17 |
0 |
0 |
Kentucky River |
Pool No. 7 |
2/15/1921 |
"Candle Slick, 40 ft high, 2 ft base"; small view of rock wall in canyon |
17 |
0 |
0 |
Clay's Ferry |
Pool No. 9 |
2/15/1921 |
"Great Southern Refining Co's Oil Pumping Plant"; No. 314; small view including barges, building and water tower |
17 |
0 |
0 |
Frankfort, KY |
Scow No. 53 |
3/15/1921 |
"Scow No. 53 - Docked for painting"; small view of scow up close |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
3/20/1921 |
"Upper Triangular Guard Piers"; No. 317; small view |
17 |
0 |
0 |
Kentucky River |
Pool No. 8 |
3/20/1921 |
"Devils Pulpit"; No. 318; small view of rock wall in canyon |
17 |
0 |
0 |
Kentucky River |
Pool No. 6 |
3/21/1921 |
"Heyward Mineral Co's Fluorspar Mine"; No. 319; small view of mine |
17 |
10 |
0 |
Kentucky River |
Lock No. 10 |
4/6/1921 |
"Site of old Boonesborough Fort"; small view of river bank with houses visible |
17 |
10 |
0 |
Kentucky River |
Lock No. 10 |
4/6/1921 |
"Road on Abutment side showing general conditions"; No. 321; small view of dirt road, with house and people at end of it |
17 |
10 |
0 |
Kentucky River |
Lock No. 10 |
4/6/1921 |
"Condition of Road at narrowest place. Abutment side"; small view of dirt road along river |
17 |
10 |
0 |
Kentucky River |
Lock No. 10 |
4/6/1921 |
"Condition of Road near lower end of the reservation"; No. 323; small view of dirt road along river; house visible in background |
17 |
10 |
0 |
Kentucky River |
Lock No. 10 |
4/6/1921 |
"Condition of Road near lower end. The trees are at the line"; small view of dirt road along river; dam visible in background |
17 |
0 |
0 |
Kentucky River |
Pool No. 7 |
4/7/1921 |
"Mouth of Dix River"; No. 325; small view of river from above, including buildings |
17 |
0 |
0 |
Harrodsburg, KY |
Cabin |
4/6/1921 |
"Cabin in which Lincoln's father and mother were married"; No. 326; small view of cabin and two people |
17 |
0 |
0 |
Danville, KY |
Kentucky State House |
4/8/1921 |
"First Kentucky State House"; small view of a building |
17 |
0 |
0 |
Kentucky River |
Pool No. 1 |
4/11/1921 |
"The Worthville L&N R.R. Bridge"; small view of a bridge with a train passing over it |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
4/14/1921 |
"Upper Guide Pile Clusters"; small view including workboat, people, and ship |
17 |
2 |
0 |
Kentucky River |
Lock No. 2 |
4/22/1921 |
"Lower Gate Lock No. 2"; small view of gate leaking, with men standing on it; workboat in background |
17 |
2 |
0 |
Kentucky River |
Lock No. 2 |
4/22/1921 |
"Digging deposit from upper entrance"; small view including workboat |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
4/22/1921 |
"Digging deposit from upper entrance"; small view including workboat |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
4/22/1921 |
"Completed repairs to Upper Guard Wall"; No. 333; small view including workboat |
17 |
0 |
0 |
Kentucky River |
Misc |
4/22/1921 |
"Carrollton, Ky.; Mouth of the Kentucky River, looking downstream"; No. 334; small view including workboats, barges, and bridge in distance |
17 |
0 |
0 |
Kentucky River |
Misc |
4/23/1921 |
"Carrollton, Ky.; Mouth of the Kentucky River from Indiana shore"; small view including bridge, water tower and buildings |
17 |
0 |
0 |
Cincinnati, OH |
Corn Beef Hash |
4/25/1921 |
"18,600 lbs Corn Beef Hash delivered to 1st Cinti Dist"; small view including people and buildings |
17 |
10 |
0 |
Kentucky River |
Lock No. 10 |
5/5/1921 |
"Upper Guide Wall Pile Clusters"; small view including workboat |
17 |
0 |
0 |
Cincinnati, OH |
Marine Ry Line |
5/9/1921 |
"Foundation for Marine Ry Line shaft and secondary worm shaft"; small view up close |
17 |
0 |
0 |
Cincinnati, OH |
Ships |
5/10/1921 |
""Morning Star" and "Island Queen" at wharf"; small view of ships with buildings behind them |
17 |
37 |
0 |
Ohio River |
Dam No. 37 |
5/10/1921 |
"Fern Bank; "Kentucky" and fleet with Marine Ry machinery"; small view including ships and workboat |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
6/6/1921 |
"Repairing A-frame crest. Damaged by drift during winter"; No. 341; small view of people working on dam |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
6/6/1921 |
"Crest A-frames, showing damage by drift"; small view with people visible in background |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
6/6/1921 |
"Crest A-frames, and downstream anchors damaged by drift"; small view up close |
17 |
13 |
0 |
Kentucky River |
Lock No. 13 |
6/7/1921 |
"A frame Crest, damaged by drift during winter"; small view of dam |
17 |
13 |
0 |
Kentucky River |
Lock No. 13 |
6/7/1921 |
"A-frame crest damaged by drift"; No. 345; small view of dam including house and people |
17 |
13 |
0 |
Kentucky River |
Lock No. 13 |
6/7/1921 |
"A-frame crest damaged by drift during winter"; small view of dam |
17 |
13 |
0 |
Kentucky River |
Locks Nos 12 & 13 |
6/15/1921 |
"Damaged A-frames from the crests"; small view up close |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
6/15/1921 |
"Upper Guide Wall, Pile Clusters"; small view including houses and workboat |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
6/21/1921 |
"Head-bay Girder and Dam"; small view up close |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
6/21/1921 |
"River Wall; Upper Valves"; No. 350; small view of gate including people |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
6/21/1921 |
"Land Wall; Upper Valves"; small view of gate, including houses and people |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
6/21/1921 |
"Boy Scouts at Camp, Daniel Boone"; No. 352; small view of children on river dock |
17 |
7 |
0 |
Kentucky River |
Lock No. 7 |
6/25/1921 |
"Entrance to Spring House"; No. 353; small view of people in front of a rock wall, with cows |
17 |
13 |
0 |
Kentucky River |
Lock No. 13 |
7/15/1921 |
"Lower Guard Wall Completed"; No. 354; small view of lock and dam |
17 |
32 |
0 |
Ohio River |
Lock No. 32 |
7/21/1921 |
"Dravo, Ky.; Ohio River Lock No. 32 under construction"; small view of lock during construction, including materials, rail lines, workers, and machinery |
17 |
0 |
0 |
Dravo, KY |
Land Whirler |
7/27/1921 |
"Dravo Contract Co's Land Whirler"; No. 356; small view |
17 |
2 |
0 |
Kentucky River |
Lock No. 2 |
8/30/1921 |
"Old Lower Gate removed"; No. 357; small view including and barge |
17 |
3 |
0 |
Kentucky River |
Lock No. 3 |
8/22/1921 |
"When Cedar Creek struck on opposite side after Cloud-burst of Aug 14th - Below the "part" all stalks point downstream, above it, all point up"; No. 358; small view |
17 |
3 |
0 |
Kentucky River |
Lock No. 3 |
8/22/1921 |
"Derrick No. 5. Removing very large snag from Lower Approach"; No. 359; small view including workboat and people in a canoe |
17 |
0 |
0 |
Kentucky River |
Pool No. 3 |
8/22/1921 |
"Derrick No. 5. Removing very large snag"; small view including workboat and people |
17 |
0 |
0 |
Kentucky River |
Pool No. 3 |
8/22/1921 |
"Derrick No. 5. Removing very large snag at Elkhorn bend"; small view including workboat |
17 |
0 |
0 |
Frankfort, KY |
Air Compressor |
9/9/1921 |
"Loading 12" x 16" Air Compressor at Wharf"; No. 362; small view including workboat, ships, people and buildings |
17 |
10 |
0 |
Kentucky River |
Lock No. 10 |
9/12/1921 |
"Upper Guide Pile Clusters completed"; No. 363; small view |
17 |
10 |
0 |
Kentucky River |
Lock No. 10 |
9/12/1921 |
"Lower Guide Wall Completed"; No. 364; small view including barge, boats, people and buildings |
17 |
4 |
0 |
Kentucky River |
Lock No. 4 |
9/20/1921 |
"Construction of Marine Ways begun"; No. 365; small view including workboats and barge |
17 |
4 |
0 |
Kentucky River |
Lock No. 4 |
9/20/1921 |
"Launch "Chenoka""; No. 366; small view including workboat |
17 |
4 |
0 |
Kentucky River |
Lock No. 4 |
9/20/1921 |
"Driving Piles for Pump's at Marine Ways"; No. 367; small view of workboat with ship in background |
17 |
4 |
0 |
Kentucky River |
Lock No. 4 |
10/14/1921 |
"Coffer for Marine Ways"; small view of river bank |
17 |
0 |
0 |
Frankfort, KY |
Hydroplane |
10/22/1921 |
"Hydroplane at the Wharf"; No. 369; small view including workboat, people, and buildings |
17 |
4 |
0 |
Lock No. 4 |
Marine Ways |
11/3/1921 |
""Marine Ways" under Construction"; No. 370; small view of workers on site, with buildings in background |
17 |
4 |
0 |
Lock No. 4 |
Marine Ways |
11/3/1921 |
""Marine Ways" under Construction"; No. 371; small view of workers on site, with ship and building in background |
17 |
4 |
0 |
Lock No. 4 |
Marine Ways |
11/3/1921 |
""Marine Ways" under Construction"; No. 372; small view of workers on site, with ship and buildings in background |
17 |
4 |
0 |
Lock No. 4 |
Marine Ways |
11/3/1921 |
"Pumps at "Marine Ways" Cofferdam"; No. 373; small view of pumps with ship in background |
17 |
4 |
0 |
Kentucky River |
Lock No. 4 |
11/7/1921 |
"Under water parts of the "Marine Ways" completed"; No. 374; small view of workers on site, with ship and buildings in background |
17 |
4 |
0 |
Kentucky River |
Lock No. 4 |
11/7/1921 |
"Under water parts of the "Marine Ways" completed"; No. 375; small view of workers on site, with ship and buildings in background |
17 |
4 |
0 |
Kentucky River |
Lock No. 4 |
11/21/1921 |
"Indicator Rigging on the "Chenoka's" engine"; No. 376; small view up close |
17 |
0 |
0 |
Frankfort, KY |
Chief Mechanical Engineer |
11/21/1921 |
"Mr. O., Illi Chief Mechanical Engineer, Chief of the Engineer's Office"; No. 377; small view of man |
17 |
0 |
0 |
Frankfort, KY |
Bridge |
11/29/1921 |
"St. Clair St. Bridge undergoing repairs"; No. 378; small view of bridge with buildings in background |
17 |
4 |
0 |
Kentucky River |
Lock No. 4 |
12/6/1921 |
"Chanoine Wickets, under construction for Dam No. 30, Ohio River"; No. 379; small view including people, materials, and building in background |
17 |
4 |
0 |
Kentucky River |
Lock No. 4 |
12/6/1921 |
"G.E. 25 K.W. Generator Set operating with kerosene as fuel. Showing Indicator rigging attached"; No. 380; small view of machinery up close |
17 |
4 |
0 |
Kentucky River |
Lock No. 4 |
12/6/1921 |
"G.E. 25 K.W. Generator Set showing attachments for taking Indicator Cards, and for operating with kerosene as fuel"; No. 381; small view of machinery up close |
17 |
10 |
0 |
Kentucky River |
Lock No. 10 |
12/12/1921 |
"Grading of Road on Abutment side completed"; No. 382; small view of dirt road |
17 |
0 |
0 |
Frankfort, KY |
Bridge |
12/14/1921 |
"St. Clair St. Bridge; new floor system"; No. 383; small view of bridge with boat and buildings visible in background |
17 |
4 |
0 |
Lock No. 4 |
W. P. Stokey |
12/15/1921 |
"Lieut. Col. W. P. Stokey"; No. 384; small view of man in front of buildings |
17 |
4 |
0 |
Lock No. 4 |
W. P. Stokey |
12/15/1921 |
"Lieut. Col. W. P. Stokey"; No. 385; small view of man in front of buildings |
17 |
0 |
0 |
Emsworth, PA |
Misc |
1/26/1922 |
"The Emsworth Lock and Plant of Dravo Cont Co"; No. 386; small view of boats in lock, with people included |
17 |
0 |
0 |
Nevill Island, PA |
Boatyard |
1/26/1922 |
"Dravo Contracting Co's Boatyard"; #387; small view, including rail lines, people, machinery, and houses in background |
17 |
0 |
0 |
Nevill Island, PA |
Boatyard |
1/26/1922 |
"Dravo Contracting Co's Boatyard"; #388; small view, including rail lines, machinery, people, and houses in background |
17 |
0 |
0 |
Nevill Island, PA |
Boat |
1/26/1922 |
""The Peace" - Twin Screw, Tunnel, Stern, all steel Tug. Dravo Cont Co"; No. 389; small view of workboat including people |
17 |
0 |
0 |
Nevill Island, PA |
Boat |
1/26/1922 |
"Keystone Sand Co's new Towboat "Victory""; No. 390; small view of workboat, including houses in background |
17 |
0 |
0 |
Nevill Island, PA |
Boat |
1/26/1922 |
"Keystone Sand Co's Towboat "Victory""; No. 391; small view of workboat, including houses in background |
17 |
0 |
0 |
Wilson, PA |
Marine Ways |
1/26/1922 |
"Carnegie Steel Co's Marine Ways"; No. 392; small view including workboat |
17 |
0 |
0 |
Wilson, PA |
Marine Ways |
1/26/1922 |
"Carnegie Steel Co's Marine Ways"; No. 393; small view including ship |
17 |
0 |
0 |
Wilson, PA |
Derrickboat |
1/26/1922 |
"Carnegie Steel Co's new all steel Derrickboat "Ice Breaker"; No. 394; small view |
17 |
0 |
0 |
Wilson, PA |
Towboat |
1/26/1922 |
"Carnegie Steel Co's latest towboat "Wm G. Clyde"; No. 395; small view |
17 |
0 |
0 |
Wilson, PA |
Towboat |
1/26/1922 |
"Carnegie Steel Co's Towboat "Monitor" - 750 HP(?)"; No. 396; small view including workboat and buildings in background |
17 |
0 |
0 |
Wilson, PA |
Towboat |
1/26/1922 |
"Carnegie Steel Co's Twin Screw Tunnel Stern 1500 HP(?) Towboat "Kanawha""; No. 397; small view including people |
17 |
0 |
0 |
Hays, PA |
Workboat |
1/27/1922 |
"The "William M. Griffith" at Eichleay's Yard"; No. 398; small view of workboat |
17 |
0 |
0 |
Hays, PA |
Workboat |
1/27/1922 |
"Towboat "William M. Griffith" 8" Cylinders, Eichleay's Yard"; No. 399; small view of workboat |
17 |
4 |
0 |
Kentucky River |
Lock No. 4 |
2/2/1922 |
"Marine Ways under construction"; No. 400; small view including machinery |
17 |
4 |
0 |
Kentucky River |
Lock No. 4 |
2/2/1922 |
"Marine Ways under construction"; No. 401; small view including workers, machinery, materials and building in background |
17 |
6 |
0 |
Kentucky River |
Lock No. 6 |
2/4/1922 |
"Road to be ditched and repaired"; No. 402; small view of dirt road |
17 |
6 |
0 |
Kentucky River |
Lock No. 6 |
3/14/1922 |
"Road ditched and metal placed"; No. 403; small view of dirt road with men walking on it |
17 |
6 |
0 |
Kentucky River |
Lock No. 6 |
3/14/1922 |
"Road completed"; small view, including houses and man |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
3/12/1922 |
"Crack in paving behind lower Guide Wall"; No. 405; small view up close |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
3/21/1922 |
"Slip in Rip Rapped bank below the lower Guide Wall"; No. 406; small view |
17 |
10 |
0 |
Kentucky River |
Lock No. 10 |
3/23/1922 |
"Upper guide pile clusters damaged by drift"; No. 407; small view including houses |
17 |
10 |
0 |
Kentucky River |
Lock No. 10 |
3/23/1922 |
"Upper guide pile clusters damaged by drift"; small view |
17 |
0 |
0 |
Unknown |
Pool No. 10 |
3/23/1922 |
"Gas Boat, "Ruth" and Oil barge"; No. 409; small view |
17 |
10 |
0 |
Lock No. 10 |
Repairs |
4/11/1922 |
"Upper Guide Pile Clusters repaired"; No. 410; small view including workboat |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
4/24/1922 |
"Upper Triangular Guard Piers"; small view |
17 |
0 |
0 |
Irvine, KY |
Pool No. 11 |
4/30/1922 |
"Irvine, Ky."; No. 412; small view of town from river |
17 |
0 |
0 |
Kentucky River |
Pool No. 11 |
5/1/1922 |
"Estel II with barge of oil"; No. 413; small view of workboat and barge |
17 |
11 |
0 |
Kentucky River |
Lock No. 11 |
5/1/1922 |
"Settlement of paving"; No. 414; small view including people |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
5/9/1922 |
"Strengthening the pile clusters"; small view, including workboat |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
5/25/1922 |
"View of upper guard pier damaged by drift"; small view |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
5/25/1922 |
"New Upper Gate mounted"; No. 417; small view including workboat and people |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
5/25/1922 |
"Leakage of Valves in new upper Gate - Valves not yet "grounded in""; No. 418; small view of lock gate, with people and workboat visible |
17 |
0 |
0 |
Unknown |
Winter |
|
Small view of winter conditions, including bridge, water tower and houses |
17 |
0 |
0 |
Unknown |
Ship |
|
Very small view of ship "La Belle" |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
6/2/1922 |
"Repairs to Triangular Guard Pier completed"; No. 419; small view |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
6/7/1922 |
""Chenoka" at Sturgeon Creek"; No. 420; small view of workboat, including person |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
6/7/1922 |
"Slip in Road, on Abutment side"; No. 421; small view of dirt road with men on it |
17 |
11 |
0 |
Kentucky River |
Lock No. 11 |
6/22/1922 |
"Lower Guard Wall completed"; No. 422; small view |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
6/22/1922 |
"Lower Anchors of Crest damaged by drift"; No. 423; small view |
17 |
12 |
0 |
Kentucky River |
Dam No. 12 |
7/17/1922 |
"Repairs to Crest completed"; No. 424; small view of dam |
17 |
0 |
0 |
Ohio River |
Eagle Hollow Quarry |
7/20/1922 |
"Eagle Hollow Quarry; Face of Quarry"; No. 425; small view including people and small building |
17 |
13 |
0 |
Kentucky River |
Dam No. 13 |
7/24/1922 |
"Cement Gun on Crest"; No. 426; small view of men at work on dam; includes workboat and machinery, with building in background |
17 |
13 |
0 |
Kentucky River |
Dam No. 13 |
7/24/1922 |
"Bevelon Crest squared up, by Cement Gun"; No. 427; small view of dam, including barge, people and small buildings |
17 |
3 |
0 |
Kentucky River |
Dam No. 3 |
8/22/1922 |
"Coffer for Dam Crest"; No. 428; small view including workboats and house |
17 |
3 |
0 |
Kentucky River |
Dam No. 3 |
8/22/1922 |
"Coffer for Dam Crest"; No. 429; small view including workboats, people and house |
17 |
4 |
0 |
Kentucky River |
Lock No. 4 |
9/18/1922 |
"Concreting Marine Ways Machinery Foundation"; No. 430; small view inclduding people, machinery and house |
17 |
4 |
0 |
Kentucky River |
Lock No. 4 |
9/18/1922 |
"Heating and Straightening Orange Peel"; No. 431; small view including people at work |
17 |
0 |
0 |
Eagle Quarry |
Stone |
10/10/1922 |
"12,000 Cu Yards of Stone in pile"; No. 432; small view including ship |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/30/1922 |
""Chenoka""; No. 433; small view of men on workboat |
17 |
9 |
0 |
Kentucky River |
Dam No. 9 |
10/30/1922 |
"Downstream face of Dam No. 9"; No. 434; small view |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/30/1922 |
"Excavating the Upper Triangular Guard Piers"; No. 435; small view including workboat and people at work |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
11/9/1922 |
"Upper Triangular Guard Piers; Placing Concrete"; No. 436; small view of men at work |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
11/15/1922 |
"Upper Triangular Guard Piers Completed"; No. 437; small view |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
11/28/1922 |
"Laying Concrete floor in Lock"; No. 438; small view including person |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
11/28/1922 |
"Placing Concrete floor in 16' of water"; No. 439; small view including person |
17 |
12 |
0 |
Kentucky River |
Dam No. 12 |
12/26/1922 |
"13 A-frames, floated up and damaged by drift"; No. 440; small view of dam |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
1/16/1923 |
"Head-bay Dam"; No. 441; small view |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
1/16/1923 |
"Land Wall Valves and Gate"; No. 442; small view including person |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
1/16/1923 |
"River Wall Valves and Gate"; No. 443; small view including people |
17 |
4 |
0 |
Kentucky River |
Lock No. 4 |
2/23/1923 |
"Shrinking on the Starboard crank of Str Kentucky"; No. 444; small view including people |
17 |
4 |
0 |
Kentucky River |
Lock No. 4 |
3/2/1923 |
"Marine Ways - Pulling the first barge, No. 48"; small view including person and barge |
17 |
4 |
0 |
Kentucky River |
Lock No. 4 |
3/2/1923 |
"Marine Ways completed - Pulling the first barge - No. 48"; No. 446; small view including barges, workboat and house |
17 |
11 |
0 |
Kentucky River |
Lock No. 11 |
3/23/1923 |
"Five Boats waiting to lock - Gate Valve out of commission"; No. 447; small view of lock and boats |
17 |
0 |
0 |
Frankfort, KY |
Misc |
3/26/1923 |
"View from office window"; No. 448; small view of Frankfort, including people, car, buildings, bridge and houses |
17 |
3 |
0 |
Kentucky River |
Lock No. 3 |
3/28/1923 |
"Condition of Upper Guard Wall"; No. 449; small view |
17 |
4 |
0 |
Kentucky River |
Lock No. 4 |
4/10/1923 |
"New Upper Gate for Lock No. 3 completed"; No. 450; small view including person |
17 |
4 |
0 |
Kentucky River |
Lock No. 4 |
4/11/1923 |
"Testing the Marine Ways with load of 340 tons on 4 cradles"; No. 451; small view including houses, workboats and barges |
17 |
11 |
0 |
Kentucky River |
Lock No. 11 |
4/12/1923 |
"Rip-Rap below Guide Wall completed"; No. 452; small view including people and houses |
17 |
10 |
0 |
Kentucky River |
Lock No. 10 |
4/12/1923 |
"Cement Gun working on Lower Guide Wall"; small view including people |
17 |
10 |
0 |
Kentucky River |
Lock No. 10 |
5/6/1923 |
"Broken corner of the Gate recess"; No. 454 small view of gate showing leakage |
17 |
10 |
0 |
Kentucky River |
Lock No. 10 |
5/10/1923 |
"Rust on Upper Gate"; No. 455; small view of gate |
17 |
10 |
0 |
Kentucky River |
Lock No. 10 |
5/21/1923 |
"Rust on Upper Gate"; No. 456; small view of gate |
17 |
10 |
0 |
Kentucky River |
Lock No. 10 |
5/21/1923 |
"Head-bay Dam before stopping leaks"; No. 457; small view of leaking dam, including people |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
7/19/1923 |
"Lower Guide Wall under construction"; No. 458; small view including person |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
7/26/1923 |
"Lower Guide Wall completed"; No. 459; small view |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
7/31/1923 |
"Head-bay Dam in place"; No. 460; small view |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
7/31/1923 |
"Corrosion of Upper Gate"; small view |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
7/31/1923 |
"Corrosion of Upper Gate - Repair of Valves"; No. 462; small view |
17 |
10 |
0 |
Kentucky River |
Lock No. 10 |
8/19/1923 |
"Boonesboro Hotel and Dancing Pavilion"; No. 463; small view including buildings and cars |
17 |
1 |
0 |
Kentucky River |
Dam No. 1 |
8/22/1923 |
"Damaged Apron and Slope"; small view |
17 |
0 |
0 |
Dix River |
Dix River Project |
8/24/1923 |
"Dix River Project - Lower end; Timber cut in the stream"; No. 466; small view |
17 |
0 |
0 |
Dix River |
Dix River Project |
8/24/1923 |
"Dix River Project - Upper end; Timber cut into the stream"; No. 465; small view |
17 |
0 |
0 |
Camp Nelson, KY |
Fortification |
8/24/1923 |
"Old Civil War Fortification"; No. 467; small view |
17 |
1 |
0 |
Kentucky River |
Dam No. 1 |
9/10/1923 |
"Break in the Lower Slope"; No. 468; small view |
17 |
3 |
0 |
Kentucky River |
Lock No. 3 |
9/25/1923 |
"Mounting new Upper Gate"; No. 469; small view including people and workboats |
17 |
3 |
0 |
Kentucky River |
Lock No. 3 |
9/25/1923 |
"New Upper Gate mounted"; No. 470; small view of gate |
17 |
12 |
0 |
Kentucky River |
Dam No. 12 |
10/9/1923 |
"Mounting Steel "A" Frame Crest"; No. 471; small view of dam, including workboats and barge |
17 |
4 |
0 |
Kentucky River |
Lock No. 4 |
10/10/1923 |
"Pulling out the Str "Advance""; No. 472; small view of workboat |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
10/30/1923 |
"Steel A-Frame Crest Mounted"; No. 473; small view of dam, including person and workboat |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
10/30/1923 |
"Steel A-Frame Crest Mounted"; No. 474; small view of dam, including people and barge |
17 |
0 |
0 |
Dix River |
Misc |
10/21/1923 |
"Cut off Wall being Concreted"; No. 475; small view |
17 |
4 |
0 |
Lock No. 4 |
Steamer |
10/10/1923 |
"Pulling out the Str "Advance""; No. 476; small view of workboat |
17 |
13 |
0 |
Kentucky River |
Lock No. 13 |
11/28/1923 |
"Steel A-Frame Crest Mounted"; No. 477; small view of dam including people, barge and building |
17 |
13 |
0 |
Kentucky River |
Lock No. 13 |
11/29/1923 |
"Steel A-Frame Crest Mounted"; No. 478; small view of dam, including people, barge and buildings |
17 |
0 |
0 |
Frankfort, KY |
Flood |
1/4/1924 |
"Flood stage in Mero St. - 3440"; No. 479; small view of street during flood, including car, person and buildings lining a street |
17 |
4 |
0 |
Lock No. 4 |
Workboat |
1/4/1924 |
""Carrollton" on Ways during flood"; No. 480; small view including workboat, car and person |
17 |
14 |
0 |
Lock No. 14 |
Rip-Rap |
2/29/1924 |
"Completing Rip-Rap"; No. 481; small view of workboat, with bridge and water tower visible in corner |
17 |
7 |
0 |
Lock No. 7 |
Lock Wall |
5/4/1924 |
"Condition of Lock Wall"; No. 482; small view |
17 |
7 |
0 |
Lock No. 7 |
Lock Wall |
5/14/1924 |
"Restoring Lock Walls to normal section"; No. 483; small view of men at work on lock wall |
17 |
0 |
0 |
Beattyville, KY |
Bridge |
5/17/1924 |
"Concrete at Corroded joints of Bridge across Stufflebean Creek"; No. 484; small view of bridge with people on it and buildings on opposite side |
17 |
0 |
0 |
Beattyville, KY |
Bridge |
5/17/1924 |
"Upper Bridge across Stufflebean Creek"; No. 485; small view of metal beams, creek, and building in background |
17 |
0 |
0 |
Beattyville, KY |
Bridge |
5/17/1924 |
"Bridge across Stufflebean Creek"; small view of bridge, with buildings visible in background |
17 |
4 |
0 |
Kentucky River |
Lock No. 4 |
6/3/1924 |
"Force building "Kentucky""; No. 487; small view of group posing |
17 |
4 |
0 |
Kentucky River |
Lock No. 4 |
6/3/1924 |
"Snagboat "Kentucky" on Marine Ways"; No. 488; small view of workboat with barge and other boats in background |
17 |
4 |
0 |
Kentucky River |
Lock No. 4 |
6/5/1924 |
"Snagboat "Kentucky" on Marine Ways"; No. 489; small view of workboat |
17 |
0 |
0 |
Fairview, KY |
Jeff Davis Monument |
6/7/1924 |
"Jeff Davis Monument"; No. 490; small view of obelisk with people and cars around it |
17 |
0 |
0 |
Fairview, KY |
Jeff Davis Monument |
6/7/1924 |
"Jeff Davis Monument"; No. 491; small view of cars and people around obelisk in background |
17 |
0 |
0 |
Dix River |
Dix River Dam |
6/20/1924 |
"The 9,000 Yard Shot"; No. 492; small view of rock wall |
17 |
7 |
0 |
Lock No. 7 |
Land Wall |
7/1/1924 |
"Land Wall restored to section"; No. 493; small dark view |
17 |
2 |
0 |
Lock No. 2 |
Old Upper Gate |
7/18/1924 |
"Old Upper Gate; Land Leaf"; No. 494; small view of old gate removed and being lifted, with people in shot and ship in background |
17 |
2 |
0 |
Lock No. 2 |
Old Upper Gate |
7/28/1924 |
"Old Upper Gate"; No. 495; small view including man |
17 |
2 |
0 |
Lock No. 2 |
New Upper Gate |
7/29/1924 |
"New Upper Gate; River Wall Leaf"; No. 496; small view including barge and people |
17 |
8 |
0 |
Lock No. 8 |
River Wall |
8/8/1924 |
"River Wall - "Gunite" filling to original section"; No. 497; small view of river wall |
17 |
8 |
0 |
Lock No. 8 |
River Wall |
8/8/1924 |
"River Wall - "Gunite" filling to original section"; No. 498; small view of river wall including barge and workers |
17 |
8 |
0 |
Lock No. 8 |
River Wall |
8/8/1924 |
"Cement Gun at work on the River Wall"; No. 499; small view of river wall, including workers and barge |
17 |
8 |
0 |
Lock No. 8 |
Land Wall |
8/8/1924 |
"Land Wall. The "Gunite" appears rough but is actually very smooth"; No. 500; small view of land wall |
17 |
0 |
0 |
Dix River |
Pool No. 7 - Bridge |
8/8/1924 |
"Highway Bridge over Dix River near Danville"; No. 501; small view of bridge during construction process, including workers |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
8/30/1924 |
"Condition of the Abutment"; No. 502; small view of abutment taken from river, with tent and small building in background |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
8/30/1924 |
"Condition of the Upper Guide Wall"; No. 503; close view of wall |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
9/9/1924 |
"Condition of the Upper Guide Wall"; No. 504; close view of wall |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
9/9/1924 |
"Condition of the Upper Guide Pier"; No. 505; small view of pier |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
9/9/1924 |
"Excavation for the Upper Guide Wall"; No. 506; small view of construction |
17 |
0 |
0 |
Harrodsburg, Kentucky |
Cemetery |
9/10/1924 |
"Oldest Cemetery in the State"; No. 507; small view of headstones |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
9/15/1924 |
"Upper Guide Wall - Driving the Last Pile"; No. 508; small view of construction |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
9/30/1924 |
"Repairs to the Abutment Completed"; No. 509; small view of abutment |
17 |
0 |
0 |
Millers Creek |
Furnace |
10/9/1924 |
"Fitchburg Furnace, 40' x 60' - 50' high"; No. 510; small view of furnace |
17 |
0 |
0 |
Hardwick Creek |
Furnace |
10/9/1924 |
"Estill Furnace"; No. 511; small view of furnace |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
10/14/1924 |
"Top Timbers mounted on 3 gate leaves"; No. 512; small view of barge and workers |
17 |
0 |
0 |
Shelby County, TN |
Dutch Oven |
10/15/1924 |
"Dutch Oven on road to Bagdad"; No. 513; close view of ovens |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
10/15/1924 |
"Driving last pile in Triangular Crib"; No. 514; small view of construction |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
10/15/1924 |
"Upper Guide Wall Completed"; No. 515; small view of wall |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
11/5/1924 |
"Upper Guide Wall and Slope"; No. 516; small view of wall |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
10/27/1924 |
"Foundation of Guide Wall"; No. 517; small view of wall |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
11/5/1924 |
"Guide Wall and Pier Completed"; No. 518; small view of wall and pier |
17 |
3 |
0 |
Kentucky River |
Lock No. 3 |
11/19/1924 |
"Upper Guard Wall Footing completed"; No. 519; small view of wall |
17 |
3 |
0 |
Kentucky River |
Lock No. 3 |
11/25/1924 |
"Lock No. 3 and Monterey"; No. 520; distant view of river and land |
17 |
3 |
0 |
Kentucky River |
Lock No. 3 |
11/25/1924 |
"Upper Guard Wall completed"; No. 521; small view of wall |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
12/1/1924 |
"Mounting diagonal strap on lower gate"; No. 522; small view of construction |
17 |
0 |
0 |
Ohio River |
Towboat |
|
"Tow Boat Gregory sunk December 1924, Ohio River"; small view of boat sinking |
17 |
0 |
0 |
Ohio River |
Towboat |
|
"Tow Boat Gregory sunk December 1924, Ohio River"; small view of boat sinking |
17 |
0 |
0 |
Ohio River |
Towboat |
|
"Tow Boat Gregory sunk December 1924, Ohio River"; small view of boat sinking |
17 |
10 |
0 |
Kentucky River |
Lock No. 10 |
12/15/1924 |
"Upper Pile Cluster after flood"; No. 523; small view of piles |
17 |
11 |
0 |
Kentucky River |
Lock No. 11 |
2/13/1925 |
"Sandblasting Upper gate"; No. 524; close view of construction |
17 |
11 |
0 |
Kentucky River |
Lock No. 11 |
2/13/1925 |
"Head -bay Dam"; No. 525; close view of dam |
17 |
11 |
0 |
Kentucky River |
Lock No. 11 |
2/27/1925 |
"Head -bay Dam"; No. 526; close view of dam |
17 |
11 |
0 |
Kentucky River |
Lock No. 11 |
2/27/1925 |
"Head-bay, valve repair, sandblast gate"; No. 527; close view of dam |
17 |
10 |
0 |
Kentucky River |
Lock No. 10 |
3/9/1925 |
"Valve repair, gate sandblasted, and painted"; No. 528; close view of dam |
17 |
10 |
0 |
Kentucky River |
Lock No. 10 |
3/11/1925 |
"First Burial Ground in the state"; No. 529; small view of tombstones |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
3/16/1925 |
"Upper gate dismounted by 1. W. W. Barge No. 35, Lifted March 16, at 12:30 am, in place March 16, 11:15 am"; No. 530; close view of damage |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
3/16/1925 |
"Upper gate dismounted 15 inches at heel, 7.2 feet at toe"; No. 531; close view of damage |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
3/16/1925 |
"The Spring line and fastening - which failed to hold" No. 532; close view of damage |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
3/16/1925 |
"The Spring line and fastening - which failed to hold" No. 533; close view of damage |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
3/16/1925 |
"The Spring properly fastened" No. 534; close view of damage |
17 |
0 |
0 |
Dix River Dam |
Dam |
3/24/1925 |
"View of Upstream face, Water 101.5 feet deep"; No. 535; small view of dam |
17 |
0 |
0 |
Dix River Dam |
Dam |
3/24/1925 |
"View of Upstream face, Water 101.5 feet deep"; No. 536; small view of dam |
17 |
0 |
0 |
Dix River Dam |
Spillway |
3/24/1925 |
"The Spillway"; No. 537; small view of construction |
17 |
0 |
0 |
Dix River Dam |
Power house |
3/24/1925 |
"Power House, Dix Dam"; No. 538; small view of power house |
17 |
0 |
0 |
Dix River |
Bridge |
3/24/1925 |
"Bridge on the Danville Road"; No. 539; small view of bridge |
17 |
4 |
0 |
Kentucky River |
Lock No. 4 |
4/15/1925 |
"Mounting New Gate"; No. 540; small view of construction |
17 |
4 |
0 |
Kentucky River |
Lock No. 4 |
4/15/1925 |
"Heel of old Lower Gate Leaf"; No. 541; close view of gate |
17 |
0 |
0 |
Dix River |
Spillway |
5/6/1925 |
"Spillway, Dix Dam"; No. 542; small view of construction |
17 |
0 |
0 |
Dix River |
Dam |
5/6/1925 |
"Upper Slope Dix Dam - 131 ft of water"; No. 543; small view of dam |
17 |
0 |
0 |
Dix River |
Bridge |
5/6/1925 |
"Bridge on the Buena Vista Road"; No. 544; small view of bridge |
17 |
0 |
0 |
Dix River |
Bridge |
5/6/1925 |
"View from the Buena Vista Bridge"; No. 545; distant view of surrounding land and river |
17 |
0 |
0 |
Camp Nelson Bridge |
Pool No. 7 |
5/6/1925 |
"Camp Nelson Bridge - Built by Wernweg in 1837"; No. 546; small view of bridge |
17 |
0 |
0 |
Kentucky River |
Pool No. 9 |
6/11/1925 |
"Great kentucky River fault near Clays Ferry"; No. 547; distant view of land |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
6/11/1925 |
"Upper Guide Pile Clusters"; No. 548; close view of construction |
17 |
0 |
0 |
Clays Ferry |
Pool No. 9 |
6/17/1925 |
"Clays Ferry, or Cleveland"; No. 549; distant view of river and land |
17 |
0 |
0 |
Dix Dam |
Spillway |
6/19/1925 |
"Mouth of 65 ft. pit, upper end of spillway"; No. 550; close view of pit |
17 |
0 |
0 |
Dix River |
Bridge |
6/19/1925 |
"Bridge on Danville - Dick Robinson Road"; No. 551; small view of bridge |
17 |
0 |
0 |
various |
various |
|
7 untitled pictures, showing boats and men |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
8/11/1925 |
"Close Piles outside of abutment"; No. 557; close view of piles |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
8/11/1925 |
"Close Piles outside of abutment"; No. 558; close view of piles |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
8/21/1925 |
"Excavation for certain wall of abutment"; No. 559; close view of construction |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
8/18/1925 |
"Forms for first section of Curtain Wall of abutment"; No. 560; close view of site |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
8/19/1925 |
"Digging drift over the dam"; No. 561; small view of construction |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
8/22/1925 |
"Second section of abutment curtain wall"; No. 562; close view of construction |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
8/22/1925 |
"Second section of abutment curtain wall"; No. 563; close view of construction |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
8/27/1925 |
"Abutment curtain wall completed"; No. 564; close view of construction |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
8/31/1925 |
"Excavation for the first section of abutment at end of dam"; No. 565; close view of construction |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
9/3/1925 |
"Apron of dam"; No. 566; small view of dam |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
9/15/1925 |
"Old walls below the dam"; No. 567; close view of walls |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
9/15/1925 |
"Second section of main abutment completed"; No. 568; close view of construction |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
9/15/1925 |
"Excavatin for third section of the abutment"; No. 569; close view of construction |
17 |
0 |
0 |
Licking River |
Farmers, KY |
9/25/1925 |
"Looking Down main channel, toward mill, Licking River at Farmers, KY"; No. 570; small view of river |
17 |
0 |
0 |
Licking River |
Farmers, KY |
9/25/1925 |
"Looking down the cut-off boom and dam in foreground"; No. 571; small view of river |
17 |
0 |
0 |
Licking River |
Farmers, KY |
9/25/1925 |
"Looking up the cut-off, toward the dam"; No. 572; small view of river |
17 |
0 |
0 |
Licking River |
Farmers, KY |
9/25/1925 |
"View of main stream channel"; No. 573; small view of channel |
17 |
1 |
0 |
Kentucky River |
Dam |
9/18/1925 |
"Abutment wall above the dam completed"; No. 574; close view of wall |
17 |
1 |
0 |
Kentucky River |
Dam |
9/25/1925 |
"Abutment wall above the dam"; No. 575; close view of wall |
17 |
1 |
0 |
Kentucky River |
Dam |
9/30/1925 |
"Abutment wall below the dam"; No. 576; close view of wall |
17 |
1 |
0 |
Kentucky River |
Dam |
9/30/1925 |
"Abutment completed"; No. 577; small view of abutment |
17 |
1 |
0 |
Kentucky River |
Dam |
10/10/1925 |
"Abutment completed"; No. 578; small view of abutment |
17 |
1 |
0 |
Kentucky River |
Dam |
10/10/1925 |
"Dam raised to normal height"; No. 579; close view of dam |
17 |
9 |
0 |
Kentucky River |
Dam |
10/27/1925 |
"Lower Guide Wall Crib"; No. 580; close view of construction |
17 |
9 |
0 |
Kentucky River |
Dam |
11/2/1925 |
"Auxiliary Dam"; No. 581; close vew of dam |
17 |
9 |
0 |
Kentucky River |
Dam |
11/25/1925 |
"Lower Guide Wall foundation; No. 583; small view of construction |
17 |
9 |
0 |
Kentucky River |
Dam |
11/25/1925 |
"Screen from the upper wall valve"; No. 582; close view of screen |
17 |
9 |
0 |
Kentucky River |
Dam |
11/25/1925 |
"Lower Guide Wall"; No. 584; small view of site |
17 |
9 |
0 |
Kentucky River |
Dam |
12/8/1925 |
"Lower Guide Wall"; No. 585; small view of site |
17 |
9 |
0 |
Kentucky River |
Dam |
12/23/1925 |
"Lower Guide Wall completed"; No. 586; small view of site |
17 |
9 |
0 |
Kentucky River |
Dam |
3/10/1926 |
"Completed Lower Guide Wall"; No. 587; close view of wall |
17 |
0 |
0 |
Frankfort, KY |
Towboat |
2/18/1926 |
"Diesel Towboat Kosmortar"; No. 588; small view of boat |
17 |
0 |
0 |
Kentucky River |
Pool No. 10 |
4/15/1926 |
"L. and N. R. R. Bridge coffer and piles - right bank"; No. 589; close view of piles |
17 |
0 |
0 |
Kentucky River |
Pool No. 10 |
4/15/1926 |
"L. and N. R. R. Bridge, Ford, Ky - pier on left bank"; No. 590; small view of construction |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
4/19/1926 |
"Lower land leaf of gate dismounted"; No. 591; small view of work |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
4/20/1926 |
"Sandblasting land leaf of lower gate"; No. 592, close view of workers |
17 |
0 |
0 |
Frankfort, KY |
Towboat |
4/30/1926 |
"Kosmortar and ton of 8,000 bbls of fuel oil"; No. 593; small view of boat |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
4/20/1926 |
"Remounting the lower gate"; No. 594; small view of construction |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
4/20/1926 |
"Sandblasting and painting No. 14 gate"; No. 595; small view of construction |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
4/26/1926 |
"Consition of lower river leaf, just dismounted"; No. 596; small view of site |
17 |
13 |
0 |
Kentucky River |
Lock No. 13 |
5/10/1926 |
"Sandblasting and painting lower gate"; No. 597; small view of site |
17 |
0 |
0 |
Ford, KY |
Bridge |
5/13/1926 |
"Foundation L&N Bridge - Right bank"; No. 598; close view of site |
17 |
6 |
0 |
Kentucky River |
Lock No. 6 |
6/16/1926 |
"Cutting 1/4" from miter end of No. 6 - lower river leaf"; No. 599; small view of site |
17 |
6 |
0 |
Kentucky River |
Lock No. 6 |
6/13/1926 |
"Mounting River Leaf, No. 6 lower gate"; No. 600; small view of site |
17 |
4 |
0 |
Kentucky River |
Lock No. 4 |
6/21/1926 |
"U. S. Burnett on the ways"; No. 601; small view of boat |
17 |
4 |
0 |
Kentucky River |
Lock No. 4 |
6/21/1926 |
"U. S. Burnett on the ways"; No. 602; small view of boat |
17 |
5 |
0 |
Kentucky River |
Lock No. 5 |
6/28/1926 |
"Land leaf of Upper Gate dismounted"; No. 603; close view of site |
17 |
5 |
0 |
Kentucky River |
Lock No. 5 |
6/28/1926 |
"Land leaf of Upper Gate showing condition of valves"; No. 604; close view of leaf |
17 |
5 |
0 |
Kentucky River |
Lock No. 5 |
6/28/1926 |
"Corrosion of land leaf of upper gate"; No. 605; close view of leaf |
17 |
5 |
0 |
Kentucky River |
Lock No. 5 |
7/2/1926 |
"Remounting land leaf of upper gate sandblasted, painted and valves repaired"; No. 606; close view of leaf |
17 |
5 |
0 |
Kentucky River |
Lock No. 5 |
7/6/1926 |
"Condition of upper river leaf, valves and rust"; No. 607; close view of leaf |
17 |
5 |
0 |
Kentucky River |
Lock No. 5 |
7/6/1926 |
"Upper river leaf dismounted for painting"; No/ 608; close view of leaf |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
7/20/1926 |
"Lower head bay pumped out"; No/ 609; small view of site |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
7/22/1926 |
"Condition of lower miter sill"; No. 610; close view of site |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
7/22/1926 |
"Splintered lower miter sill"; No. 611; close view of site |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
7/23/1926 |
"Lower Miter Sill and gate"; No. 612; small view of site |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
7/23/1926 |
"Upper end of lock, unwatered"; No. 613; small view of lock |
17 |
0 |
0 |
Frankfort, KY |
Boat |
8/7/1926 |
"The Burnett"; No. 614; small view of boat |
17 |
0 |
0 |
Frankfort, KY |
Boat |
8/7/1926 |
"The Burnett"; No. 615; small view of boat |
17 |
0 |
0 |
Frankfort, KY |
Boat |
8/7/1926 |
"The wheel of the Burnett"; No. 616; small view of boat |
17 |
0 |
0 |
Frankfort, KY |
Boat |
8/7/1926 |
"The wheel of the Burnett"; No. 617; small view of boat |
17 |
5 |
0 |
Kentucky River |
Lock No. 5 |
8/17/1926 |
"Construction of saddle on dam"; No. 618; small view of site |
17 |
5 |
0 |
Kentucky River |
Lock No. 5 |
9/20/1926 |
"170 ft. of saddle completed"; No. 619; small view of site |
17 |
5 |
0 |
Kentucky River |
Lock No. 5 |
9/24/1926 |
"270 ft. of saddle completed"; No. 620; small view of site and workers |
17 |
5 |
0 |
Kentucky River |
Lock No. 5 |
10/12/1926 |
"316 ft. of saddle completed"; No. 621; small view of site |
17 |
0 |
0 |
Kentucky River |
Bridge and Pool No. 6 |
9/8/1926 |
"View at Brooklyn Bridge"; No. 622; distant view of river and land |
17 |
0 |
0 |
Kentucky River |
Pool No. 7 |
10/7/1926 |
"View at Camp Hudson"; No. 623; distant view of land |
17 |
0 |
0 |
Kentucky River |
Pool No. 7 |
10/7/1926 |
"View of the Candle Stick"; No. 624; distant view of land |
17 |
0 |
0 |
Frankfort, KY |
Major Powell |
10/7/1926 |
"Major Powell's party"; No. 625; close view of party goers |
17 |
0 |
0 |
Frankfort, KY |
Tipton |
10/21/1926 |
"Foreman M. B. Tipton"; No. 626; photo of foreman |
17 |
0 |
0 |
Kentucky River |
Dam No. 5 |
10/21/1926 |
"358' of dam saddle completed"; No. 627; small view of saddle |
17 |
8 |
0 |
Kentucky River |
Lock No. 8 |
11/1/1926 |
"New top logs on gates"; No. 628; small view of ship and gate |
17 |
5 |
0 |
Kentucky River |
Lock No. 5 |
11/5/1926 |
"Alleged damage to Mrs. Sheltons farm by dredging"; No. 629; distant view of land |
17 |
0 |
0 |
Licking River |
River |
12/4/1926 |
"Erosion caused by partially filling river bed"; No. 630; small view of river |
17 |
0 |
0 |
Licking River |
River near Sadyersville |
12/4/1926 |
"Erosion caused by partially filling Licking river bed"; No. 631; small view of river |
17 |
0 |
0 |
Licking River |
River near Sadyersville |
12/4/1926 |
"Constructing Licking River by grading a highway"; No. 632; close view of river |
17 |
0 |
0 |
Licking River |
River near Sadyersville |
12/4/1926 |
"Scour caused by rock in Licking River"; No. 633; close view of river |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
2/11/1927 |
"Finishing the Cofferdam"; No. 634; small view of site |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
2/11/1927 |
"Excavating for new miter sill"; No. 635; small view of site |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
2/17/1927 |
"New miter sill in place"; No. 636; small view of site |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
2/17/1927 |
"New miter sill in place"; No. 637; small view of site |
17 |
0 |
0 |
Frankfort, KY |
Bridge |
2/18/1927 |
"St. Clair St. Bridge"; No. 638; small view of bridge |
17 |
10 |
0 |
Kentucky River |
Lock No. 10 |
2/11/1927 |
"Boat crews, lockmen, etc"; No. 639; small view of construction men |
17 |
10 |
0 |
Kentucky River |
Lock No. 10 |
2/11/1927 |
"Navigation opened"; No. 640; small view of site |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
3/8/1927 |
"Lower gate"; No. 641; small view of gate |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
3/23/1927 |
"Lower gate - bent miter sill"; No. 642; close view of gate |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
3/30/1927 |
"Land leaf, lower gate, dismounted"; No. 643; close view of gate |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
3/30/1927 |
"Land leaf, lower gate, on barge"; No. 644; close view of gate |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
4/8/1927 |
"Lower gate"; No. 645; close view of gate and workers |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
4/8/1927 |
"Lower gate, lying flat"; No. 646; close view of gate |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
4/8/1927 |
"Lower gate, lying flat"; No. 647; close view of gate |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
4/11/1927 |
"Straightening bent miter post"; No. 648; close view of post |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
4/11/1927 |
"Straightening bent miter post"; No. 649; close view of post |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
4/11/1927 |
"Some of the steel workers"; No. 650; small view of men |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
4/22/1927 |
"Repaired lower gate, showing 2 extra diagonals"; No. 651; close view of gate |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
4/22/1927 |
"Repaired lower gate, showing absence of twists"; No. 652; close view of gate |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
4/29/1927 |
"Remounting the lower gate"; No. 653; small view of gate |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
4/29/1927 |
"Lower gate remounted"; No. 654; small view of gate |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
5/1/1927 |
"New Lower gate completed"; No. 655; small view of gate |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
6/5/1927 |
"Drift gorge"; small view of river |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
6/5/1927 |
"Drift gorge"; small view of river |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
6/5/1927 |
"Drift gorge"; small view of river |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
6/5/1927 |
"Drift gorge"; small view of river |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
6/5/1927 |
"Drift gorge removed"; small view of river |
17 |
11 |
0 |
Kentucky River |
Lock No. 11 |
5/17/1927 |
"Paving damaged by flood"; No. 656; small view of road |
17 |
11 |
0 |
Kentucky River |
Lock No. 11 |
5/21/1927 |
"Repairing undermined paving"; No. 657; small view of work |
17 |
11 |
0 |
Kentucky River |
Lock No. 11 |
5/21/1927 |
"Laying concrete paving"; No. 658; small view of work |
17 |
11 |
0 |
Kentucky River |
Lock No. 11 |
6/8/1927 |
"Pavement repairs completed"; No. 659; small view of road |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
6/13/1927 |
"Fastenings of river leaf, lower gate"; No. 660; close view of leaf |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
6/13/1927 |
"Land Leaf, lower gate, dismounted by the flood"; No. 661; small view of gate |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
6/13/1927 |
"Land Leaf, lower gate, dismounted by the flood"; No. 662; small view of gate |
17 |
4 |
0 |
Kentucky River |
Lock No. 4 |
6/15/1927 |
"Snagboat Kentucky on marine Ways"; No. 663; small view of boat |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
6/15/1927 |
"Gate leaf, moved to pass derrick boat"; No. 664; close view of gate |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
6/25/1927 |
"Land leaf lower gate, hoisted"; No. 665; close view of gate |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
6/25/1927 |
"Land leaf lower gate, on barge"; No. 666; close view of gate |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
6/25/1927 |
"Land leaf lower gate, break of bottom girder"; No. 667; close view of gate |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
6/25/1927 |
"Land leaf lower gate, break of bottom girder"; No. 668; close view of gate |
17 |
7 |
0 |
Kentucky River |
Lock No. 7 |
6/29/1927 |
"Project No. 539, material yard"; No. 669; small view of yard and family |
17 |
7 |
0 |
Kentucky River |
Lock No. 7 |
6/29/1927 |
"Project No. 539, upper arm of Coffer"; No. 670; small view of site |
17 |
7 |
0 |
Kentucky River |
Lock No. 7 |
6/29/1927 |
"Project No. 539, Coffer and plant"; No. 671; small view of site |
17 |
7 |
0 |
Kentucky River |
Lock No. 7 |
6/29/1927 |
"Project No. 539, Coffer Dam"; No. 672; small view of site |
17 |
7 |
0 |
Kentucky River |
Lock No. 7 |
6/29/1927 |
"Project No. 539, Coffer Dam and plant"; No. 673; small view of site |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
7/21/1927 |
"Lifting land leaf, lower gate"; No. 674; small view of gate |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
7/21/1927 |
"Mounting land leaf, lower gate"; No. 675; small view of gate |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
7/23/1927 |
"Drift on the dam"; No. 676; close view of dam |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
7/23/1927 |
"Condition of miter sill"; No. 677; close view of sill |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
7/23/1927 |
"Condition of miter sill"; No. 678; close view of sill |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
7/23/1927 |
"Condition of miter sill"; No. 679; close view of sill |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
7/23/1927 |
"Condition of miter sill"; No. 680; close view of sill |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
7/23/1927 |
"Miter sill - timbers removed"; No. 681; small view of sill |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
7/23/1927 |
"Miter sill - timbers removed"; No. 682; small view of sill |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
7/23/1927 |
"Lower miter sill - timbers removed"; No. 683; close view of sill |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
7/23/1927 |
"Lower miter sill - timbers removed"; No. 684; close view of sill |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
7/27/1927 |
"Erosion of concrete at land-wall valve"; No. 685; close view of wall |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
7/27/1927 |
"Erosion of concrete atriver-wall valve"; No. 686; close view of wall |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
7/27/1927 |
"Mounting new wood cushion timbers"; No. 687; small view of site |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
8/1/1927 |
"Lower miter sill - placing last concrete"; No. 688; small view of site |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
8/1/1927 |
"Concrete plant"; No. 689; small view of plant |
17 |
0 |
0 |
Pine Ridge |
Road |
8/2/1927 |
"Scene on road to Beattyville"; No. 690; distant view of land |
17 |
0 |
0 |
Clay's Ferry |
Pool No. 9 |
8/1/1927 |
"Scene at Clay's Ferry"; No. 691; distant view of land |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
8/2/1927 |
"Drift on the dam"; No. 692; close view of dam |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
8/2/1927 |
"The lockmaster's hen-house"; No. 693; close view of house |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
8/2/1927 |
"First lockmaster's hen-house"; No. 694; close view of house |
17 |
12 |
0 |
Kentucky River |
Lock No. 12 |
8/2/1927 |
"Second lockmaster's hen-house"; No. 695; close view of house |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
8/6/1927 |
"Repairing the river leaf, lower gate"; No. 696; small view of workers |
17 |
14 |
0 |
Kentucky River |
Lock No. 14 |
8/16/1927 |
"The river leaf of lower gate mounted"; No. 697; close view of gate |
17 |
0 |
0 |
Irvine |
Cow Creek |
8/17/1927 |
"View of Cow Creek"; No. 698; distant view of land |
17 |
0 |
0 |
Licking River |
S. D. May |
8/19/1927 |
"General view of bank, rip-rap, and erosion at S.. D. May's"; No. 699; small view of river |
17 |
0 |
0 |
Licking River |
S. D. May |
8/19/1927 |
"Rip-rap and channel at S. D. May's"; No. 700; small view of river |
17 |
0 |
0 |
Licking River |
S. D. May |
8/19/1927 |
"Slope of road at S. D. May's"; No. 701; small view of river |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
9/3/1927 |
"Coffer for repairing lower wall valves"; No. 702; close view of coffer |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
9/15/1927 |
"Repairing lower land-wall valve"; No. 703; small view of workers |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
9/18/1927 |
"Repairing lower river-wall valve"; No. 704; small view of work |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
9/18/1927 |
"The Kentucky pumping the coffer"; No. 705; small view of work |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
9/16/1927 |
"Spider in the land-wall lower valve"; No. 706; close view of work |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
9/18/1927 |
"Spider in the river-wall lower valve"; No. 707; close view of work |
17 |
0 |
0 |
Camp Nelson |
Bridge |
9/23/1927 |
"Interior of L. W. Wernwag bridge"; No. 708; small view of bridge |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
9/23/1927 |
"Drift on the dam"; No. 709; close view of dam |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
9/23/1927 |
"Laying concrete in lower guard wall"; No. 710; small view of site |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
9/28/1927 |
"First course of concrete laid in lower guard wall"; No. 711; small view of work |
17 |
7 |
0 |
Kentucky River |
Lock No. 7 |
9/29/1927 |
"View of hydro-electric project, No. 539"; No. 712; small view of construction |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/1/1927 |
"Placing concrete in lower guard wall", No. 713; small view of site |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/1/1927 |
"Miter sill coffer, river wall side"; No. 714; close view of site |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/5/1927 |
"Miter sill coffer, excavation completed"; No. 715; small view of site |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/5/1927 |
"Lower guard wall"; No. 716; small view of site |
17 |
7 |
0 |
Kentucky River |
Lock No. 7 |
10/5/1927 |
"Lateral wall - power station"; No. 717; small view of site |
17 |
7 |
0 |
Kentucky River |
Lock No. 7 |
10/23/1927 |
"Project No. 539 - trash rack supports"; No. 717-A; small view of site |
17 |
7 |
0 |
Kentucky River |
Lock No. 7 |
10/26/1927 |
"Project No. 539 - removing coffer dam"; No. 718; small view of site |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/20/1927 |
"Miter sill coffer, land wall side"; No. 719; small view of site |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/21/1927 |
"Miter sill coffer, land wall side"; No. 720; small view of site |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/21/1927 |
"Excavating mitre-wall top"; No. 721; close view of site |
17 |
10 |
0 |
Kentucky River |
Lock No. 10 |
10/31/1927 |
"Repairing upper valves"; No. 722; close view of site |
17 |
10 |
0 |
Kentucky River |
Lock No. 10 |
10/31/1927 |
"Head-bay dam"; No. 723; small view of dam |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
11/1/1927 |
"The completed lower guard wall"; No. 724; small view of wall |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
11/1/1927 |
"Excavating the upper guide area"; No. 725; small view of site |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
11/1/1927 |
"Excavating the upper guide crib"; No. 726; small view of site |
17 |
9 |
0 |
Kentucky River |
Lock No. 9 |
11/12/1927 |
"Upper guide crib completed"; No. 727; small view of site |
17 |
7 |
0 |
Kentucky River |
Lock No. 7 |
11/15/1927 |
"Falsework - Camp Nelson bridge"; No. 728; small view of bridge |
17 |
0 |
0 |
Kentucky River |
Pool No. 7 |
11/15/1927 |
"Falsework - Camp Nelson bridge - out Dec 2"; No. 729; small view of bridge |
17 |
7 |
0 |
Kentucky River |
Lock No. 7 |
11/10/1927 |
"Project No. 539 - coffer removed"; No. 730; small view of site |
17 |
7 |
0 |
Kentucky River |
Lock No. 7 |
11/20/1927 |
"Project No. 539 - lateral wall and powerhouse piers"; No. 731; small view of site |
17 |
7 |
0 |
Kentucky River |
Lock No. 7 |
11/21/1927 |
"Project 539 - Piers at floor level"; No. 732; distant view of site |
17 |
7 |
0 |
Kentucky River |
Lock No. 7 |
11/21/1927 |
"General view"; No. 733; distant view of site |
17 |
0 |
0 |
Kentucky River |
Pool No. 7 |
12/1/1927 |
"Dredge Carrollton in Dix River"; No. 734; small view of boat |
17 |
0 |
0 |
Kentucky River |
Pool No. 7 |
12/1/1927 |
"Dredge Carrollton in Dix River"; No. 735; small view of boat |
17 |
0 |
0 |
Kentucky River |
Pool No. 7 |
12/1/1927 |
"Bar in Dix River at Dix Dam spillway"; No. 736; small view of site |
17 |
0 |
0 |
Kentucky River |
Pool No. 7 |
12/30/1927 |
"Bar at Dix Dam partly removed"; No. 737; small view of site |
17 |
0 |
0 |
Kentucky River |
Pool No. 7 |
12/30/1927 |
"Bar at Dix Dam partly removed"; No. 738; small view of site |
17 |
0 |
0 |
Kentucky River |
Dam No. 7 |
12/30/1927 |
"Hydro-electric project 539 - P.H. Walls completed"; No. 739; small view of site |
17 |
0 |
0 |
Kentucky River |
Pool No. 7 |
1/20/1928 |
"Bar at Dix Dam completely removed"; No. 740; distant view of site |
17 |
0 |
0 |
Frankfort, KY |
River |
1/5/1928 |
"River full of ice"; No. 741; small view from bridge of river |
17 |
7 |
0 |
Kentucky River |
Lock No. 7 |
1/20/1928 |
"Power house completed"; No. 742; small view of house |
17 |
1 |
0 |
Kentucky River |
Lock No. 1 |
2/28/1928 |
"Carrollton Coal Co.'s digger sunk in lower approach"; No. 743; small view of boat sinking |
17 |
0 |
0 |
Kentucky River |
Pool No. 7 |
3/10/1928 |
"Dedication of Camp Nelson bridge"; No. 744; small view of crowds |
17 |
0 |
0 |
Lancaster, KY |
Home |
3/10/1928 |
"Old Kennedy home - where H. B. (perhaps Harriet Beecher) Stowe visited"; No. 745; small view of home |
17 |
0 |
0 |
Lancaster, KY |
Uncle Tom's Cabin |
3/10/1928 |
"Remains of "Uncle Tom's" cabin"; No. 746; close view of remains of home |
17 |
0 |
0 |
Lancaster, KY |
Uncle Tom's Cabin |
3/10/1928 |
"Uncle Tom's Cabin"; No. 747; close view of remains of home |
17 |
7 |
0 |
Kentucky River |
Lock No. 7 |
3/12/1928 |
"Hydro-electric project 539"; No. 748; small view of site |
17 |
7 |
0 |
Kentucky River |
Lock No. 7 |
3/12/1928 |
"Hydro-electric project 539"; No. 749; small view of site |
18 |
0 |
0 |
Beattyville |
South Fork |
5/8/1928 |
"Snag at South Fork; looking down on South Fork"; No. 750; small view of river |
18 |
0 |
0 |
Beattyville |
South Fork |
5/8/1928 |
"Snag at South Fork; looking up on South Fork"; No. 751; small view of river |
18 |
0 |
0 |
Beattyville |
South Fork |
5/8/1928 |
"Snag at South Fork; looking up both forks"; No. 752; small view of river |
18 |
0 |
0 |
Beattyville |
South Fork |
5/8/1928 |
"Snag at South Fork; looking upstream"; No. 753; small view of river |
18 |
0 |
0 |
Beattyville |
South Fork |
5/8/1928 |
"Snag at South Fork; looking downstream"; No. 754; small view of river |
18 |
0 |
0 |
Beattyville |
South Fork |
5/8/1928 |
"Snag at South Fork; looking downstream"; No. 755; small view of river |
18 |
1 |
0 |
Kentucky River |
Lock No. 1 |
8/3/1928 |
"River leaf of old lower gate, dismounted"; No. 756; close view of leaf |
18 |
1 |
0 |
Kentucky River |
Lock No. 1 |
8/4/1928 |
"Mounting river leaf, new lower gate"; No. 757; small view of site |
18 |
1 |
0 |
Kentucky River |
Lock No. 1 |
8/4/1928 |
"Mounting river leaf, new lower gate"; No. 758; small view of site |
18 |
1 |
0 |
Kentucky River |
Lock No. 1 |
8/4/1928 |
"Locking with 1 old and 1 new leaf"; No. 759; small view of site |
18 |
1 |
0 |
Kentucky River |
Lock No. 1 |
8/9/1928 |
"Mounting land leaf, new lower gate"; No. 760; close view of gate |
18 |
1 |
0 |
Kentucky River |
Lock No. 1 |
8/11/1928 |
"Adjusting the upper land leaf"; No. 762; small view of site |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
8/22/1928 |
"View from hill top"; No. 763; distant view of land |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
8/22/1928 |
"Old water mill on road to lock no. 8"; No. 764; small view of mill |
18 |
5 |
0 |
Kentucky River |
Lock No. 5 |
8/29/1928 |
"Coffer being banked"; No. 765; distant view of dam |
18 |
5 |
0 |
Kentucky River |
Lock No. 5 |
9/7/1928 |
"Placing concrete in 42 - ft. of saddle"; No. 766; distant view of dam |
18 |
5 |
0 |
Kentucky River |
Lock No. 5 |
9/12/1928 |
"Coffer for saddle completed"; No. 767; distant view of dam |
18 |
5 |
0 |
Kentucky River |
Lock No. 5 |
9/14/1928 |
"Laying concrete in saddle"; No. 768; distant view of site |
18 |
5 |
0 |
Kentucky River |
Lock No. 5 |
9/15/1928 |
"Saddle on dam completed"; No. 769; distant view of dam |
18 |
5 |
0 |
Kentucky River |
Lock No. 5 |
9/15/1928 |
"Leak through the dam at the abutment"; No. 770; close view of dam |
18 |
5 |
0 |
Kentucky River |
Lock No. 5 |
9/17/1928 |
"Completed saddle and cleared abutment"; No. 771; close view of dam |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
9/21/1928 |
"New spiders in upper valves - land wall"; No. 772; small view of wall |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
9/22/1928 |
"New spiders in upper valves - river wall"; No. 773; small view of wall |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
9/26/1928 |
"Kentucky pumping the box coffer"; No. 774; small view of site |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
9/27/1928 |
"Repairing lower land wall valve"; No. 775; small view of site |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
9/30/1928 |
"Repairing lower river wall valve"; No. 776; small view of site |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
10/9/1928 |
"Dismounted river leaf, lower gate"; No. 777; small view of gate |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
10/9/1928 |
"Repairing river leaf, lower gate - new valves"; No. 778; small view of gate |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
10/12/1928 |
"Mounting river leaf, lower gate"; No. 779; small view of site |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
10/12/1928 |
"Remounting river leaf, lower gate - 45 tons"; No. 780; close view of site |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
10/15/1928 |
"Dismounted land leaf, lower gate"; No. 781; small view of gate |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
10/15/1928 |
"Renewing valves and journals, land leaf, lower gate"; No. 782; close view of site |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
10/17/1928 |
"Broken pintle, land leaf, lower gate"; No. 783; close view of site |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
10/17/1928 |
"Remounting land leaf, lwer gate, 45 tons"; No. 784; small view of site |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
10/17/1928 |
"Land leaf, lower gate remounted"; No. 785; small view of site |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
10/17/1928 |
"Adjusting anchorages, land leaf, lower gate"; No. 786: close view of dam |
18 |
6 |
0 |
Kentucky River |
Lock No. 6 |
10/22/1928 |
"Dismounted land leaf, lower gate"; No. 787; small view of gate |
18 |
6 |
0 |
Kentucky River |
Lock No. 6 |
10/23/1928 |
"Land leaf remounted, - new valves & journal brasses"; No. 788; small view of site |
18 |
6 |
0 |
Kentucky River |
Lock No. 6 |
10/24/1928 |
"Dismounting river leaf, lower gate"; No. 789; small view of site |
18 |
6 |
0 |
Kentucky River |
Lock No. 6 |
10/25/1928 |
"Land leaf remounted- new valves & journal brasses"; No. 790; small view of site |
18 |
7 |
0 |
Kentucky River |
Lock No. 7 |
11/1/1928 |
"Foundation for lower guide wall"; No 791; small view of site |
18 |
7 |
0 |
Kentucky River |
Lock No. 7 |
11/9/1928 |
"Completed lower guide wall"; No. 792; small view of site |
18 |
7 |
0 |
Kentucky River |
Lock No. 7 |
11/21/1928 |
"Hydro-electric forebay full of drift"; No. 793; small view of river |
18 |
0 |
0 |
Kentucky River |
Pool No. 12 |
11/27/1928 |
"Pinnacle Rock"; No. 794; distant view of land |
18 |
0 |
0 |
Kentucky River |
Pool No. 12 |
3/4/1929 |
"Bridge blocking navigation at Evelyn"; No. 795; small view of site |
18 |
0 |
0 |
Kentucky River |
Pool No. 12 |
3/4/1929 |
"Fallen bridge blocking navigation at Evelyn"; No. 796; small view of bridge and river |
18 |
0 |
0 |
Kentucky River |
Pool No. 12 |
3/16/1929 |
"Navigation at Evelyn opened with 2 days work"; No. 797; small view of bridge and river |
18 |
3 |
0 |
Kentucky River |
Lock No. 3 |
5/15/1929 |
"Lower guard wall"; No. 798; small view of wall |
18 |
3 |
0 |
Kentucky River |
Lock No. 3 |
6/11/1929 |
"Lower guard wall foundation"; No. 799; distant view of site |
18 |
3 |
0 |
Kentucky River |
Lock No. 3 |
6/14/1929 |
"Storehouse and builders"; No. 800; close view of workers |
18 |
3 |
0 |
Kentucky River |
Lock No. 3 |
6/29/1929 |
"Lower guard wall; - last form"; No. 801; small view of site |
18 |
3 |
0 |
Kentucky River |
Lock No. 3 |
7/6/1929 |
"Lower guard wall; top course"; No. 802; small view of site |
18 |
3 |
0 |
Kentucky River |
Lock No. 3 |
7/7/1929 |
"Lower guard wall completed"; No. 803; close view of wall |
18 |
3 |
0 |
Kentucky River |
Lock No. 3 |
7/11/1929 |
"Lower guide wall foundation"; No. 804; small view of site |
18 |
3 |
0 |
Kentucky River |
Lock No. 3 |
7/23/1929 |
"Lower guide wall"; No. 805; small view of site |
18 |
3 |
0 |
Kentucky River |
Lock No. 3 |
8/2/1929 |
"Lower guide wall"; No. 806; small view of site |
18 |
3 |
0 |
Kentucky River |
Lock No. 3 |
8/2/1929 |
"Lower guide wall"; No. 807; small view of site |
18 |
3 |
0 |
Kentucky River |
Lock No. 3 |
8/7/1929 |
"Lower guide wall completed"; No. 808; small view of site |
18 |
6 |
0 |
Kentucky River |
Lock No. 6 |
8/13/1929 |
"Headbay Dam"; No. 809; small view of site |
18 |
6 |
0 |
Kentucky River |
Lock No. 6 |
8/13/1929 |
"Repairing upper valves"; No. 810; small view of site |
18 |
6 |
0 |
Kentucky River |
Lock No. 6 |
8/13/1929 |
"Upper land wall valve"; No. 811; small view of site |
18 |
6 |
0 |
Kentucky River |
Lock No. 6 |
8/15/1929 |
"Repair of valves completed"; No. 812; close view of dam |
18 |
5 |
0 |
Kentucky River |
Lock No. 5 |
9/27/1929 |
"Repairing upper gate"; No. 812(a); small view of site |
18 |
5 |
0 |
Kentucky River |
Lock No. 5 |
9/27/1929 |
"Repairing upper gate"; No. 813; small view of site |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
10/10/1929 |
"Box coffer, river leaf, lower gate"; No. 814; small view of site |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
10/10/1929 |
"Box coffer, river leaf, lower gate"; No. 815; small view of site |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
10/12/1929 |
"Leakage at upper gate"; No. 816; small view of gate |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
10/17/1929 |
"Dismounting lower gate, land leaf"; No. 817; small view of site |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
10/17/1929 |
"Coffer box, lower land sill"; No. 818; small view of site |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
10/17/1929 |
"Coffer box, lower land sill"; No. 819; small view of site |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
10/17/1929 |
"Land wall lower quoin"; No. 820; close view of wall |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
10/20/1929 |
"Land wall lower quoin"; No. 821; small view of wall |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
10/20/1929 |
"Lower slope of dam"; No. 822; small view of dam |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
10/22/1929 |
"New lower gate in operation"; No. 823; small view of gate |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
10/27/1929 |
"Steel head-bay dam"; No. 824; close view of site |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
10/31/1929 |
"Steel head-bay dam"; No. 825; close view of site |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
10/31/1929 |
"Valve repairs completed"; No. 826; close view of site |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
11/1/1929 |
"Head-bay dam removed"; No. 827; close view of work |
18 |
7 |
0 |
Kentucky River |
Lock No. 7 |
11/11/1929 |
"Steel head-bay dam"; No. 828; close view of dam |
18 |
7 |
0 |
Kentucky River |
Lock No. 7 |
11/11/1929 |
"Steel head-bay dam"; No. 829; small view of dam |
18 |
7 |
0 |
Kentucky River |
Lock No. 7 |
11/13/1929 |
"Steel head-bay dam"; No. 830; small view of dam |
18 |
4 |
0 |
Kentucky River |
Lock No. 4 |
11/18/1929 |
"Buick car No. 1097"; No. 832; close view of car |
18 |
4 |
0 |
Kentucky River |
Lock No. 4 |
11/18/1929 |
"Buick car No. 1097"; No. 833; close view of car |
18 |
7 |
0 |
Kentucky River |
Lock No. 7 |
11/25/1929 |
"Dismounting lower gate, land leaf"; No. 834; small view of leaf |
18 |
7 |
0 |
Kentucky River |
Lock No. 7 |
12/7/1929 |
"Locking with one old and one new lower leaf"; No. 835; close view of lock |
18 |
7 |
0 |
Kentucky River |
Lock No. 7 |
12/7/1929 |
"Locking with one old and one new lower leaf"; No. 836; close view of lock |
18 |
14 |
0 |
Kentucky River |
Lock No. 14 |
12/21/1929 |
"Head bay dam in place"; No. 837; close view of dam |
18 |
14 |
0 |
Kentucky River |
Lock No. 14 |
12/23/1929 |
"Head bay dam in place"; No. 838; close view of dam |
18 |
14 |
0 |
Kentucky River |
Lock No. 14 |
12/23/1929 |
"Spiders from upper land-wall valves"; No. 839; close view of parts |
18 |
14 |
0 |
Kentucky River |
Lock No. 14 |
12/23/1929 |
"Spiders from upper wall valves"; No. 840; close view of parts |
18 |
14 |
0 |
Kentucky River |
Lock No. 14 |
12/26/1929 |
"Removing head-bay dam"; No. 841; small view of work |
18 |
14 |
0 |
Kentucky River |
Lock No. 14 |
12/26/1929 |
"Removing foot-bay dam"; No. 842; small view of work |
18 |
7 |
0 |
Kentucky River |
Lock No. 7 |
1/7/1930 |
"Dismounting old river leaf, lower gate"; No. 843; small view of site |
18 |
7 |
0 |
Kentucky River |
Lock No. 7 |
1/7/1930 |
"Mounting new river leaf, lower gate"; No. 844; small view of site |
18 |
10 |
0 |
Kentucky River |
Lock No. 10 |
2/27/1930 |
"Broken upper guide pile clusters"; No. 845; small view of piles |
18 |
4 |
0 |
Kentucky River |
Lock No. 4 |
2/27/1930 |
"St. Clair St. Bridge"; No. 846; small view of bridge from above |
18 |
4 |
0 |
Kentucky River |
Lock No. 4 |
5/1/1930 |
"24" steel spare gate and ironworkers"; No. 847; small view of site |
18 |
4 |
0 |
Kentucky River |
Lock No. 4 |
5/1/1930 |
"Sup't C. H. McCrackin"; No. 848; close view of man |
18 |
0 |
0 |
Salyersville |
S. D. May |
5/9/1930 |
"Damage at S. D. May's - see No. 700"; No. 849; small view of river |
18 |
1 |
0 |
Kentucky River |
Lock No. 1 |
7/15/1930 |
"Filling coffer for repairing dam"; No. 850; small view of site |
18 |
1 |
0 |
Kentucky River |
Lock No. 1 |
7/15/1930 |
"Filling coffer"; No. 851; small view of site |
18 |
1 |
0 |
Kentucky River |
Lock No. 1 |
7/16/1930 |
"Diver stopping leaks through the holes"; No. 852; small view of site |
18 |
1 |
0 |
Kentucky River |
Lock No. 1 |
7/16/1930 |
"Diver plugging hole in slope with concrete in bags"; No. 853; small view of site |
18 |
5 |
0 |
Kentucky River |
Lock No. 5 |
7/29/1930 |
"Shattered masonry - lower gate anchorage"; No. 854; close view of wall |
18 |
5 |
0 |
Kentucky River |
Lock No. 5 |
7/31/1930 |
"Concreting lower gate anchorage"; No. 855; close view of work |
18 |
5 |
0 |
Kentucky River |
Lock No. 5 |
7/31/1930 |
"Concreting lower gate anchorage"; No. 856; close view of work |
18 |
5 |
0 |
Kentucky River |
Lock No. 5 |
8/4/1930 |
"Dismounting land leaf, upper gate"; No. 857; close view of gate |
18 |
5 |
0 |
Kentucky River |
Lock No. 5 |
8/4/1930 |
"Repairing valves, land leaf, upper gate"; No. 858; small view of work |
18 |
5 |
0 |
Kentucky River |
Lock No. 5 |
8/4/1930 |
"Quarterboat No. 196"; No. 859; small view of boat |
18 |
4 |
0 |
Kentucky River |
Lock No. 4 |
8/8/1930 |
"Flow over dam during record drought"; No. 860; small view of dam |
18 |
4 |
0 |
Kentucky River |
Lock No. 4 |
8/8/1930 |
"Closing the head-bay dam"; No. 861; small view of site |
18 |
4 |
0 |
Kentucky River |
Lock No. 4 |
8/8/1930 |
"Foot-bay dam in position"; No. 862; small view of dam |
18 |
4 |
0 |
Kentucky River |
Lock No. 4 |
8/9/1930 |
"Lock unwatered"; No. 863; close view of lock |
18 |
4 |
0 |
Kentucky River |
Lock No. 4 |
8/9/1930 |
"Upper mitre-sill"; No. 864; close view of sill |
18 |
4 |
0 |
Kentucky River |
Lock No. 4 |
8/10/1930 |
"Lock unwatered"; No. 865; close view of lock |
18 |
4 |
0 |
Kentucky River |
Lock No. 4 |
8/10/1930 |
"Lower mitre-sill"; No. 866; small view of work |
18 |
4 |
0 |
Kentucky River |
Lock No. 4 |
8/10/1930 |
"Lower mitre-sill"; No. 867; small view of work |
18 |
4 |
0 |
Kentucky River |
Lock No. 4 |
8/11/1930 |
"Upper mitre-sill"; No. 868; small view of work |
18 |
0 |
0 |
Kentucky River |
Dam No. 6 |
8/20/1930 |
"Overflow during record drought"; No. 870; small view of dam |
18 |
6 |
0 |
Kentucky River |
Lock No. 6 |
8/21/1930 |
"Renewing top timbers of gates"; No. 871; small view of site |
18 |
6 |
0 |
Kentucky River |
Lock No. 6 |
8/21/1930 |
"Condition of upper gate"; No. 872; close view of gate |
18 |
6 |
0 |
Kentucky River |
Lock No. 6 |
8/21/1930 |
"Chipping overhang, upper guard pier"; No. 873; small view of site |
18 |
0 |
0 |
Frankfort, KY |
|
8/21/1930 |
"The R. W. Turner and tow of oil"; No. 874; distant view of river |
18 |
6 |
0 |
Kentucky River |
Lock No. 6 |
9/1/1930 |
"Repair of lower gate completed"; No. 875; small view of gate |
18 |
6 |
0 |
Kentucky River |
Lock No. 6 |
9/1/1930 |
"Repair of upper gate completed"; No. 876; small view of gate |
18 |
6 |
0 |
Kentucky River |
Lock No. 6 |
9/4/1930 |
"Repair of upper guard pier completed"; No. 877; close view of pier |
18 |
6 |
0 |
Kentucky River |
Lock No. 6 |
9/5/1930 |
"Chenoka and tow of 7 pieces"; No. 878; small view of boat |
18 |
6 |
0 |
Kentucky River |
Lock No. 6 |
9/5/1930 |
"Chenoka and tow of 7 pieces"; No. 879; small view of boat |
18 |
0 |
0 |
Wolfe County |
|
9/13/1930 |
"View from Slade Hill: No. 880; distant view of land |
18 |
0 |
0 |
Perry County |
|
9/13/1930 |
"Water Mill on North Fork"; No. 881; small view of mill |
18 |
0 |
0 |
Letcher County |
|
9/14/1930 |
"View of Jenkins from Pound Gap"; No. 882; distant view of land |
18 |
0 |
0 |
Twelve Pole Creek |
|
9/15/1930 |
"Undershot water wheel mill"; No. 883; small view of wheel |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
9/17/1930 |
"Condition of dam and lower slope"; No. 884; small view of dam |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
9/17/1930 |
"Unloading backing above auxiliary dam"; No. 885; small view of dam |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
9/17/1930 |
"Leak under the dam, boil in corner of dam and river wall"; No. 886; small view of leak |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
9/17/1930 |
"Boil at corner of dam and river wall"; No. 887; close view of leak |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
9/17/1930 |
"Erosion and leaks, lower slope, main dam"; No. 888, close view of erosion |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
9/17/1930 |
"Erosion and leaks, lower slope, main dam"; No. 889, close view of erosion |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
9/20/1930 |
"Patching lower slope, main dam"; No. 890; small view of slope |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
9/24/1930 |
"Patching lower slope, main dam"; No. 891; small view of slope |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
9/24/1930 |
"Patched lower slope, main dam"; No. 892; small view of slope |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
9/24/1930 |
"Banking above auxiliary dam"; No. 893; small view of dam |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
9/24/1930 |
"Lower slope, auxiliary dam"; No. 894; close view of dam |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
9/29/1930 |
"Patched lower slope, auxiliary dam"; No. 895, small view of dam |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
9/29/1930 |
"Patched lower slope, main dam"; No. 896, small view of dam |
18 |
0 |
0 |
Kentucky River |
Clay's Ferry |
10/10/1930 |
"Great Kentucky River Fault"; No. 897; small view of cliff |
18 |
10 |
0 |
Kentucky River |
Lock No. 10 |
10/13/1930 |
"Washing slope of main dam"; No. 898; small view of dam |
18 |
10 |
0 |
Kentucky River |
Lock No. 10 |
10/15/1930 |
"Cement gunning slope of main dam"; No. 899; small view of dam |
18 |
10 |
0 |
Kentucky River |
Lock No. 10 |
9/15/1930 |
"Cement gunning slope of main dam"; No. 900; small view of dam |
18 |
10 |
0 |
Kentucky River |
Lock No. 10 |
10/15/1930 |
"Face of land wall"; No. 901; close view of wall |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
10/20/1930 |
"Low water"; No. 902; close view of dam |
18 |
10 |
0 |
Kentucky River |
Lock No. 10 |
10/21/1930 |
"Lower slope of dam, repaired by cement gun"; No. 903; close view of dam |
18 |
10 |
0 |
Kentucky River |
Lock No. 10 |
10/21/1930 |
"Lock walls patched by cement gun"; No. 904; small view of wall |
18 |
10 |
0 |
Kentucky River |
Lock No. 10 |
10/21/1930 |
"Cement gun patching the lock walls"; No. 905; small view of lock |
18 |
11 |
0 |
Kentucky River |
Lock No. 11 |
10/28/1930 |
"Repairs to land wall gate completed"; No. 906; small view of lock |
18 |
0 |
0 |
Boonesboro |
|
10/15/1930 |
"Hauling water to farms"; No. 907; small view of tanker trucks |
18 |
11 |
0 |
Kentucky River |
Lock No. 11 |
10/30/1930 |
"Dismounting river leaf, lower gate"; No. 908; small view of lock |
18 |
11 |
0 |
Kentucky River |
Lock No. 11 |
10/30/1930 |
"River leaf of lower gate"; No. 909; small view of leaf |
18 |
11 |
0 |
Kentucky River |
Lock No. 11 |
11/3/1930 |
"Land leaf of upper gate, dismounted"; No. 910; small view of leaf |
18 |
11 |
0 |
Kentucky River |
Lock No. 11 |
11/3/1930 |
"Land leaf, upper gate, dismounted"; No. 911; close view of leaf |
18 |
11 |
0 |
Kentucky River |
Lock No. 11 |
11/3/1930 |
"lower slope of dam"; No. 912; small view of dam |
18 |
11 |
0 |
Kentucky River |
Lock No. 11 |
11/3/1930 |
"lower slope of dam"; No. 913; small view of dam |
18 |
10 |
0 |
Kentucky River |
Lock No. 10 |
11/14/1930 |
"Lower gate, land leaf, dismounted"; No. 914; close view of leaf |
18 |
10 |
0 |
Kentucky River |
Lock No. 10 |
11/14/1930 |
"Lower gate, land leaf, dismounted"; No. 915; close view of leaf |
18 |
10 |
0 |
Kentucky River |
Lock No. 10 |
11/19/1930 |
"Repairs of lower gate completed"; No. 916; small view of gate |
18 |
10 |
0 |
Kentucky River |
Lock No. 10 |
11/19/1930 |
"Dwellings"; No. 917; small view of homes |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
11/28/1930 |
"'Boil' in corner of dam and lock"; No. 918; small view of leak |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
11/28/1930 |
"Raven Creek bar"; No. 919; small view of boat |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
11/28/1930 |
"Lexington Water Co's pumping station"; No. 920; small view of station |
18 |
0 |
0 |
Kentucky River |
Pool No. 9 |
11/28/1930 |
"Lexington Water Co's pipeline and pumping station"; No. 921; small view of station |
18 |
10 |
0 |
Kentucky River |
Lock No. 10 |
11/24/1930 |
"Upper guide pile clusters"; No. 922; close view of piles |
18 |
10 |
0 |
Kentucky River |
Lock No. 10 |
12/1/1930 |
"Upper guide pile clusters"; No. 923; close view of piles |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/9/1930 |
"Main dam, surfaced"; No. 924; small view of dam |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/9/1930 |
"Auxiliary dam, surfaced"; No. 925; small view of dam |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/9/1930 |
"Boil below the dam"; No. 926; small view of leak |
18 |
10 |
0 |
Kentucky River |
Lock No. 10 |
10/13/1930 |
"Condition of lower slope, main dam"; No. 927; close view of dam |
18 |
10 |
0 |
Kentucky River |
Lock No. 10 |
10/16/1930 |
"Condition of lockwall"; No. 928; small view of wall |
18 |
10 |
0 |
Kentucky River |
Lock No. 10 |
12/11/1930 |
"Upper guide pile clusters"; No. 929; close view of piles |
18 |
10 |
0 |
Kentucky River |
Lock No. 10 |
12/11/1930 |
"Upper guide pile clusters"; No. 930; close view of piles |
18 |
10 |
0 |
Kentucky River |
Lock No. 10 |
12/16/1930 |
"Upper guide pile clusters"; No. 931; close view of piles |
18 |
10 |
0 |
Kentucky River |
Lock No. 10 |
12/16/1930 |
"Upper guide pile clusters"; No. 932; close view of piles |
18 |
10 |
0 |
Kentucky River |
Lock No. 10 |
12/16/1930 |
"Upper guide pile clusters"; No. 933; close view of piles |
18 |
0 |
0 |
Kentucky River |
Pool No. 9 |
12/12/1930 |
"Lexington Water Co's pumping station"; No. 934; small view of station |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
12/18/1930 |
"Repairing uper guide pile clusters"; No. 935; close view of piles |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
12/18/1930 |
"Repairing uper guide pile clusters"; No. 936; close view of piles |
18 |
6 |
0 |
Kentucky River |
Lock No. 6 |
7/13/1931 |
"Chipping off overhang of upper guard wall"; No. 937; small view of wall |
18 |
6 |
0 |
Kentucky River |
Lock No. 6 |
7/13/1931 |
"Chipping off overhang of upper guard wall"; No. 938; small view of wall |
18 |
7 |
0 |
Kentucky River |
Lock No. 7 |
7/23/1931 |
"Dismounting old land leaf, upper gate"; No. 939; small view of leaf |
18 |
7 |
0 |
Kentucky River |
Lock No. 7 |
7/23/1931 |
"Lifting new land leaf, upper gate"; No. 940; small view of leaf |
18 |
7 |
0 |
Kentucky River |
Lock No. 7 |
7/23/1931 |
"Locking with 1 old and 1 new leaves, upper gate"; No. 941; close view of lock |
18 |
7 |
0 |
Kentucky River |
Lock No. 7 |
7/23/1931 |
"New upper gate mounted, but not fitted"; No. 942; close view of lock |
18 |
7 |
0 |
Kentucky River |
Lock No. 7 |
7/23/1931 |
"New upper gate mounted, but not fitted"; No. 943; close view of lock |
18 |
0 |
0 |
Boonesboro |
|
7/24/1931 |
"Falsework for bridge main span"; No. 944; small view of bridge |
18 |
0 |
0 |
Boonesboro |
|
7/24/1931 |
"Falsework for bridge main span"; No. 945; small view of bridge |
18 |
0 |
0 |
Boonesboro |
|
7/25/1931 |
"Falsework for bridge"; No. 946; small view of bridge |
18 |
0 |
0 |
Repair Yard |
|
7/27/1931 |
"Loading No. 8 upper gate"; No. 947; small view of site |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
8/3/1931 |
"Mounting land leaf, upper gate"; No. 948; small view of site |
18 |
7 |
0 |
Kentucky River |
Lock No. 7 |
7/26/1931 |
"Head-bay dam in place"; No. 949; close view of dam |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
8/3/1931 |
"Mounting land leaf, upper gate"; No. 950; small view of site |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
8/3/1931 |
"Mounting land leaf, upper gate"; No. 951; small view of site |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
8/3/1931 |
"Locking, 1 old and 1 new leaf, upper gate"; No. 952; close view of leaf |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
8/4/1931 |
"Mounting river leaf, upper gate"; No. 953; small view of site |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
8/4/1931 |
"River leaf, upper gate, mounted"; No. 954; close view of site |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
8/4/1931 |
"Upper gate mounted but not fitted"; No. 955; close view of gate |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
8/5/1931 |
"Head-bay for fitting gate leaves"; No. 956; close view of leaf |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
8/5/1931 |
"Fitting new upper gate"; No. 957; close view of site |
18 |
8 |
0 |
Kentucky River |
Lock No. 8 |
8/5/1931 |
"Fitting new upper gate"; No. 958; close view of site |
18 |
0 |
0 |
West Liberty |
|
8/8/1931 |
"New state highway bridge"; No. 959; small view of bridge |
18 |
0 |
0 |
Boonesboro |
|
8/12/1931 |
"Main span erected, falsework nearly removed"; No. 960; small view of bridge |
18 |
14 |
0 |
Kentucky River |
Lock No. 14 |
8/14/1931 |
"Head-bay in place"; No. 961; close view of dam |
18 |
14 |
0 |
Kentucky River |
Lock No. 14 |
8/14/1931 |
"Valves and upper gate"; No. 962; small view of dam |
18 |
14 |
0 |
Kentucky River |
Lock No. 14 |
8/14/1931 |
"Fault on the abutment side"; No. 963; small view of river |
18 |
12 |
0 |
Kentucky River |
Lock No. 12 |
8/22/1931 |
"Head-bay dam in place"; No. 964; close view of dam |
18 |
12 |
0 |
Kentucky River |
Lock No. 12 |
8/22/1931 |
"Sand-blasting the upper gate"; No. 965; close view of gate |
18 |
12 |
0 |
Kentucky River |
Lock No. 12 |
8/22/1931 |
"Head-bay, upper gate, valves"; No. 966; small view of valves |
18 |
12 |
0 |
Kentucky River |
Lock No. 12 |
8/22/1931 |
"Pavement to be rebuilt"; No. 967; small view of road |
18 |
12 |
0 |
Kentucky River |
Lock No. 12 |
8/28/1931 |
"Relaying pavement- ready for concrete"; No. 968; close view of road |
18 |
12 |
0 |
Kentucky River |
Lock No. 12 |
8/28/1931 |
"Repairing pavement - cutting trenches"; No. 969; small view of road |
18 |
12 |
0 |
Kentucky River |
Lock No. 12 |
8/31/1931 |
"Relaying pavement"; No. 970; small view of building |
18 |
12 |
0 |
Kentucky River |
Lock No. 12 |
8/31/1931 |
"Relaying pavement"; No. 971; small view of building |
18 |
12 |
0 |
Kentucky River |
Lock No. 12 |
8/31/1931 |
"Relaying pavement - moving the mixer"; No. 972; small view of building |
18 |
12 |
0 |
Kentucky River |
Lock No. 12 |
9/3/1931 |
"Relaying pavement"; No. 973; small view of building |
18 |
12 |
0 |
Kentucky River |
Lock No. 12 |
9/10/1931 |
"Relaying pavement"; No. 974; small view of building |
18 |
0 |
0 |
Boonesboro |
Bridge |
9/11/1931 |
"Boonesboro Highway Bridge"; No. 975; small view of bridge |
18 |
0 |
0 |
Boonesboro |
Ferry |
9/14/1931 |
"Boonesboro Ferry"; No. 976; small view of river |
18 |
12 |
0 |
Kentucky River |
Lock No. 12 |
9/16/1931 |
"Movable Crest - down"; No. 977; close view of dam |
18 |
12 |
0 |
Kentucky River |
Lock No. 12 |
9/16/1931 |
"Paving nearly relaid"; No. 978; close view of road |
18 |
12 |
0 |
Kentucky River |
Lock No. 12 |
9/16/1931 |
"Raising a-frame dam crest"; No. 979; close view of dam |
18 |
12 |
0 |
Kentucky River |
Lock No. 12 |
9/25/1931 |
"Weep holes drilled through lower guide wall"; No. 980; close view of wall |
18 |
12 |
0 |
Kentucky River |
Lock No. 12 |
9/29/1931 |
"Double exposure - weep holes - sand blasting lower gate"; No. 981; view of gate |
18 |
12 |
0 |
Kentucky River |
Lock No. 12 |
9/29/1931 |
"Sand blasting lower gate"; No. 982; close view of gate |
18 |
12 |
0 |
Kentucky River |
Lock No. 12 |
10/1/1931 |
"Painting needleboat No. 57"; No. 983; small view of boat |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/7/1931 |
"Land leaf, lower gate, dismounted"; No. 984; small view of gate |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/7/1931 |
"Heel of land leaf, lower gate"; No. 985; close view of leaf |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/7/1931 |
"Corrosion, land leaf, lower gate"; No. 986; close view of gate |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/12/1931 |
"Land leaf, lower gate, sand-blasted and painted"; No. 987; close view of gate |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/12/1931 |
"Land leaf, lower gate, painted"; No. 988; close view of gate |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/15/1931 |
"Fitting timbers to land leaf"; No. 989, close view of gate |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/15/1931 |
"Fitting timbers to land leaf, lower gate"; No. 990, close view of gate |
18 |
0 |
0 |
Tyrone |
Bridge |
10/16/1931 |
"Erecting Tyrone Highway Bridge"; No. 991; small view of site |
18 |
0 |
0 |
Tyrone |
Bridge |
10/16/1931 |
"Piers, Tyrone Highway Bridge"; No. 992; distant view of bridge |
18 |
5 |
0 |
Kentucky River |
Lock No. 5 |
10/16/1931 |
"Leak at lower sill, lower gate"; No. 993; close view of gate |
18 |
5 |
0 |
Kentucky River |
Lock No. 5 |
10/16/1931 |
"Leaks at upper gate"; No. 994; close view of gate |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/19/1931 |
"Dismounting river leaf, lower gate"; No. 995; small view of boat |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/19/1931 |
"River leaf, lower gate, conndition of miter timbers"; No. 996; close view of timbers |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/19/1931 |
"River leaf, lower gate, condition of quoin timbers"; No. 997; close view of timbers |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/19/1931 |
"river leaf, lower gate"; No. 998; close view of gate |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/20/1931 |
"River leaf, lower gate, sandblasted and painted one side"; No. 999; close view of gate |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/20/1931 |
"River leaf, lower gate, sandblasting - dust cloud"; No. 1000; close view of gate |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/23/1931 |
"Lower gate - fitting timbers and shoe"; No. 1001; close view of work |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/26/1931 |
ower gate, remounted"; No. 1002; close view of gate |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/23/1931 |
"Leakage at upper gate"; No. 1003; small view of gate |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/26/1931 |
"Condition of seal timbers, upper gate"; No. 1004; small view of gate |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/23/1931 |
"Group of workmen"; No. 1005; small view of group |
18 |
0 |
0 |
Dix Dam |
|
10/23/1931 |
"View of dam and spillway"; No. 1006; small view of dam |
18 |
0 |
0 |
Brooklyn |
|
10/23/1931 |
"View of Brooklyn Bridge and tunnel"; No. 1007; distant view of bridge |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/29/1931 |
"Head-bay dam"; No. 1008; close view of dam |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/29/1931 |
"Sandblasting and painting the upper gate"; No. 1009; close view of work |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
10/29/1931 |
"Leaks through auxiliary dam alnost stopped"; No. 1010; close view of dam |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
11/2/1931 |
"Framing miter post timbers, upper gate"; No 1011; close view of workers |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
11/2/1931 |
"Digging out fault concrete, upper miter sill"; No. 1012; small view of site |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
11/2/1931 |
"Upper miter wall - faulty concrete"; No. 1013; small view of site |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
11/2/1931 |
"Upper miter wall - faulty concrete"; No. 1014; small view of site |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
11/2/1931 |
"Leaks through auxiliary dam stopped"; No. 1015; small view of dam |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
11/7/1931 |
"River wall patched with gunite"; No. 1016; close view of wall |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
11/7/1931 |
"Patching land wall with the cement gun"; No. 1017; small view of site |
18 |
12 |
0 |
Kentucky River |
Lock No. 12 |
11/12/1931 |
"Weep holes in lower guide wall"; No. 1018; small view of wall |
18 |
1 |
0 |
Kentucky River |
Lock No. 1 |
11/19/1931 |
"Plugging holes in the dam apron"; No. 1219; small view of site |
18 |
5 |
0 |
Kentucky River |
Lock No. 5 |
11/25/1931 |
"Investigatin the head-bay sill"; No. 1220; close view of workers |
18 |
5 |
0 |
Kentucky River |
Lock No. 5 |
11/28/1931 |
"Head-bay dam in place"; No 1221; close view of site |
18 |
5 |
0 |
Kentucky River |
Lock No. 5 |
12/1/1931 |
"Upper gate, land leaf"; No. 1222; close view of leaf |
18 |
0 |
0 |
Tyrone, KY |
|
12/1/1931 |
"Southern R. R. & new highway bridges"; No. 1223; distant view of bridges |
18 |
5 |
0 |
Kentucky River |
Lock No. 5 |
12/1/1931 |
"Upper miter sill"; No. 1224; close view of dam |
18 |
5 |
0 |
Kentucky River |
Lock No. 5 |
12/1/1931 |
"Upper miter sill"; No. 1225; close view of dam |
18 |
10 |
0 |
Kentucky River |
Lock No. 10 |
12/17/1931 |
"Drift mat. In upper entrance"; No. 1226; close view of drift |
18 |
10 |
0 |
Kentucky River |
Lock No. 10 |
12/17/1931 |
"Drift in upper entrance partially removed"; No. 1227; close view of drift |
18 |
0 |
0 |
Elliston, KY |
|
12/17/1931 |
"View of Muddy Creek, Irvine Road"; No. 1228; small view of creek |
18 |
0 |
0 |
Courier Journa Rotogravure |
|
|
"Boonesboro Bridge"; distant view of bridge |
18 |
0 |
0 |
Courier Journa Rotogravure |
|
|
"Boonesboro Bridge"; distant view of bridge |
18 |
0 |
0 |
Tyrone |
|
12/26/1931 |
"Erection of Tyrone Bridge, also Young's High BDG."; No. 1229; distant view of bridge |
18 |
5 |
0 |
Kentucky River |
Lock No. 5 |
12/26/1931 |
"Leakage at lower gate"; No. 1230; close view of gate |
18 |
9 |
0 |
Kentucky River |
Lock No. 9 |
2/11/1932 |
"Trash at lower gate"; No. 1231; close view of gate |
18 |
0 |
0 |
Gratz |
|
2/25/1932 |
"Erection of steel in progress"; No. 1232; distant view of bridge |
18 |
10 |
0 |
Kentucky River |
Lock No. 10 |
2/29/1932 |
"Orange-Peel on it's side, on deposit. Gage 91"; No. 1233; small view of boat |
18 |
12 |
0 |
Kentucky River |
Lock No. 12 |
3/28/1932 |
"Rough water - up gage 34.0"; No. 1234; view of river |
18 |
3 |
0 |
Kentucky River |
Lock No. 3 |
4/18/1932 |
"general view of abutment crib"; No. 1235; distant view of dam |
18 |
3 |
0 |
Kentucky River |
Lock No. 3 |
4/18/1932 |
"Crib below the abutment"; No. 1236; distant view of dam |
18 |
3 |
0 |
Kentucky River |
Lock No. 3 |
4/18/1932 |
"Crib below the abutment"; No. 1237; distant view of dam |
18 |
0 |
0 |
Gratz |
Bridge |
4/29/1932 |
"Highway bridge nearing completion"; No. 1238; distant view of bridge |
18 |
0 |
0 |
Booneville |
|
5/6/1932 |
"Automatic gaging station"; No. 1239; distant view of site |
18 |
0 |
0 |
Airedale, KY |
|
5/6/1932 |
"Automatic gaging station"; No. 1240 distant view of site |
18 |
0 |
0 |
Beattyville, KY |
|
5/6/1932 |
"Bridge over South Fork"; No. 1241' distant view of bridge |
18 |
0 |
0 |
Beattyville, KY |
Pool No. 14 |
5/20/1932 |
"City of Beattyville"; No. 1242; distant view of city |
18 |
0 |
0 |
Beattyville, KY |
Pool No. 14 |
5/20/1932 |
"City of Beattyville"; No. 1243; distant view of city |
18 |
0 |
0 |
Frankfort |
|
5/24/1932 |
"St. Clair St. Bridge"; No. 1244; small view of bridge |
18 |
0 |
0 |
North Fork |
|
5/25/1932 |
"Highway bridge at Blackey"; No. 1245; small view of bridge |
18 |
0 |
0 |
North Fork |
|
5/25/1932 |
"Highway bridge at Blackey"; No. 1246; small view of bridge |
18 |
0 |
0 |
North Fork |
|
5/25/1932 |
"Mountains near Whitesburg"; No. 1247; distant view of mountains |
18 |
0 |
0 |
Cumberland Falls Road |
|
5/26/1932 |
"Mountaintop bridge"; No. 1248; distant view of bridge |
18 |
0 |
0 |
Cumberland Falls Road |
|
5/26/1932 |
No. 1249; close view of small falls |
18 |
0 |
0 |
Cumberland Falls Road |
|
5/26/1932 |
No. 1250; close view of small falls |
18 |
0 |
0 |
|
|
|
L-13/65; view of wall |
18 |
0 |
0 |
|
|
|
L-13/65.1; view of bank and land wall |
18 |
0 |
0 |
|
|
|
L-13/66; bank, showing erosion |
18 |
0 |
0 |
|
|
|
L-13/66.1; bank, showing erosion |
18 |
0 |
0 |
|
|
|
L13/67; lock gate |
18 |
0 |
0 |
|
|
|
L13/68; lock gates |
18 |
0 |
0 |
|
|
|
L13/69; detail of equipment |
18 |
0 |
0 |
|
|
|
L13/70; detail of equipment |
18 |
0 |
0 |
|
|
|
L13/71; working on gates |
18 |
0 |
0 |
|
|
|
L13/72; detail |
18 |
0 |
0 |
|
|
|
L13/73; lock gates |
18 |
0 |
0 |
|
|
|
L13/74; working on gates |
18 |
0 |
0 |
|
|
|
L13/75; working on gates |
18 |
0 |
0 |
|
|
|
L13/76; detail |
18 |
0 |
0 |
|
|
|
L13/77; working on lock gates |
18 |
0 |
0 |
|
|
|
L13/78; construction |
18 |
0 |
0 |
|
|
|
L13/79; lock gate |
18 |
0 |
0 |
|
|
|
L13/80; construction |
18 |
0 |
0 |
|
|
|
L13/81; construction |
18 |
0 |
0 |
|
|
|
L13/82; filling lock |
18 |
0 |
0 |
|
|
|
L13/83; lock gates |
18 |
0 |
0 |
|
|
|
L13/84; river bank |
18 |
0 |
0 |
|
|
|
L13/84.1; river bank |
18 |
13 |
0 |
Kentucky River |
Cave branch |
|
P13/2; downstream view of ice in pool |
18 |
13 |
0 |
Kentucky River |
Cave branch |
|
P13/2; downstream view of ice in pool |
18 |
13 |
0 |
Kentucky River |
Lock No. 13 |
|
P13/1; Gas boat and tow in pool |
18 |
13 |
0 |
Kentucky River |
Lock No. 13 |
|
P13/3; upstream view of ice in pool |
18 |
13 |
0 |
Kentucky River |
Lock No. 13 |
|
P13/4; upstream view of ice in pool |
18 |
13 |
0 |
Kentucky River |
Lock No. 13 |
|
P13/5; upstream view of ice in pool |
18 |
13 |
0 |
Kentucky River |
Lock No. 13 |
|
P13/6; upstream view of ice in pool |
18 |
13 |
0 |
Kentucky River |
Lock No. 13 |
|
P13/7; upstream view of ice in pool |
18 |
13 |
0 |
Kentucky River |
Lock No. 13 |
|
P13/8; upstream view of ice in pool |
18 |
13 |
0 |
Kentucky River |
Lock No. 13 |
|
L-13/63; Kentucky River - Lock No. 13, 1921 |
19 |
14 |
0 |
Kentucky River |
Lock No. 14 |
2/11/1936 |
L-14/122; upper entrance |
19 |
14 |
0 |
Kentucky River |
Lock No. 14 |
2/11/1936 |
L-14/123; upper entrance |
19 |
14 |
0 |
Kentucky River |
Lock No. 14 |
2/11/1936 |
L-14/124; lower approach |
19 |
14 |
0 |
Kentucky River |
Lock No. 14 |
2/11/1936 |
L-14/125; upper entrance |
19 |
0 |
0 |
|
|
|
old wooden bridge, Frankfort |
19 |
0 |
0 |
|
|
|
landwall |
19 |
0 |
0 |
|
|
|
L-14/126; construction, equipment |
19 |
0 |
0 |
|
|
|
L-14/127; construction, equipment |
19 |
0 |
0 |
|
|
|
L-14/127.1;construction, equipment |
19 |
0 |
0 |
|
|
|
L-14/128; view of dam |
19 |
0 |
0 |
|
|
|
L-14/129; view of area |
19 |
0 |
0 |
|
|
|
L14/130; view of lock and area |
19 |
0 |
0 |
|
|
|
L14/131; construction of lock |
19 |
0 |
0 |
|
|
|
L14/132; construction of lock |
19 |
0 |
0 |
|
|
|
L14/133; construction of lock |
19 |
0 |
0 |
|
|
|
L14/134; construction, machinery |
19 |
0 |
0 |
|
|
|
L14/135; lock wall |
19 |
0 |
0 |
|
|
|
L14/136; wall |
19 |
0 |
0 |
|
|
|
L14/137; filling lock |
19 |
0 |
0 |
|
|
|
L14/138; machinery in lock |
19 |
0 |
0 |
|
|
|
L14/139; machinery in lock |
19 |
0 |
0 |
|
|
|
L14/140; lock gates |
19 |
0 |
0 |
|
|
|
L14/141; lock gates |
19 |
0 |
0 |
|
|
|
L14/142; filling lock |
19 |
0 |
0 |
|
|
|
L14/143; lock wall |
19 |
0 |
0 |
|
|
|
L14/144; lock wall and gate |
19 |
0 |
0 |
|
|
|
L14/145; lock wall and gate |
19 |
0 |
0 |
|
|
|
L14/146; machinery in lock |
19 |
0 |
0 |
|
|
|
L14/147; lock wall and gate |
19 |
0 |
0 |
|
|
|
L14/149 |
19 |
0 |
0 |
|
|
|
L14/150; tow and barges; other boats |
19 |
0 |
0 |
|
|
|
L14/151; lock gates - filling locks |
19 |
0 |
0 |
|
|
|
L14/152; debris in river with woman |
19 |
0 |
0 |
|
|
|
L14/153; debris in river with man |
19 |
0 |
0 |
|
|
|
L14/154; debris in river with man |
19 |
0 |
0 |
|
|
|
L14/155; debris in river |
19 |
0 |
0 |
|
|
|
L14/156; debris in river |
19 |
0 |
0 |
|
|
|
L14/157; dwellings in flood |
19 |
0 |
0 |
|
|
|
L14/158; dwellings in flood |
19 |
0 |
0 |
|
|
|
L14/158.1; dwellings in flood |
19 |
0 |
0 |
|
|
|
L14/158.2; dwellings in flood |
19 |
0 |
0 |
|
|
|
L14/159; dwellings in flood |
19 |
0 |
0 |
|
|
|
L14/160; buildings in lock area |
19 |
0 |
0 |
|
|
|
L14/161; buildings in lock area |
19 |
0 |
0 |
|
|
|
L14/162; lock area |
19 |
0 |
0 |
|
|
|
L14/163; lock area |
19 |
0 |
0 |
|
|
|
L14/164; lock area, rip-rap |
19 |
0 |
0 |
|
|
|
L14/165; buildings during flood |
19 |
0 |
0 |
|
|
|
L14/166; buildings during flood |
19 |
0 |
0 |
|
|
|
L14/167; buildings during flood |
19 |
0 |
0 |
|
|
|
L14/168; view of river and opposite bank |
19 |
0 |
0 |
|
|
|
L14/169; view of river |
19 |
0 |
0 |
|
|
|
L14/170; store front |
19 |
0 |
0 |
|
|
|
L14/171; store front |
19 |
0 |
0 |
|
|
|
L14/172; buildings and rip-rap |
19 |
0 |
0 |
|
|
|
L14/173; buildings |
19 |
0 |
0 |
|
|
|
L14/174; buildings |
19 |
0 |
0 |
|
|
|
L14/175; rip-rap |
19 |
0 |
0 |
|
|
|
L14/176; house with man on porch |
19 |
0 |
0 |
|
|
|
L14/177; dwellings during flood |
19 |
0 |
0 |
|
|
|
L14/178; store scene |
19 |
0 |
0 |
|
|
|
L14/179; dwellings during flood |
19 |
0 |
0 |
|
|
|
L14/180; rip-rap |
19 |
0 |
0 |
|
|
|
L14/181; man standing on rip-rap |
19 |
0 |
0 |
|
|
|
L14/182; rip-rap |
19 |
0 |
0 |
|
|
|
L14/183; building |
19 |
0 |
0 |
|
|
|
L14/184; man seated on rip-rap |
19 |
0 |
0 |
|
|
|
L14/185; workman working on rip-rap |
19 |
0 |
0 |
|
|
|
L14/186; workman working on rip-rap |
19 |
0 |
0 |
|
|
|
L14/187; man standing on worksite |
19 |
0 |
0 |
|
|
|
L14/188; bank with rip-rap |
19 |
0 |
0 |
|
|
|
L14/189; rip-rap |
19 |
0 |
0 |
|
|
|
L14/190; rip-rap |
19 |
0 |
0 |
|
|
|
L14/191; bank and rip-rap |
19 |
0 |
0 |
|
|
|
L14/192; rip-rap |
19 |
0 |
0 |
|
|
|
L14/193; rip-rap |
19 |
0 |
0 |
|
|
|
L14/194; debris in river |
19 |
0 |
0 |
|
|
|
L14/195; debris in river |
19 |
0 |
0 |
|
|
|
L14/196; workmen clearing debris |
19 |
0 |
0 |
|
|
|
L14/197; workmen clearing debris |
19 |
0 |
0 |
|
|
|
L14/198; workmen clearing debris |
19 |
0 |
0 |
|
|
|
L14/199; workmen clearing debris |
19 |
0 |
0 |
|
|
|
L14/200; workmen clearing debris |
19 |
0 |
0 |
|
|
|
L14/201; debris in river |
19 |
0 |
0 |
|
|
|
L14/201.1; debris in river |
19 |
0 |
0 |
|
|
|
L14/202; workmen clearing debris |
19 |
0 |
0 |
|
|
|
L14/203; workmen clearing debris |
19 |
0 |
0 |
|
|
|
L14/204; workmen clearing debris |
19 |
0 |
0 |
|
|
|
L14/205; debris in river |
19 |
0 |
0 |
|
|
|
L14/206; debris in river |
19 |
0 |
0 |
|
|
|
L14/207; workmen clearing debris |
19 |
0 |
0 |
|
|
|
L14/208; workmen clearing debris |
19 |
0 |
0 |
|
|
|
P14/1; flood scene |
19 |
0 |
0 |
|
|
|
P14/2; river, bridge, dwellings |
19 |
0 |
0 |
|
|
|
P14/3; building along river |
19 |
0 |
0 |
|
|
|
P14/4; house |
19 |
0 |
0 |
|
|
|
P14/5; flood scene |
19 |
0 |
0 |
|
|
|
L + N R. R. Bridge |
19 |
0 |
0 |
|
|
|
N.F. 1; bridge over North Fork |
19 |
0 |
0 |
|
|
|
N.F. 3; Hazard, KY Municipal foot bridge |
19 |
0 |
0 |
|
|
|
N.F. 4; Hazard, KY Municipal foot bridge |
19 |
0 |
0 |
|
|
|
N.F. 5; Typo, Ky - county foot bridge |
19 |
0 |
0 |
|
|
|
N.F. 6; bridge over North Fork |
19 |
0 |
0 |
|
|
|
N.F. 7; L & N R. R. bridge over North Fork |
19 |
0 |
0 |
|
|
|
N.F. 8; KY state highway bridge over Quicksand creek |
19 |
0 |
0 |
|
|
|
N.F.9; KY state highway bridge at Quicksand, KY |
19 |
0 |
0 |
|
|
|
N.F.10; County bridge over North Fork at Quicksand, KY |
19 |
0 |
0 |
|
|
|
N.F.11; state hwy bridge over North Fork at Quicksand, KY |
19 |
0 |
0 |
|
|
|
N.F.12; state hwy bridge under construction over North Fork at Quicksand, KY |
19 |
0 |
0 |
|
|
|
N.F.13; foot bridge over North Fork at Kragon, KY |
19 |
0 |
0 |
|
|
|
N.F.14; L & N R. R. bridge over North Fork |
19 |
0 |
0 |
|
|
|
N.F.15; L & N R. R. bridge over North Fork at Hazard, KY |
19 |
0 |
0 |
|
|
|
N.F.16; bridge over North Fork |
19 |
0 |
0 |
|
|
|
N.F.17; bridge over North Fork AT Hazard, KY |
19 |
0 |
0 |
|
|
|
N.F.19; KY state highway bridge over North Fork |
19 |
0 |
0 |
|
|
|
N.F.20; KY state highway bridge over North Fork |
19 |
0 |
0 |
|
|
|
Dam No. 13, July 25, 1922 |
19 |
0 |
0 |
|
|
|
N. F. 22; County bridge over North Fork |
19 |
0 |
0 |
|
|
|
Dam No. 13, July 25, 1922 |
19 |
0 |
0 |
|
|
|
bridge over North Fork |
19 |
0 |
0 |
|
|
|
bridge over North Fork |
19 |
10 |
1 |
Kentucky River |
Lock No. 10/2 |
10/2/1902 |
H11-K10-1 |
19 |
10 |
2 |
Kentucky River |
Lock No. 10/8 |
|
H11-K10-5 |
19 |
10 |
3 |
Kentucky River |
Lock No. 10/5 |
|
H11-K10-2 |
19 |
10 |
4 |
Kentucky River |
Lock No. 10/6 |
|
H11-K10-3 |
19 |
10 |
5 |
Kentucky River |
Lock No. 10/7 |
|
H11-K10-4 |